Regency L900E-NG installation manual Allowable Horizontal Terminations, Vent Restrictor Setting

Page 19

INSTALLATION

VENTING ARRANGEMENTS

ALLOWABLE HORIZONTAL TERMINATIONS

The diagram shows all allowable combinations of vertical runs with horizontal terminations, using one 90o two 45o elbows equal one 90o elbow).

Note: Must use optional rigid pipe adapter (Part# 770-994) when using Rigid Pipe Venting Systems.

* A Vent Guard is required when the AstroCap is installed above grade at 7 feet or lower.

IMPORTANT NOTE

• The Simpson Dura-Vent and Selkirk Direct Temp horizontal termination caps cannot be used in any applications.

• Only the AstroCap XL and Snorkels are certified for horizontal terminations.

VENT RESTRICTOR SETTING:

Vent restrictor at 0" - factory set, no adjustment required unless otherwise indicated.

Refer to the "Vent Restrictor Position" section for details on how to change the vent restrictor to Set 1, Set 2 or Set 3 if required.

A vent guard is required when the AstroCap is installed above grade at 7 feet or lower.

A vent guard may also be required in other installations as per local codes, refer to "Exterior Vent Termination Requirements" section for details.

Note: Regency® Direct Vent System (Flex) is only approved for horizontal terminations.

Maintain clearances to combustibles as listed in "Clearances" section

Horizontal vent must be supported every 3 feet.

Firestops are required at each floor level and whenever passing through a wall.

A wall thimble is mandatory for all horizontal terminations due to high temperatures.

INSTALLATION

Regency® L900E Direct Vent Gas Fireplace

19

Image 19
Contents Libertytm L900E Gas Fireplace Information for MOBILE/MANUFACTURED Homes After First Sale Manufactured Mobile Home RequirementsTable of Contents Installation Safety LabelMA Code CO Detector RequirementsUnit Dimensions Important Message Save These Instructions InstallationGeneral Safety Information Installation ChecklistLocating Your GAS Fireplace Heat Release KITHearth Requirements Manufactured Mobile Home Additional RequirementsClearances Mantel LEG Clearances Mantel ClearancesHeader On Edge Framing & FinishingPrior to Installation Unit AssemblyVent Restrictor Position Venting IntroductionExterior Vent Termination Requirements Horizontal Termination Flex Venting ArrangementsFPI Kit # Length Contains Basic Horizontal & Vertical Terminations Rigid Pipe Venting Systems58DVA-16AB 8 Rigid Pipe Cross Reference ChartL676 & L900 Direct Vent Fireplace Allowable Horizontal Terminations Vent Restrictor SettingHorizontal Venting with Two 2 90o Elbows Vertical Venting with Three 3 90o Elbows Allowable Vertical Terminations Unit Installation with Horizontal Termination Feet Unit Installation With Vertical TerminationDiagram Minimum VentAstrocap XL Unit InstallationAdjustment Pilot AdjustmentTesting Aeration GAS Line InstallationHeat Shield BACK-UP Battery InstallationHandle with care. do not Force Into Position Brick Panel InstallationExterior Brick Panel Installation 03-41 03-44 03-45 03-4203-43 LOG SET InstallationEmbers on bottom brick panel Do not cut the ground terminal off under any circumstances Wiring DiagramOperating Instructions Backup Battery Operation During Power OutageNormal Operating Sounds GAS Appliances Copy of Lighting Plate Instructions For Your Safety Read Before LightingMaintenance Control BOX Replacement BACK-UP Battery ReplacementMaintainence Do not Remove Latch Screw Valve Tray ReplacementRear Log Stand Main Assembly Parts ListDescription 910-937 Burner & LOG AssemblyWarranty Limited Lifetime WarrantyInstaller Please complete the following information