Regency U32S-NG5 Installation, Standard Flush Door, Diagram Diagram 1a Diagram 1b Diagram

Page 18
STANDARD

INSTALLATION

STANDARD

FLUSH DOOR

The standard flush door comes with a black frame. To install the frame, simply hook the top door flange onto the top of the unit and swing the door towards the unit, diagram 1. Be careful that the glass gasket does not roll up; there must be a gap between the gasket and the door lip to ensure that the door sits securely on the unit. Diagram 2.

Use the hook to pull the spring out until you can put the hook into the slot on the bottom door bracket. Repeat for 2nd spring. See diagram 3.

To remove the flush door, reverse the above steps.

IMPORTANT NOTE: The chain must rest on TOP of the gas inlet pipe never under it.

Diagram 3

Diagram 1a

Diagram 1b

Diagram 2

18

U32S-5 FPI Direct Vent Gas Insert

Image 18
Contents Owners Installation ManualU32 Sunrise Gas Insert 918-788TO THE NEW OWNER MAINTENANCE TABLE OF CONTENTSSAFETY LABEL PARTS LISTSAFETY LABEL for the State of Massachusetts only REQUIREMENTSMA Code - CO Detector 5.08 Modifications to NFPA-54,ChapterUNIT DIMENSIONS U32S-5FPI Direct Vent Gas InsertSPECIFICATIONS INSTALLATIONFOR YOUR SAFETY GAS PRESSURE TESTINGMINIMUM FIREPLACE DIMENSIONS INSTALLATIONINSTALLATION CHECKLIST MANUFACTURED MOBILE HOME ADDITIONAL REQUIREMENTSVENTING INSTALLATIONGAS CONNECTION COMBUSTIBLE MANTELGAS PIPE PRESSURE TESTING INSTALLATIONFLUE LINER INSTALLATION GAS INSERT AERATION SYSTEMCONVERSION KIT # 434-969FROM NG TO LP INSTALLATIONU32S-5using SIT 820 NOVA Gas Valve IF IN DOUBT DO NOT DO THIS CONVERSIONDo not overtighten the screw. Recommended to grip INSTALLATIONInstaller Notice the wrench by the short sideIgnitor Wire Piezo Ignitor INSTALLATIONInstallation of the DC Sparker Ground wire from kitto the 120V wires Thermostat Wire Table INSTALLATIONOPTIONAL REMOTE CONTROL remote control the 120V wiresCAUTION Label all wires prior INSTALLATIONWIRING DIAGRAMS to disconnection when servicingINSTALLATION GLASS CRYSTAL OR OPTIONAL CERAMIC STONES INSTALLATIONINSTALLATION ON BURNER Minimum Air shutter OpeningINSTALLATION Diagram Diagram 1a Diagram 1b DiagramSTANDARD FLUSH DOOR Kit# 425-914Contents List INSTALLATIONFACEPLATE AND DOOR FRAME INSTALLATION Door Frame8Lower the door frame gently into place INSTALLATIONCompleted Faceplate & Door Frame Installation 10Slide unit into final position2 Hearth Trim Installation INSTALLATIONOPTIONAL HEARTH TRIM INSTALLATION 4 Hearth Trim InstallationSHUTDOWN PROCEDURE OPERATING INSTRUCTIONSLIGHTING PROCEDURE OPERATING INSTRUCTIONSCOPY OF LIGHTING INSTRUCTION PLATE MAINTENANCE INSTRUCTIONSOPERATING INSTRUCTIONS DO NOT REMOVE THIS INSTRUCTION PLATEDOOR GLASS MAINTENANCEGENERAL VENT MAINTENANCE GLASS GASKETFAN REMOVAL MAINTENANCEFAN MAINTENANCE BurnerPilot assembly wires MAINTENANCEFan access plate Base CoverMAINTENANCE REPLACING THE FANON/OFF Wires MAINTENANCEVALVE ASSEMBLY REPLACEMENT Burner12 Disconnect the inlet gas line MAINTENANCE11Slightly lift out valve tray U32S-5FPI Direct Vent Gas InsertPARTS LIST MAIN ASSEMBLYDescription Description PARTS LISTBURNER ASSEMBLY 4 10 11 9 13FACEPLATE AND DOORFRAME PARTS LIST1425-512Door Bottom Assembly 2425-513Frame Inside 3425-514Faceplate Outside 4425-942Hearth TrimU32S-5FPI Direct Vent Gas Insert U32S-5FPI Direct Vent Gas Insert Conditions WARRANTYThe Warranty Limited Lifetime ExclusionsSee the inside back cover for details