Regency U32S-NG5 Installation Checklist, Manufactured Mobile Home Additional Requirements

Page 8
INSTALLATION

INSTALLATION

INSTALLATION

CHECKLIST

Before installing vent system ensure that the damper plate is open and secure to prevent the damper plate from falling down and crushing the liner.

The FPI Gas Insert is installed as listed.

1)Check all clearances to combustibles, (Refer to sections "Minimum Fireplace Dimensions and Clearances to Combustibles)

2)Make the gas connection. (Refer to section "Gas Connection")

3)Install the 3" flue liner to the sliding connector plate. (Refer to section "Flue Liner Installation.")

4)Slide the unit half way into the fireplace.

5)Pull the vent connector plate through the tapered brackets and fasten to the front plate. Refer to section "Flue Liner Installation.")

6)Slide the unit fully into the fireplace.

7)Test gas pressure (Refer to section "Gas Pipe Pressure Testing"). Check aeration system (Refer to section "Gas InsertAeration System").

8)Install standard and optional features. Refer to the following sections:

a.LP Conversion Kit

b.Glass Crystals

c.Optional Ceramic Spa Stones

d.Standard Flush Door

e.Contemporary Faceplate & Door Frame f. Wall Thermostat

g. Remote Control

9)Final check: Before leaving this unit with the customer, the installer must ensure that the appliance is firing correctly. This includes:

a)Clocking the appliance to ensure the correct firing rate.

b)Adjusting the primary air, if required, to ensure that the flame does not carbon. See "Gas Insert Aeration System" section.

c)Ensuring that the appliance is venting correctly.

MANUFACTURED

MOBILE HOME

ADDITIONAL

REQUIREMENTS

1)Ensure that structural members are not cut or weakened during installation.

2)Ensure proper grounding using the #8 ground lug provided.

3)Appliance must be anchored to the floor with the supplied anchoring methods.

MATERIALS REQUIRED

No electrical power supply is required for the gas control to operate. A 120 Volt AC power cord is hooked up to the fan. Plug the 3 wire cord into a suitable receptacle. Do not cut the ground terminal off under any circumstances. When connected with 120 volts, the appliance must be electrically grounded in accordance with local codes, current version of CSAC22.1 (in Canada) or in the absence of local codes, with the National Electrical Code ANSI/NFPA 70-1987.

NOTE: This unit is equipped with a heat sensor thermodisc which will prevent the blower from operating until the unit reaches the correct temperature.

MINIMUM FIREPLACE

DIMENSIONS

The minimum fireplace clearances & dimensions for the FPI gas insert are shown in the following diagrams:

A

B

C

D

E

CLEARANCES TO

COMBUSTIBLES

Minimum Clearances to Combustibles

From Unit

 

Sides

A

10" / 255 mm

Ceiling

B

47.5" / 1205 mm

Mantel

C

13" / 330mm

Max. Mantle Depth

G

12" / 305 mm

Min. Alcove Width

K

48" / 1220 mm

Max. Alcove Depth

L

36" / 915 mm

B

G

L

 

A

C

K

Max. Lentil

Height

Depth

Width

Width

Bar Depth

 

 

(rear)

(front)

A

B

C

D

E

 

 

 

 

 

9"

22"

14"

22-1/2"

26-1/2"

 

 

 

 

 

8

U32S-5 FPI Direct Vent Gas Insert

Image 8
Contents Installation Manual U32 Sunrise Gas InsertOwners 918-788TO THE NEW OWNER TABLE OF CONTENTS SAFETY LABELMAINTENANCE PARTS LISTSAFETY LABEL REQUIREMENTS MA Code - CO Detectorfor the State of Massachusetts only 5.08 Modifications to NFPA-54,ChapterUNIT DIMENSIONS U32S-5FPI Direct Vent Gas InsertINSTALLATION FOR YOUR SAFETYSPECIFICATIONS GAS PRESSURE TESTINGINSTALLATION INSTALLATION CHECKLISTMINIMUM FIREPLACE DIMENSIONS MANUFACTURED MOBILE HOME ADDITIONAL REQUIREMENTSINSTALLATION GAS CONNECTIONVENTING COMBUSTIBLE MANTELINSTALLATION FLUE LINER INSTALLATIONGAS PIPE PRESSURE TESTING GAS INSERT AERATION SYSTEMINSTALLATION U32S-5using SIT 820 NOVA Gas ValveCONVERSION KIT # 434-969FROM NG TO LP IF IN DOUBT DO NOT DO THIS CONVERSIONINSTALLATION Installer NoticeDo not overtighten the screw. Recommended to grip the wrench by the short sideINSTALLATION Installation of the DC SparkerIgnitor Wire Piezo Ignitor Ground wire from kitINSTALLATION OPTIONAL REMOTE CONTROLto the 120V wires Thermostat Wire Table remote control the 120V wiresINSTALLATION WIRING DIAGRAMSCAUTION Label all wires prior to disconnection when servicingINSTALLATION INSTALLATION INSTALLATION ON BURNERGLASS CRYSTAL OR OPTIONAL CERAMIC STONES Minimum Air shutter OpeningSTANDARD FLUSH DOOR INSTALLATIONDiagram Diagram 1a Diagram 1b Diagram INSTALLATION FACEPLATE AND DOOR FRAME INSTALLATIONKit# 425-914Contents List Door FrameINSTALLATION Completed Faceplate & Door Frame Installation8Lower the door frame gently into place 10Slide unit into final positionINSTALLATION OPTIONAL HEARTH TRIM INSTALLATION2 Hearth Trim Installation 4 Hearth Trim InstallationOPERATING INSTRUCTIONS LIGHTING PROCEDURESHUTDOWN PROCEDURE OPERATING INSTRUCTIONSMAINTENANCE INSTRUCTIONS OPERATING INSTRUCTIONSCOPY OF LIGHTING INSTRUCTION PLATE DO NOT REMOVE THIS INSTRUCTION PLATEMAINTENANCE GENERAL VENT MAINTENANCEDOOR GLASS GLASS GASKETMAINTENANCE FAN MAINTENANCEFAN REMOVAL BurnerMAINTENANCE Fan access platePilot assembly wires Base CoverMAINTENANCE REPLACING THE FANMAINTENANCE VALVE ASSEMBLY REPLACEMENTON/OFF Wires BurnerMAINTENANCE 11Slightly lift out valve tray12 Disconnect the inlet gas line U32S-5FPI Direct Vent Gas InsertDescription PARTS LISTMAIN ASSEMBLY PARTS LIST BURNER ASSEMBLYDescription 4 10 11 9 13PARTS LIST 1425-512Door Bottom Assembly 2425-513Frame InsideFACEPLATE AND DOORFRAME 3425-514Faceplate Outside 4425-942Hearth TrimU32S-5FPI Direct Vent Gas Insert U32S-5FPI Direct Vent Gas Insert WARRANTY The Warranty Limited LifetimeConditions ExclusionsSee the inside back cover for details