Regency P33R-LP2, P33R-NG2 installation manual Safety Label

Page 4

SAFETY LABEL

This is a copy of the label that accompanies each P33R-2 Zero Clearance Direct Vent Gas Fireplace. We have printed a copy of the con- tents here for your review. The safety label is located on the front inside base of the unit, visible when the bottom louver is open.

NOTE: Regency units are constantly being improved. Check the label on the unit and if there is a difference, the label on the unit is the correct one.

For the State of Massachusetts, installation and repair must be done by a plumber or gasfitter licensed in the Commonwealth of Massachusetts.

For the State of Massachusetts, flexible connectors shall not exceed 36 inches in length.

For the State of Massachusetts, the appli- ances individual manual shut-off must be a t-handle type valve.

4

Regency P33R-2 Zero Clearance Rear Vent Direct Vent Gas Fireplace

Image 4
Contents P33R Zero Clearance Rear Direct Vent Information for MOBILE/MANUFACTURED Homes After First Sale To the New OwnerTable of Contents Safety Label Installation General Safety InformationSave These Instructions Before YOU StartUnit Dimensions ChecklistLocating Your GAS Stove Duct System OptionClearances Combustible Mantels Mantel LEG ClearancesFire hazard is an extreme risk if These clearances are not adFraming and Finishing Unit Assembly Prior to Installation Top Standoff AssemblyTop Facing Support Side Nailing Strips Screw PositionVent Air supply outletVenting Introduction Regency Direct Vent System Flex Horizontal Terminations onlyInstallation Procedures For Regency Direct Vent System FlexSimpson DURA-VENT Venting Simpson DURA-VENT Venting Components ListSimpson Dura-Vent Direct Vent GS Parts not supplied by Dura-VentVenting Arrangements Horizontal Terminations Dura-Vent System or Regency DV FlexVenting Arrangements Vertical Terminations Propane & Natural GasRequired Parts Vertical Termination With CO-LINEAR Flex SystemAlternate Approved Caps Installation Horizontal Installations Snorkel TerminationsGAS Line Installation Vertical TerminationPilot Adjustment GAS Pipe Pressure TestingHigh Elevation T. Valve DescriptionConversion Kit Contains Rear Log SupportLOG SET Installation Optional Brick PanelsStandard Flush Door Optional Flush TrimDouble Screen Door Flush LouversOptional BAY Door Optional Wall Thermostat Remote Control Optional Wall SwitchThermostat Wire Table BAY LouversWiring Diagram Do not cut the ground terminal off under any circumstancesInstalling the Optional FAN Secure left side with 2 screwsOperating Instructions Copy of the Lighting Plate InstructionsLighting Procedure Shutdown ProcedureAeration Adjustment Operating InstructionsMaintenance Flush Glass Replacement Bay Glass Replacement ThermopileThermocouple Glass GasketRemoving Valve Installing ValveShut off the gas supply Parts List DescriptionBurner & Log Assembly Flush Front & Louvers Bay Front & Louvers Page Page Warranty Warranty LifetimeInstaller Please complete the following information