Regency P33R-NG2 Unit Assembly Prior to Installation, Top Standoff Assembly, Screw Position

Page 9

INSTALLATION

UNIT ASSEMBLY

PRIOR TO INSTALLATION

The Top Facing Support, the Side Nailing Strips and the 2 Top Standoffs must be correctly positioned and attached to the top before unit is slipped into position.

Top Standoff Assembly

The top standoffs are shipped in a flat position and must be pulled up and bent into the correct shape. Setup each of the 2 Top Standoff by bending up at the bend lines until the screw hole in the standoff and the pre-punched screw holes on the top line up. Use three more screws per standoff to attach securely to the top.

Top Facing Support &

Side Nailing Strips

Determine the total thickness of facing material (e.g. drywall plus ceramic tiles) to allow the finished surface to be flush with the front of the unit. Total facing thickness can vary from 1/2" (13mm) to 1-1/4" (32mm) thick.

The Top Facing Support & Side Nailing Strips can be mounted in 3 different positions depend- ing on the thickness of the facing material.

Screw

Facing Material

Position

Depth

 

A

1/2"

/ 13mm

B

7/8"

/ 22mm

C*

1-1/4"

/ 32mm

*For "C" screw position the top facing support is reversed.

1)Mount Top Facing Support using the 3 supplied screws into the three pre-punched screw holes on the top front of the unit. Use hole positions A, B, or C depending on your facing depth.

"C" Screw Position:

For a facing material depth of 1-1/4"(32mm), the top facing support must be reversed.

2)Use the same screw hole position for the Side Nailing Strips as was used for the Top Facing Support. Attach each side nailing strip using 3 screws.

Regency P33R-2 Zero Clearance Rear Vent Direct Vent Gas Fireplace

9

Image 9
Contents P33R Zero Clearance Rear Direct Vent To the New Owner Information for MOBILE/MANUFACTURED Homes After First SaleTable of Contents Safety Label General Safety Information InstallationSave These Instructions Before YOU StartChecklist Unit DimensionsLocating Your GAS Stove Duct System OptionMantel LEG Clearances Clearances Combustible MantelsFire hazard is an extreme risk if These clearances are not adFraming and Finishing Top Standoff Assembly Unit Assembly Prior to InstallationTop Facing Support Side Nailing Strips Screw PositionAir supply outlet VentRegency Direct Vent System Flex Horizontal Terminations only Venting IntroductionFor Regency Direct Vent System Flex Installation ProceduresSimpson DURA-VENT Venting Components List Simpson DURA-VENT VentingSimpson Dura-Vent Direct Vent GS Parts not supplied by Dura-VentDura-Vent System or Regency DV Flex Venting Arrangements Horizontal TerminationsPropane & Natural Gas Venting Arrangements Vertical TerminationsVertical Termination With CO-LINEAR Flex System Required PartsAlternate Approved Caps Installation Snorkel Terminations Horizontal InstallationsVertical Termination GAS Line InstallationGAS Pipe Pressure Testing Pilot AdjustmentHigh Elevation T. Valve DescriptionRear Log Support Conversion Kit ContainsOptional Brick Panels LOG SET InstallationOptional Flush Trim Standard Flush DoorFlush Louvers Double Screen DoorOptional BAY Door Optional Wall Switch Optional Wall Thermostat Remote ControlThermostat Wire Table BAY LouversDo not cut the ground terminal off under any circumstances Wiring DiagramSecure left side with 2 screws Installing the Optional FANCopy of the Lighting Plate Instructions Operating InstructionsShutdown Procedure Lighting ProcedureAeration Adjustment Operating InstructionsMaintenance Thermopile Flush Glass Replacement Bay Glass ReplacementThermocouple Glass GasketInstalling Valve Removing ValveShut off the gas supply Description Parts ListBurner & Log Assembly Flush Front & Louvers Bay Front & Louvers Page Page Warranty Lifetime WarrantyInstaller Please complete the following information