Regency U32S-NG5, U32S-LP5 Maintenance, Base Cover, Fan access plate, 12Remove the side panel

Page 26
Fan access plate

MAINTENANCE

9)Remove the base cover by lifting up from the back and maneover out.

14)Remove the fan access plate by undoing the 10 screws shown.

Base Cover

10)Remove the back panel by manoeuvring it up and out of the firebbox. as shown below.

Fan access plate

15) Remove the 3 screws securing the burner bracket as shown below.

11)Remove 1 screw holding the clip securing the right side panel

12)Remove the side panel.

13)Repeat above 2 steps to remove the left side panel.

16)Move the pilot assembly out of the way - be careful of the wires leading from the pilot assembly.

Pilot assembly wires

26

U32S-5 FPI Direct Vent Gas Insert

Image 26
Contents Owners Installation ManualU32 Sunrise Gas Insert 918-788TO THE NEW OWNER MAINTENANCE TABLE OF CONTENTSSAFETY LABEL PARTS LISTSAFETY LABEL for the State of Massachusetts only REQUIREMENTSMA Code - CO Detector 5.08 Modifications to NFPA-54,ChapterUNIT DIMENSIONS U32S-5FPI Direct Vent Gas InsertSPECIFICATIONS INSTALLATIONFOR YOUR SAFETY GAS PRESSURE TESTINGMINIMUM FIREPLACE DIMENSIONS INSTALLATIONINSTALLATION CHECKLIST MANUFACTURED MOBILE HOME ADDITIONAL REQUIREMENTSVENTING INSTALLATIONGAS CONNECTION COMBUSTIBLE MANTELGAS PIPE PRESSURE TESTING INSTALLATIONFLUE LINER INSTALLATION GAS INSERT AERATION SYSTEMCONVERSION KIT # 434-969FROM NG TO LP INSTALLATIONU32S-5using SIT 820 NOVA Gas Valve IF IN DOUBT DO NOT DO THIS CONVERSIONDo not overtighten the screw. Recommended to grip INSTALLATIONInstaller Notice the wrench by the short sideIgnitor Wire Piezo Ignitor INSTALLATIONInstallation of the DC Sparker Ground wire from kitto the 120V wires Thermostat Wire Table INSTALLATIONOPTIONAL REMOTE CONTROL remote control the 120V wiresCAUTION Label all wires prior INSTALLATIONWIRING DIAGRAMS to disconnection when servicingINSTALLATION GLASS CRYSTAL OR OPTIONAL CERAMIC STONES INSTALLATIONINSTALLATION ON BURNER Minimum Air shutter OpeningSTANDARD FLUSH DOOR INSTALLATIONDiagram Diagram 1a Diagram 1b Diagram Kit# 425-914Contents List INSTALLATIONFACEPLATE AND DOOR FRAME INSTALLATION Door Frame8Lower the door frame gently into place INSTALLATIONCompleted Faceplate & Door Frame Installation 10Slide unit into final position2 Hearth Trim Installation INSTALLATIONOPTIONAL HEARTH TRIM INSTALLATION 4 Hearth Trim InstallationSHUTDOWN PROCEDURE OPERATING INSTRUCTIONSLIGHTING PROCEDURE OPERATING INSTRUCTIONSCOPY OF LIGHTING INSTRUCTION PLATE MAINTENANCE INSTRUCTIONSOPERATING INSTRUCTIONS DO NOT REMOVE THIS INSTRUCTION PLATEDOOR GLASS MAINTENANCEGENERAL VENT MAINTENANCE GLASS GASKETFAN REMOVAL MAINTENANCEFAN MAINTENANCE BurnerPilot assembly wires MAINTENANCEFan access plate Base CoverMAINTENANCE REPLACING THE FANON/OFF Wires MAINTENANCEVALVE ASSEMBLY REPLACEMENT Burner12 Disconnect the inlet gas line MAINTENANCE11Slightly lift out valve tray U32S-5FPI Direct Vent Gas InsertDescription PARTS LISTMAIN ASSEMBLY Description PARTS LISTBURNER ASSEMBLY 4 10 11 9 13FACEPLATE AND DOORFRAME PARTS LIST1425-512Door Bottom Assembly 2425-513Frame Inside 3425-514Faceplate Outside 4425-942Hearth TrimU32S-5FPI Direct Vent Gas Insert U32S-5FPI Direct Vent Gas Insert Conditions WARRANTYThe Warranty Limited Lifetime ExclusionsSee the inside back cover for details