Waterford Appliances T25-LP Planning Your venting Installation, For your particular installation

Page 11

INSTALLATION

RESIDENTIAL AND MANUFACTURED HOMES / MOBILE HOMES

MINIUMUM HORIZONTAL TERMINATION INSTALLATIONS

Planning Your venting Installation

See page 9 for Exterior Vent Termination requirements. The T25 is approved for a minimum horizontal termination with the Regen- cy Riser Vent Kit. See the diagram for minimum and maximum pipe lengths.

When planning your installation, it will be nec- essary to select the proper length of vent pipe for your particular requirements. Determine the minimum clearance to combustibles from the rear of the unit to the wall. It is also important to note the wall thickness. Before cutting the vent hole through the wall ensure that ALL vent and termination clearances (see page 10) will be met.

The venting arrangements shown on the dia- gram, have a minimum of 75% (flue loss) efficiency with Fan Off, as required for man- ufactured homes. (Actual efficiency may be as high as 85%.)

*If this is an outside corner, the minimum dis- tance between the vent and the outside corner is 6" (15cm). See "F" on the diagram on page 10.

NOTE: Ensure compliance with the outside vent terminal location before cutting hole as both dimensions must be met.

You will require the following components with your new Regency Rear Vent Direct Vent Freestanding Gas Stove. Please review your product to make sure you have everything you need. In the event that you are missing any part, contact your dealer.

Decorative brass or chrome trim kits are available from Simpson Dura-Vent for their wall thimbles, as well as a square

wall thimble cover.

Note: These are the minimum pieces re-

quired. Other parts may be required

for your particular installation.

Minimum components for a Horizontal Installation:

640-944

Horizontal Termination Kit which includes:

 

1

946-201

6-5/8" Dia. x 18" Black Pipe

 

1

946-207

4" Dia. x 18" Aluminum Vent

 

1

946-202

Wall Penetration Heat Shield (Wall Thimble) (2 pcs)

 

1

640-530

Riser Vent Terminal

 

1

640-545

Decorative Wall Trim (Black)

 

1

948-128

Tube Mill-Pac

945G*

1

45o Elbow

Screws

 

946-219

1 Adapter

 

Optional Components:

 

946-204

 

45o Elbow - 6-5/8" Black pipe

 

 

and 4" Aluminum Vent

946-205

 

Vinyl Siding Shield for Riser Vent

 

 

Terminal

 

946-208/P

 

Vent Guard

 

940

 

Square Wall Thimble Cover*

981Snorkel Termination (36")*

982Snorkel Termination (14")*

942Wall Penetration Heat Shield*

* Simpson Dura-Vent components

Waterford TARA T25 Direct Vent Freestanding Gas Stove

11

Image 11
Contents Tara Direct Vent Freestanding Gas Stove To the New Owner WaterfordTable of Contents Copy of Safety Label for Tara T25 Gas Stove Safety LabelInformation for Mobile Manufactured Homes After First Sale InstallationSpecifications Save These InstructionsClearances to Combustibles General Safety InformationInstallation Checklist Manufactured Mobile Home Additional RequirementsTara Clearances Optional FAN InstallationLocating Your GAS Stove Installation Combustion and Ventilation AIR Exterior Vent Terminal Quired. Other parts may be required Planning Your venting InstallationFor your particular installation Minimum components for a Horizontal InstallationSnorkel Terminations Horizontal InstallationsBelow Grade Snorkel Installation Alternate Approved Caps Vertical Termination with CO-LINEAR Flex SystemDescription Qty. Description DV Stove Horizontal Vent KITDURA-VENT Termination KIT Planning Your Dura-Vent InstallationAlternate Horizontal Termination Caps Rigid Pipe Venting Components4DT-AJB Rigid Pipe Venting Components ListFor both Residential & Manufactured Homes/Mobile Homes Rigid Pipe Venting Horizontal TerminationsRigid Pipe Venting Vertical Terminations Vent Restrictor DURA-VENT Horizontal InstallationsTermination Round Support RDS Square Support SQS Offset ChartCathedral Ceilings Support Extensions Round Rdse or Square SqseConverting a Factory Built Metal Chimney Converting a Masonry ChimneySystem Data Tara T25 High ElevationValve Description GAS Pipe Pressure TestingGAS Connection Conversion KIT From Natural GAS To PropaneReplace yellow Natural Gas label with red Propane label Securing Cast Iron Front Panel Aeration AdjustmentRemoving Cast Iron Front Panel Optional Front GrillOptional Wall Thermostat LOG InstallationOptional Side Shelf Final Check Optional Remote ControlWiring Diagram Tara Thermostat Wire TableOperating Instructions Sounds LOG Replacement MaintenanceMaintenance Instructions General Vent MaintenanceInstalling Valve Assembly Glass ReplacementFAN Maintenance Valve MaintenanceReplacement / Spare Parts List Parts ListPage Conditions WarrantyRegister your Waterford online at