INSTALLATION
FLUSH LOUVERS
1)Install the top louver by sliding the two bracket clips into the brackets located un- derneath the top of the firebox.
2)Install the bottom louver by folding the lou- ver down and then sliding the Bottom Lou- ver bracket down onto the 2 pins on the base of the unit (dia. 1). Secure with 1 screw as per dia. 2.
Diagram 1 | Diagram 2 |
DOUBLE SCREEN
DOOR
1)Pull out the top louver.
2)Center the screen door and hook over the flush door.
Note: Top and bottom louvers are different.
3)Open the bottom louver. Pull the Burner ON/ OFF control box from inside the bottom of the fireplace and position the slots in the bracket over the 2 screws on the left side of the bottom louver. Push down to lock into place. Tighten the screws.
3)Open the screen door(s) and secure the screen door to the flush door front with 2 clips on the bottom left and right side.
Clip locations
Clip installed on right side.
OPTIONAL BAY DOOR
The Bay louvers MUST be used
with the Bay glass option.
Note: If any maintenance etc. must be done in the firebox, first remove the Bay louvers and door.
Optional Bay Trim
Attach 4 supplied magnets each to the back of the top and bottom trim pieces, and attach trim to the top and bottom of Bay door.
Screws on | Burner ON/OFF |
louver bracket | control box |
Burner ON/OFF control box attached to
bottom flush louver.
The optional Bay door is an overlay on the flush front. The standard flush door and glass must remain on the unit.
1)Hook the top of the bay door over the flush door flange and swing the bottom against the bottom flange of the flush door.
2)Secure to the flush door bottom bracket with 2 screws provided.
3)Slide the valve extension knobs onto the valve knobs.
24 | Regency |