Regency U32S-LP5 Installation, CONVERSION KIT # 434-969FROM NG TO LP, LP Conversion Kit Contains

Page 11
CONVERSION KIT # 434-969 FROM NG TO LP

INSTALLATION

CONVERSION KIT # 434-969 FROM NG TO LP

U32S-5 using SIT 820 NOVA Gas Valve

THIS CONVERSION MUST BE DONE BY A QUALIFIED GAS FITTER

IF IN DOUBT DO NOT DO THIS CONVERSION !!

Each Kit contains one LP Conversion Kit and one DC Sparker Kit.

LP Conversion Kit Contains:
Qty. Part #

Description

1

904-163

Burner Orifice #54

1

918-590

Decal "Converted to

 

 

LPG"

1

908-528

Red "LPG" label

1

904-529

5/32" Allen Key

1

910-037

LPG Injector

 

 

(Pilot Orifice)

1

918-480

Instruction Sheet

DC Sparker Kit Contains:

Qty. Part #

Description

1

820-475

Bracket DC Sparker

1

820-476

Bracket DC Sparker

1

904-153

Washer #8 External Star

1

904-330

Nut 8-32 Hex

1904-438 Plug Nylon 0.750 Hole, Black (for H25 only)

1904-531 Bushing Split Plastic

0.500 in.

1904-543 Screw 8-32 x 3/4 Pan Head

2904-553 Screw #8 x 1/2 Type

 

 

"B", Black Oxide

1

910-073

Spark Generator

 

 

Battery Holder

1

910-074

Spark Generator

 

 

Switch C/W Wire

1910-078 Battery Size AA Energizer En91

2910-199 Clip Wire Holder

1

910-903

Wire Fan To Power Cord

 

 

Ground 30 in.

 

904-781

Velcro Hook, Black

 

904-782

Velcro Hook, Black

1)Turn off the gas supply.

2)Remove the glass door.

a)Release the two hooks from the bottom of the glass door.

b)Swing the door out 45 degrees from the bottom and lift up and out.

3)Remove the burner by undoing the 2 screws as shown below.

Burner

4)After screws have been removed, slide the burner to the left, then lift out carefully.

5)Remove the base cover by lifting up from the back, then maneover it out.

Lift up from the back.

6)Remove burner orifice with a 1/2" wrench and discard.

Burner Orifi ce

7)Install the new LP burner orifice stamped #54 and tighten.

8)Remove the pilot shield by removing the 2 screws as shown below.

Base Cover

U32S-5 FPI Direct Vent Gas Insert

11

Image 11
Contents 918-788 Installation ManualU32 Sunrise Gas Insert OwnersTO THE NEW OWNER PARTS LIST TABLE OF CONTENTSSAFETY LABEL MAINTENANCESAFETY LABEL 5.08 Modifications to NFPA-54,Chapter REQUIREMENTSMA Code - CO Detector for the State of Massachusetts onlyU32S-5FPI Direct Vent Gas Insert UNIT DIMENSIONSGAS PRESSURE TESTING INSTALLATIONFOR YOUR SAFETY SPECIFICATIONSMANUFACTURED MOBILE HOME ADDITIONAL REQUIREMENTS INSTALLATIONINSTALLATION CHECKLIST MINIMUM FIREPLACE DIMENSIONSCOMBUSTIBLE MANTEL INSTALLATIONGAS CONNECTION VENTINGGAS INSERT AERATION SYSTEM INSTALLATIONFLUE LINER INSTALLATION GAS PIPE PRESSURE TESTINGIF IN DOUBT DO NOT DO THIS CONVERSION INSTALLATIONU32S-5using SIT 820 NOVA Gas Valve CONVERSION KIT # 434-969FROM NG TO LPthe wrench by the short side INSTALLATIONInstaller Notice Do not overtighten the screw. Recommended to gripGround wire from kit INSTALLATIONInstallation of the DC Sparker Ignitor Wire Piezo Ignitorremote control the 120V wires INSTALLATIONOPTIONAL REMOTE CONTROL to the 120V wires Thermostat Wire Tableto disconnection when servicing INSTALLATIONWIRING DIAGRAMS CAUTION Label all wires priorINSTALLATION Minimum Air shutter Opening INSTALLATIONINSTALLATION ON BURNER GLASS CRYSTAL OR OPTIONAL CERAMIC STONESSTANDARD FLUSH DOOR INSTALLATIONDiagram Diagram 1a Diagram 1b Diagram Door Frame INSTALLATIONFACEPLATE AND DOOR FRAME INSTALLATION Kit# 425-914Contents List10Slide unit into final position INSTALLATIONCompleted Faceplate & Door Frame Installation 8Lower the door frame gently into place4 Hearth Trim Installation INSTALLATIONOPTIONAL HEARTH TRIM INSTALLATION 2 Hearth Trim InstallationOPERATING INSTRUCTIONS OPERATING INSTRUCTIONSLIGHTING PROCEDURE SHUTDOWN PROCEDUREDO NOT REMOVE THIS INSTRUCTION PLATE MAINTENANCE INSTRUCTIONSOPERATING INSTRUCTIONS COPY OF LIGHTING INSTRUCTION PLATEGLASS GASKET MAINTENANCEGENERAL VENT MAINTENANCE DOOR GLASSBurner MAINTENANCEFAN MAINTENANCE FAN REMOVALBase Cover MAINTENANCEFan access plate Pilot assembly wiresREPLACING THE FAN MAINTENANCEBurner MAINTENANCEVALVE ASSEMBLY REPLACEMENT ON/OFF WiresU32S-5FPI Direct Vent Gas Insert MAINTENANCE11Slightly lift out valve tray 12 Disconnect the inlet gas lineDescription PARTS LISTMAIN ASSEMBLY 4 10 11 9 13 PARTS LISTBURNER ASSEMBLY Description3425-514Faceplate Outside 4425-942Hearth Trim PARTS LIST1425-512Door Bottom Assembly 2425-513Frame Inside FACEPLATE AND DOORFRAMEU32S-5FPI Direct Vent Gas Insert U32S-5FPI Direct Vent Gas Insert Exclusions WARRANTYThe Warranty Limited Lifetime ConditionsSee the inside back cover for details