Regency P33R-NG2, P33R-LP2 Venting Arrangements Vertical Terminations, Propane & Natural Gas

Page 15

INSTALLATION

VENTING ARRANGEMENTS - VERTICAL TERMINATIONS

SIMPSON DURA-VENT DIRECT VENT GS SYSTEM

(Propane & Natural Gas)

The shaded area in the diagram shows all allowable combinations of straight vertical and offset to vertical terminations , using three 90o elbows (two 45o elbows equal one 90o elbow), with Simpson Dura-Vent Direct Vent GS vent systems for Propane and Natural Gas.

Vent must be supported at offsets

Firestops are required at each floor level and whenever passing through a wall.

Maintain a 1-1/4" clearance to combustibles

Note: Must use optional flue adapter when using Simpson Dura-Vent pipe (Part # 510-994).

Regency P33R-2 Zero Clearance Rear Vent Direct Vent Gas Fireplace

15

Image 15
Contents P33R Zero Clearance Rear Direct Vent To the New Owner Information for MOBILE/MANUFACTURED Homes After First SaleTable of Contents Safety Label Before YOU Start InstallationGeneral Safety Information Save These InstructionsDuct System Option Unit DimensionsChecklist Locating Your GAS StoveThese clearances are not ad Clearances Combustible MantelsMantel LEG Clearances Fire hazard is an extreme risk ifFraming and Finishing Screw Position Unit Assembly Prior to InstallationTop Standoff Assembly Top Facing Support Side Nailing StripsAir supply outlet VentRegency Direct Vent System Flex Horizontal Terminations only Venting IntroductionFor Regency Direct Vent System Flex Installation ProceduresParts not supplied by Dura-Vent Simpson DURA-VENT VentingSimpson DURA-VENT Venting Components List Simpson Dura-Vent Direct Vent GSDura-Vent System or Regency DV Flex Venting Arrangements Horizontal TerminationsPropane & Natural Gas Venting Arrangements Vertical TerminationsVertical Termination With CO-LINEAR Flex System Required PartsAlternate Approved Caps Installation Snorkel Terminations Horizontal InstallationsVertical Termination GAS Line InstallationT. Valve Description Pilot AdjustmentGAS Pipe Pressure Testing High ElevationRear Log Support Conversion Kit ContainsOptional Brick Panels LOG SET InstallationOptional Flush Trim Standard Flush DoorFlush Louvers Double Screen DoorOptional BAY Door BAY Louvers Optional Wall Thermostat Remote ControlOptional Wall Switch Thermostat Wire TableDo not cut the ground terminal off under any circumstances Wiring DiagramSecure left side with 2 screws Installing the Optional FANCopy of the Lighting Plate Instructions Operating InstructionsOperating Instructions Lighting ProcedureShutdown Procedure Aeration AdjustmentMaintenance Glass Gasket Flush Glass Replacement Bay Glass ReplacementThermopile ThermocoupleInstalling Valve Removing ValveShut off the gas supply Description Parts ListBurner & Log Assembly Flush Front & Louvers Bay Front & Louvers Page Page Warranty Lifetime WarrantyInstaller Please complete the following information