Regency P33R-LP2 Unit Dimensions, Checklist, Locating Your GAS Stove, Duct System Option

Page 6

INSTALLATION

INSTALLATION

UNIT DIMENSIONS

CHECKLIST

 

5) This appliance is Listed for bedroom instal-

lations when used with a Listed Millivolt

Thermostat. Some areas may have further

requirements, check local codes before

installation.

1)Locate appliance

a)Room location, page 6

b)Clearances to Combustibles, page 6

c)Mantle Clearances, page 7

d)Framing & Finishing Requirements, page 8

e)Venting Requirements, pages 10 to 15.

2)Assemble Top Facing Support and Side Nailing Strips, page 8. (NOTE: must be done before installing unit into fireplace.)

3)Install vent, pages 10 to 19.

4)Make gas and electrical connections. Test the pilot. Must be as per diagram. Page 20. Convert to Propane if desired, page 21.

5)Install brick panels (optional), page 22.

6)Install logs and embers and rockwool where indicated on page 22.

7)Install Flush Door Front (Standard) and optional Flush Gold Trim, page 23.

8)Install optional Double Screen Door, page 24.

9)Install Optional Bay Front and optional Bay Gold Trim, page 24.

10)Install Louvers (Flush or Bay), pages 24 and 25.

11)Install optional Wall Switch, Remote Control, or Wall Thermostat, page 25.

11)Install Optional Fan, page 27.

13)Final check.

Before leaving this unit with the customer, the installer must ensure that the appliance is firing correctly and operation fully explained to customer.

This includes:

1)Clocking the appliance to ensure the cor- rect firing rate (rate noted on label) after burning appliance for 15 minutes.

2)If required, adjusting the primary air to ensure that the flame does not carbon. First allow the unit to burn for 15-20 min. to stabilize.

CAUTION: Any alteration to the product that causes sooting or carboning that results in damage is not the responsibil- ity of the manufacturer.

LOCATING YOUR

GAS STOVE

1)When selecting a location for your stove, ensure that the clearances outlined on this page are met.

2)Provide adequate clearances for servicing.

3)The appliance must be installed on a flat, solid, continuous surface (e.g. wood, met- al, concrete). This may be the floor, or raised up on a platform to enhance its visual impact. If the appliance is going to be in- stalled on carpeting, combustible linoleum tile or other combustible material other than wood flooring, the appliance must be in- stalled on a metal or wood panel extending the full width and depth of the appliance.

4)The P33R-2 Direct Vent Gas Fireplace can be installed in a recessed position or framed out into the room as in A, B, C, D. See Dia. 1.

6)

The P33R-2 Direct Vent Gas Fireplace is

 

approved for alcove installations, which

 

meet the clearances listed on this page.

7)

We recommend that you plan your installa-

 

tion on paper using exact measurements

 

for clearances and floor protection before

 

actually installing this appliance. Have a

 

qualified inspector, dealer, or installer re-

 

view your plans before installation.

Note: For vent terminations see page 10.

Diagram 1

A)Flat on Wall

B)Flat on Wall Corner

C)Recessed into Wall/Alcove

D)Corner

DUCT SYSTEM

OPTION

KIT #946-556

The HeatWave Air Duct Kit increases the effectiveness of your fireplace by dispersing warm air from the fireplace to remote locations in the same room or other rooms in your home.

Up to two kits may be installed on the fireplace. Please Note: Only 1 HeatWave kit may be operated at one time. This includes the internal blower option as well.

6

Regency P33R-2 Zero Clearance Rear Vent Direct Vent Gas Fireplace

Image 6
Contents P33R Zero Clearance Rear Direct Vent Information for MOBILE/MANUFACTURED Homes After First Sale To the New OwnerTable of Contents Safety Label Save These Instructions InstallationGeneral Safety Information Before YOU StartLocating Your GAS Stove Unit DimensionsChecklist Duct System OptionFire hazard is an extreme risk if Clearances Combustible MantelsMantel LEG Clearances These clearances are not adFraming and Finishing Top Facing Support Side Nailing Strips Unit Assembly Prior to InstallationTop Standoff Assembly Screw PositionVent Air supply outletVenting Introduction Regency Direct Vent System Flex Horizontal Terminations onlyInstallation Procedures For Regency Direct Vent System FlexSimpson Dura-Vent Direct Vent GS Simpson DURA-VENT VentingSimpson DURA-VENT Venting Components List Parts not supplied by Dura-VentVenting Arrangements Horizontal Terminations Dura-Vent System or Regency DV FlexVenting Arrangements Vertical Terminations Propane & Natural GasVertical Termination With CO-LINEAR Flex System Required PartsAlternate Approved Caps Installation Horizontal Installations Snorkel TerminationsGAS Line Installation Vertical TerminationHigh Elevation Pilot AdjustmentGAS Pipe Pressure Testing T. Valve DescriptionConversion Kit Contains Rear Log SupportLOG SET Installation Optional Brick PanelsStandard Flush Door Optional Flush TrimFlush Louvers Double Screen DoorOptional BAY Door Thermostat Wire Table Optional Wall Thermostat Remote ControlOptional Wall Switch BAY LouversWiring Diagram Do not cut the ground terminal off under any circumstancesInstalling the Optional FAN Secure left side with 2 screwsOperating Instructions Copy of the Lighting Plate InstructionsAeration Adjustment Lighting ProcedureShutdown Procedure Operating InstructionsMaintenance Thermocouple Flush Glass Replacement Bay Glass ReplacementThermopile Glass GasketInstalling Valve Removing ValveShut off the gas supply Parts List DescriptionBurner & Log Assembly Flush Front & Louvers Bay Front & Louvers Page Page Warranty Warranty LifetimeInstaller Please complete the following information