Regency P33R-LP2, P33R-NG2 Removing Valve, Installing Valve, Shut off the gas supply

Page 32

MAINTENANCE

REMOVING VALVE

1)Shut off the gas supply.

2)Remove the louvers (and bay door if it is on).

3)Open the flush door and remove the door.

4)Remove the logs.

5)Remove the burner/grate assembly by re- moving the two Phillips head screws and then lift the burner assembly out.

gram 2) and then lift the entire assembly out (diagram 3).

10)Undo the pilot tube from the valve with a 7/16" wrench.

INSTALLING VALVE

1)

Attach the valve to the valve bracket with

 

the 4 (m5x8 metric) screws provided.

2)

Reconnect the "gas out" flare fitting with

 

an 11/16" wrench.

3)

Reconnect the "gas out" flare nut with a 13/

 

16" wrench.

4)

Install piezo ignitor push button assembly

 

and reconnect wire.

5)

Reconnect the quick drop out thermocou-

 

ple nut with a 9mm wrench.

Diagram 3: Lift out Valve Tray Assembly

6) Reconnect the pilot tube nut with a 7/16"

wrench.

7) Scrape off the old gasket from the floor of the firebox and from the valve tray assem- bly.

8)Install a new gasket and reinstall the valve tray assembly.

Diagram 1: Remove the left and right screws and then lift out the burner/grate assembly.

6)Remove the rear log stand by removing the 2 screws.

7)Disconnect the inlet gas line. See diagram 2.

8)Disconnect the 2 TP wires and the 2 TH wires from the valve.

9)Remove the 10 Phillips head screws secur- ing the valve tray assembly in place (dia-

11)Undo the quick drop out thermocouple nut on the valve with a 9mm (metric) wrench.

12)Remove the Piezo igniter wire and push button assembly.

13)Undo the "gas out" flare nut with a 13/16" wrench.

14)Undo the "gas out" flare fitting with an 11/ 16" wrench.

15)Remove the 4 Phillips head screws from the sides of the valve bracket and remove valve.

Hint: If you are using black pipe, ensure that there is a union by the valve, otherwise removal will be almost impossible.

Note: Failure to install a new gasket may severely affect the appliance performance.

9) Reinstall the 10 hold down screws.

10) Hook up the 2 TP and 2 TH wires to the

appropriate connections on the valve.

11) Reinstall the front log stand.

12) Install Burner/grate assembly.

13) Hook up the gas line and check for gas

leaks with a soap and water solution or a

gas leak detector. (Do not use open flame

for leak testing.)

14) Fire up the unit temporarily.

screws

Rear Log Stand

15) Check the manifold pressure.

16) Reinstall the logs and brick panels as

needed.

17) Close the door and replace the louvers.

18) Fire up the unit again and check for proper

flame appearance and glow on logs.

screwsValve Tray Assembly Diagram 2: Rear Log Stand & Valve Tray Assembly

32

Regency P33R-2 Zero Clearance Rear Vent Direct Vent Gas Fireplace

Image 32
Contents P33R Zero Clearance Rear Direct Vent Information for MOBILE/MANUFACTURED Homes After First Sale To the New OwnerTable of Contents Safety Label Installation General Safety InformationSave These Instructions Before YOU StartUnit Dimensions ChecklistLocating Your GAS Stove Duct System OptionClearances Combustible Mantels Mantel LEG ClearancesFire hazard is an extreme risk if These clearances are not adFraming and Finishing Unit Assembly Prior to Installation Top Standoff AssemblyTop Facing Support Side Nailing Strips Screw PositionVent Air supply outletVenting Introduction Regency Direct Vent System Flex Horizontal Terminations onlyInstallation Procedures For Regency Direct Vent System FlexSimpson DURA-VENT Venting Simpson DURA-VENT Venting Components ListSimpson Dura-Vent Direct Vent GS Parts not supplied by Dura-VentVenting Arrangements Horizontal Terminations Dura-Vent System or Regency DV FlexVenting Arrangements Vertical Terminations Propane & Natural GasAlternate Approved Caps Vertical Termination With CO-LINEAR Flex SystemRequired Parts Installation Horizontal Installations Snorkel TerminationsGAS Line Installation Vertical TerminationPilot Adjustment GAS Pipe Pressure TestingHigh Elevation T. Valve DescriptionConversion Kit Contains Rear Log SupportLOG SET Installation Optional Brick PanelsStandard Flush Door Optional Flush TrimOptional BAY Door Flush LouversDouble Screen Door Optional Wall Thermostat Remote Control Optional Wall SwitchThermostat Wire Table BAY LouversWiring Diagram Do not cut the ground terminal off under any circumstancesInstalling the Optional FAN Secure left side with 2 screwsOperating Instructions Copy of the Lighting Plate InstructionsLighting Procedure Shutdown ProcedureAeration Adjustment Operating InstructionsMaintenance Flush Glass Replacement Bay Glass Replacement ThermopileThermocouple Glass GasketShut off the gas supply Installing ValveRemoving Valve Parts List DescriptionBurner & Log Assembly Flush Front & Louvers Bay Front & Louvers Page Page Warranty Warranty LifetimeInstaller Please complete the following information