Regency L900E-NG installation manual Unit Assembly, Prior to Installation

Page 12

INSTALLATION

UNIT ASSEMBLY

SIDE NAILING STRIPS

FINISHING TEMPLATE

INSTALLATION

PRIOR TO

INSTALLATION

The Top Facing Support, the Side Nailing Strips and the 2 Top Standoffs must be correctly positioned and attached to the top before unit is slipped into position.

TOP STANDOFF ASSEMBLY

The top standoffs are shipped in a fl at position and must be folded into shape and attached.

1)

Remove the standoffs from the fi replace

 

top.

2)

Take each standoff and bend into the correct

 

shape. Bend up at the bend lines until the

 

screw holes in the standoff and the pre-

 

punched screw holes on the fi replace top

 

line up.

3)

Attach the standoff securely to the top

 

with 2 screws per standoff (on opposite

The side nailing strips come attached to the unit. There are 3 plates, one on the top and bottom that can be folded out as required.

In order to maintain a clean face; the L900E allows for a 1/8” in overlap of fi nishing material, such as rock or tile, on both the left and right hand sides of the unit (top and bottom sides do not allow for an overlap), this overlap must not be exceeded or the glass door will no longer open properly.

Non-combustible wall board is installed up to the fl anges on all sides of the unit. When installing any additional facing material use the Finishing Template (included with the unit) to ensure that the fi nishing material does not exceed the allowable overlap.

The Finishing Template uses two magnets to attach itself to the fl ange on the left or right side of the unit (see diagram below). Install the facing material up to the outside edge (when facing the unit) of the fi nishing template. This template may be discarded after the facing material has been installed.

corners).

Side Nailing Strips shown folded out.

12

Regency® L900E Direct Vent Gas Fireplace

Image 12
Contents Libertytm L900E Gas Fireplace Manufactured Mobile Home Requirements Information for MOBILE/MANUFACTURED Homes After First SaleTable of Contents Safety Label InstallationRequirements MA Code CO DetectorUnit Dimensions Installation General Safety InformationInstallation Checklist Important Message Save These InstructionsHeat Release KIT Hearth RequirementsManufactured Mobile Home Additional Requirements Locating Your GAS FireplaceClearances Mantel Clearances Mantel LEG ClearancesFraming & Finishing Header On EdgeUnit Assembly Prior to InstallationVenting Introduction Vent Restrictor PositionExterior Vent Termination Requirements Venting Arrangements Horizontal Termination FlexFPI Kit # Length Contains Rigid Pipe Venting Systems Basic Horizontal & Vertical Terminations8 Rigid Pipe Cross Reference Chart 58DVA-16ABL676 & L900 Direct Vent Fireplace Vent Restrictor Setting Allowable Horizontal TerminationsHorizontal Venting with Two 2 90o Elbows Vertical Venting with Three 3 90o Elbows Allowable Vertical Terminations Unit Installation with Horizontal Termination Unit Installation With Vertical Termination DiagramMinimum Vent FeetUnit Installation Astrocap XLPilot Adjustment TestingAeration GAS Line Installation AdjustmentBACK-UP Battery Installation Heat ShieldBrick Panel Installation Handle with care. do not Force Into PositionExterior Brick Panel Installation LOG SET Installation 03-41 03-44 03-45 03-4203-43Embers on bottom brick panel Wiring Diagram Do not cut the ground terminal off under any circumstancesOperating Instructions Operation During Power Outage Backup BatteryNormal Operating Sounds GAS Appliances For Your Safety Read Before Lighting Copy of Lighting Plate InstructionsMaintenance BACK-UP Battery Replacement Control BOX ReplacementMaintainence Do not Remove Valve Tray Replacement Latch ScrewRear Log Stand Parts List Main AssemblyBurner & LOG Assembly Description 910-937Warranty Warranty Limited LifetimeInstaller Please complete the following information