Regency U32S-LP5, U32S-NG5 Installation, Gas Connection, Venting, Combustible Mantel, Clearances

Page 9
COMBUSTIBLE MANTEL

INSTALLATION

COMBUSTIBLE MANTEL

 

CLEARANCES

 

 

 

 

 

G

 

 

 

 

12

10

8

6

4

2

0

 

18

 

 

 

 

 

 

47”

16

 

 

12" Mantel

 

 

 

 

 

 

 

3-1/2"

 

(1194mm)

14

 

 

 

 

 

to ceiling

 

 

 

 

Mantel

 

 

12

 

 

 

 

 

 

 

10

 

 

 

 

 

 

 

 

17"

 

 

 

 

 

 

8

 

 

 

 

 

 

 

6

 

 

 

13"

 

 

 

 

 

 

 

 

4

 

 

 

 

 

Faceplate Top

 

2

 

 

 

 

 

 

 

 

 

 

 

 

 

0

 

 

 

 

 

 

 

 

 

20“

 

Top of

 

 

 

 

to floor

 

 

 

 

 

 

Unit

 

 

 

 

 

 

 

 

 

GAS CONNECTION

GAS CONNECTION WARNING: Only persons licensed to work with gas piping may make the necessary gas connections to this appliance.

1)If the appliance is to be installed into an existing chimney system, thoroughly clean the masonry or factory built fireplace.

2)The appliance is provided with an opening on the left hand side of the control compartment. A3/8" NPT gas supply pipe must be brought near this inlet hole.

3)Locate the center point where the vent will pass through the chimney above the appliance. Move the appliance into the exact location where it is to be installed. Ensure that the Insert is level.

Alternate Approved Caps

46dva-VC

Vertical Termination Cap

46dva-VCH High Wind Cap

46dva-GK

3" Co-linear Adaptor with flashing

Side View

Due to the extreme heat this fireplace emits, the mantel clearances are critical.

Note: A non-combustible mantel may be installed at a lower height if the framing is made of metal studs covered with a non-combustible board.

Mantel can be installed anywhere in shaded area or higher using the above scale.

Note: Ensure the paint that is used on the mantel and the facing is "heat resistant" or the paint may discolour.

C

L

Gas

Inlet

VENTING

THE APPLIANCE MUST NOT BE

CONNECTED TO A

CHIMNEY FLUE SERVING A

SEPARATE SOLID FUEL

BURNING APPLIANCE.

This appliance is designed to be attached to two 3" (76mm) co-linear aluminium flex running the full length of the chimney. The flue length must be a minimum length of 8 ' (2.44m) and a maximum of 35' (10.7m). See chart below for minimum distances from roof. Periodically check that the vent is unrestricted.

Masonry chimneys may take various contours which the flexible liner will accommodate. However, keep the flexible liner as straight as possible, avoid unnecessary bending.

The Air Intake pipe must be attached to the inlet air collar of the termination cap.

Part #

Description

948-305

3" Flex - 35 ft.

946-529

Co-linear DV Vertical

 

Termination Cap

In areas of consistently high winds, we recommend using the Simpson Dura-Vent System (46dva-GK adapter and 46dva-VCH high-wind cap).

The Air Intake pipe must be attached to the inlet air collar of the termination cap.

U32S-5 FPI Direct Vent Gas Insert

9

Image 9
Contents U32 Sunrise Gas Insert Installation ManualOwners 918-788TO THE NEW OWNER SAFETY LABEL TABLE OF CONTENTSMAINTENANCE PARTS LISTSAFETY LABEL MA Code - CO Detector REQUIREMENTSfor the State of Massachusetts only 5.08 Modifications to NFPA-54,ChapterU32S-5FPI Direct Vent Gas Insert UNIT DIMENSIONSFOR YOUR SAFETY INSTALLATIONSPECIFICATIONS GAS PRESSURE TESTINGINSTALLATION CHECKLIST INSTALLATIONMINIMUM FIREPLACE DIMENSIONS MANUFACTURED MOBILE HOME ADDITIONAL REQUIREMENTSGAS CONNECTION INSTALLATIONVENTING COMBUSTIBLE MANTELFLUE LINER INSTALLATION INSTALLATIONGAS PIPE PRESSURE TESTING GAS INSERT AERATION SYSTEMU32S-5using SIT 820 NOVA Gas Valve INSTALLATIONCONVERSION KIT # 434-969FROM NG TO LP IF IN DOUBT DO NOT DO THIS CONVERSIONInstaller Notice INSTALLATIONDo not overtighten the screw. Recommended to grip the wrench by the short sideInstallation of the DC Sparker INSTALLATIONIgnitor Wire Piezo Ignitor Ground wire from kitOPTIONAL REMOTE CONTROL INSTALLATIONto the 120V wires Thermostat Wire Table remote control the 120V wiresWIRING DIAGRAMS INSTALLATIONCAUTION Label all wires prior to disconnection when servicingINSTALLATION INSTALLATION ON BURNER INSTALLATIONGLASS CRYSTAL OR OPTIONAL CERAMIC STONES Minimum Air shutter OpeningINSTALLATION Diagram Diagram 1a Diagram 1b DiagramSTANDARD FLUSH DOOR FACEPLATE AND DOOR FRAME INSTALLATION INSTALLATIONKit# 425-914Contents List Door FrameCompleted Faceplate & Door Frame Installation INSTALLATION8Lower the door frame gently into place 10Slide unit into final positionOPTIONAL HEARTH TRIM INSTALLATION INSTALLATION2 Hearth Trim Installation 4 Hearth Trim InstallationLIGHTING PROCEDURE OPERATING INSTRUCTIONSSHUTDOWN PROCEDURE OPERATING INSTRUCTIONSOPERATING INSTRUCTIONS MAINTENANCE INSTRUCTIONSCOPY OF LIGHTING INSTRUCTION PLATE DO NOT REMOVE THIS INSTRUCTION PLATEGENERAL VENT MAINTENANCE MAINTENANCEDOOR GLASS GLASS GASKETFAN MAINTENANCE MAINTENANCEFAN REMOVAL BurnerFan access plate MAINTENANCEPilot assembly wires Base CoverREPLACING THE FAN MAINTENANCEVALVE ASSEMBLY REPLACEMENT MAINTENANCEON/OFF Wires Burner11Slightly lift out valve tray MAINTENANCE12 Disconnect the inlet gas line U32S-5FPI Direct Vent Gas InsertPARTS LIST MAIN ASSEMBLYDescription BURNER ASSEMBLY PARTS LISTDescription 4 10 11 9 131425-512Door Bottom Assembly 2425-513Frame Inside PARTS LISTFACEPLATE AND DOORFRAME 3425-514Faceplate Outside 4425-942Hearth TrimU32S-5FPI Direct Vent Gas Insert U32S-5FPI Direct Vent Gas Insert The Warranty Limited Lifetime WARRANTYConditions ExclusionsSee the inside back cover for details