Regency P33R-LP2 Wiring Diagram, Do not cut the ground terminal off under any circumstances

Page 26

INSTALLATION

WIRING DIAGRAM

This heater does not require a 120V A.C. supply for operation. In case of a power failure, the burner switch and the optional remote control/thermostat will continue to operate. However, a 120V A.C. power supply is needed for the fan/blower operation.

(Do not cut the ground terminal off under any circumstances.)

NOTE: Even if the fan is not purchased with the unit, it is still a good idea to bring power to the receptacle box (provided with the unit) in case the fan is installed at a later date.

Caution: Ensure that the wires do not touch any hot surfaces and are away from sharp edges.

CAUTION: Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation.

26

Regency P33R-2 Zero Clearance Rear Vent Direct Vent Gas Fireplace

Image 26
Contents P33R Zero Clearance Rear Direct Vent Information for MOBILE/MANUFACTURED Homes After First Sale To the New OwnerTable of Contents Safety Label Save These Instructions InstallationGeneral Safety Information Before YOU StartLocating Your GAS Stove Unit DimensionsChecklist Duct System OptionFire hazard is an extreme risk if Clearances Combustible MantelsMantel LEG Clearances These clearances are not adFraming and Finishing Top Facing Support Side Nailing Strips Unit Assembly Prior to InstallationTop Standoff Assembly Screw PositionVent Air supply outletVenting Introduction Regency Direct Vent System Flex Horizontal Terminations onlyInstallation Procedures For Regency Direct Vent System FlexSimpson Dura-Vent Direct Vent GS Simpson DURA-VENT VentingSimpson DURA-VENT Venting Components List Parts not supplied by Dura-VentVenting Arrangements Horizontal Terminations Dura-Vent System or Regency DV FlexVenting Arrangements Vertical Terminations Propane & Natural GasAlternate Approved Caps Vertical Termination With CO-LINEAR Flex SystemRequired Parts Installation Horizontal Installations Snorkel TerminationsGAS Line Installation Vertical TerminationHigh Elevation Pilot AdjustmentGAS Pipe Pressure Testing T. Valve DescriptionConversion Kit Contains Rear Log SupportLOG SET Installation Optional Brick PanelsStandard Flush Door Optional Flush TrimOptional BAY Door Flush LouversDouble Screen Door Thermostat Wire Table Optional Wall Thermostat Remote ControlOptional Wall Switch BAY LouversWiring Diagram Do not cut the ground terminal off under any circumstancesInstalling the Optional FAN Secure left side with 2 screwsOperating Instructions Copy of the Lighting Plate InstructionsAeration Adjustment Lighting ProcedureShutdown Procedure Operating InstructionsMaintenance Thermocouple Flush Glass Replacement Bay Glass ReplacementThermopile Glass GasketShut off the gas supply Installing ValveRemoving Valve Parts List DescriptionBurner & Log Assembly Flush Front & Louvers Bay Front & Louvers Page Page Warranty Warranty LifetimeInstaller Please complete the following information