Regency P40-NG1, P40-LP1 installation manual J9 Jumper Location

Page 30

INSTALLATION

INSTALLATION

14)Re-install pilot shield.

15)Set aeration on both front and rear burner for LP gas;

Rear 1/4"

Front 1/8"

16)Reverse steps 8 to 4.

17)Remove the Power Module by lifting it up off of the velcro and move it over to the side.

Power Module

18)Remove the Control Module, located behind the power module, by lifting it up off of the velcro.

Control Module

19)Place the J9 jumper using needle nose pliers, located under the heat shield.

J9 Jumper

20)Reverse steps 18 to 17. Be careful not to pinch wires.

21)Remove the 2 wires connected to the modulating coil.

Modulating Coil

22)Using a Torx T20, or slotted screwdriver, remove and discard the three pressure regulator mounting screws and rubber diaphram.

23)Insure that the new rubber gasket is properly positioned and install the new modulating pressure regulator assembly to the valve using the screws supplied with the kit. Tighten screws securely.

24)Reattach 2 wires to modulating coil.

25)Install the enclosed identification label to the valve body where it can be easily seen. The label is found in the coil pack- age.

26)Attach the LP conversion decal near or on top of the serial # decal located on a metal plate under the unit.

27)Replace the red "Propane" label with the yellow "Natural Gas" label on the valve assembly.

28)Ensure proper installation of venting is complete, gas line is connected and then turn on power to unit.

29)Check for gas leaks.

30)Check inlet (5" wc) and outlet (3.5" wc) pressures.

31)Check operation of flame control using the manual control box located on the right side under the firebox.

32)Re-install logs and flush door. Check for proper flame appearance and glow on logs.

WARNING!

This conversion kit should be installed by a qualified service agency in ac- cordance with the authority having jurisdiction. If the information in these instructions are not followed exactly, a fire, explosion or production of carbon monoxide may result causing property damage, personal injury or loss of life. The qualified service agency is respon- sible for the proper installation of this kit. The installation is not proper and complete until the operation of the con- verted appliance is checked as speci- fied in the manufacturer's instructions supplied with the kit.

Installer Notice:

These instructions must be left

with the appliance.

J9 Jumper Location

30

Regency® P40-1 Direct Vent Gas Fireplace

Image 30
Contents P40 Gas Fireplace Manufactured Mobile Home Requirements Information for MOBILE/MANUFACTURED Homes After First SaleTable of Contents Installation Copy of Safety LabelMA Code CO Detector For the State of Massachusetts onlyDimensions Important Message General Safety InformationInstallation Checklist Before YOU StartHeat Release KIT Locating Your GAS FireplaceHeatwave Duct KIT Hearth RequirementsClearances P40 Fireplace Mantel ClearancesMantel LEG Clearances P40Framing & Finishing Full Screen Door Facing RequirementsHeight = 42-1/2 plus height of hearth Unit Assembly Prior to Installation Venting IntroductionVent Restrictor Position Exterior Vent Termination Requirements Venting Arrangements Horizontal Termination FlexRigid Pipe Venting Systems Basic Horizontal & Vertical TerminationsHorizontal Termination 8 Rigid Pipe Cross Reference Chart 58DVA-16ABOffset Pipe Selection 58DVA-RDAllowable Horizontal Terminations Horizontal Feet Vertical Height FeetOption + H1 Option + V1 H + H1Option Option + H1 V +Allowable Vertical Terminations Vent must be supported at offsetsUnit Installation with Horizontal Termination Arrow on the vent cap should be pointing upDiagram Unit Installation With Vertical TerminationThis allows for small adjustments Minimum VentUnit Installation Astrocap XL DimensionsHigh Elevation GAS Line InstallationPilot Adjustment P40-NG1 System DataUnplug the power source GAS Pipe Pressure TestingBACK-UP Battery Installation Power ModuleConversion KIT #502-969 from NG to LP LP Conversion Kit Contains Qty DescriptionControl Module Modulating CoilJ9 Jumper Conversion KIT #502-966 from LP to NG NG Conversion Kit Contains Qty DescriptionJ9 Jumper Location Ensure that the logs are not in the unit Brick Panel InstallationBack Brick Panel Brick Panels Completely Installed Top Brick PanelLOG SET Installation 03-3203-40 03-34 03-33 03-341st Log Stand Post 03-37 03-46 03-3303-33 03-46 03-36 03-36 03-3703-36 03-32 03-37 03-46 03-3603-38 03-34 03-40 03-46 03-47 03-382Standard Flush Door Aeration AdjustmentInstalling the Manual Control Box Flush LouversWiring Diagram Finishing TrimDo not cut the ground terminal off under any circumstances Full Screen Door Frame Installation Full Screen DoorsInstallation Upper Air RegisterMatching Remote Handset & Control BOX ID Code Lighting ProcedureShutdown Procedure Operating InstructionsOperation During Power Outage First FireDo not Burn the Appliance Without the Glass Front in Place Summary Controls Normal Operating Sounds GAS AppliancesFor Your Safety Read Before Lighting STOP! Read the safety information above on this labelCopy of Lighting Plate Instructions LOG Replacement Maintenance InstructionsGeneral Vent Maintenance Thermopile ThermocoupleDoor Glass FAN Replacement Glass ReplacementLog Stand Valve ReplacementWire Solenoid Valve Compression FittingsWa & Wb Wires DC Sparker ReplacementPower Module Replacement Ring TabsControl Module Replacement Backup Battery ReplacementHeat Shield Parts List Main AssemblyParts List Valve Tray AssemblyFlush Door & Louvers Regency P40-1 Direct Vent Gas Fireplace Regency P40-1 Direct Vent Gas Fireplace Regency P40-1 Direct Vent Gas Fireplace Warranty Installer Please complete the following information

P40-LP1, P40-NG1 specifications

The Regency P40-LP1 and P40-NG1 are notable advancements in the realm of modern technology, particularly designed for energy efficiency and enhanced performance in various applications. These two models cater to the diverse needs of industries striving for both sustainability and productivity.

The P40-LP1 is engineered with a focus on low-pressure applications, utilizing cutting-edge technology to ensure optimal performance in energy consumption. This model features an advanced energy management system that intelligently adjusts power usage based on demand, which not only reduces operational costs but also minimizes the environmental impact. Its compact design and lightweight materials allow for easy installation in various settings, making it a versatile option for multiple industries.

On the other hand, the P40-NG1 is tailored for natural gas applications, making it an ideal choice for environments where natural gas is the primary energy source. This model is equipped with high-efficiency burners that maximize combustion efficiency, producing fewer emissions compared to traditional systems. The P40-NG1 also incorporates an integrated control system, providing users with real-time data monitoring to optimize performance and facilitate preventative maintenance.

Both models are constructed with durable materials designed to withstand harsh operating conditions, ensuring longevity and reliability. Advanced insulation technology further enhances their efficiency by reducing heat loss, allowing these systems to maintain consistent performance over extended periods.

A standout feature of the P40 series is its commitment to user-friendliness. The intuitive interface allows operators to easily navigate settings and access critical system information with minimal training. Additionally, these units are compatible with smart technologies, enabling seamless integration into existing infrastructure for enhanced operational oversight.

In summary, the Regency P40-LP1 and P40-NG1 embody the future of energy solutions, combining efficiency, adaptability, and user-focused design. Whether it’s for low-pressure or natural gas applications, these products deliver reliable performance while adhering to environmental standards. With ongoing advancements in their technology, the P40 series stands as a testament to Regency’s dedication to innovation and sustainability in the energy sector.