CLEARANCES

The clearances listed below are Minimum distances unless otherwise stated:

A major cause of chimney related fires is failure to maintain required clearances (air space) to combustible materials. It is of the greatest importance that this fireplace and vent system be installed only in accordance with these instructions.

Caution Requirements

The top, back and sides of the fi replace are defi ned by standoffs. The metal ends of the standoff may NOT be recessed into combustible construction.

Clearance to Combustibles from:

Back 0" (0mm)

Side 0" (0mm)

Floor 0" (0mm)

Minimum Clearance from Top of Front Facing:

Mantel

min. 17-1/2"

(445mm)

Ceiling

49"

(1245mm) from top of front facing

Side Wall to Unit:

16"* (406mm)

Horizontal Vent Clearances to Combustibles:

Top

3"

(76mm)

Side

2"

(51mm)

Bottom

2"

(51 mm)

Vertical Vent Clearances to Combustibles:

All Sides

2"

(51mm)

Alcove Clearances:

Min. Depth

36"

(914mm)

Min. Width*

84"

(2134mm)

Min. Height

84"

(2134mm)

* Alcove side wall must have a minimum of 16" (406mm) clearance on one side.

WARNING

Fire hazard is an extreme risk

if these clearances (air space) to combustible materials are not adhered to. It is of greatest importance that this fireplace and vent system be installed only in accordance with these instructions.

INSTALLATION

Regency® L900E Direct Vent Gas Fireplace

9

Image 9
Contents Libertytm L900E Gas Fireplace Information for MOBILE/MANUFACTURED Homes After First Sale Manufactured Mobile Home RequirementsTable of Contents Installation Safety LabelMA Code CO Detector RequirementsUnit Dimensions General Safety Information InstallationInstallation Checklist Important Message Save These InstructionsHearth Requirements Heat Release KITManufactured Mobile Home Additional Requirements Locating Your GAS FireplaceClearances Mantel LEG Clearances Mantel ClearancesHeader On Edge Framing & FinishingPrior to Installation Unit AssemblyVent Restrictor Position Venting IntroductionExterior Vent Termination Requirements Venting Arrangements Horizontal Termination FlexFPI Kit # Length Contains Basic Horizontal & Vertical Terminations Rigid Pipe Venting Systems58DVA-16AB 8 Rigid Pipe Cross Reference ChartL676 & L900 Direct Vent Fireplace Allowable Horizontal Terminations Vent Restrictor SettingHorizontal Venting with Two 2 90o Elbows Vertical Venting with Three 3 90o Elbows Allowable Vertical Terminations Unit Installation with Horizontal Termination Diagram Unit Installation With Vertical TerminationMinimum Vent FeetAstrocap XL Unit InstallationTesting Pilot AdjustmentAeration GAS Line Installation AdjustmentHeat Shield BACK-UP Battery InstallationHandle with care. do not Force Into Position Brick Panel InstallationExterior Brick Panel Installation 03-41 03-44 03-45 03-4203-43 LOG SET InstallationEmbers on bottom brick panel Do not cut the ground terminal off under any circumstances Wiring DiagramOperating Instructions Operation During Power Outage Backup BatteryNormal Operating Sounds GAS Appliances Copy of Lighting Plate Instructions For Your Safety Read Before LightingMaintenance BACK-UP Battery Replacement Control BOX ReplacementMaintainence Do not Remove Latch Screw Valve Tray ReplacementRear Log Stand Main Assembly Parts ListDescription 910-937 Burner & LOG AssemblyWarranty Limited Lifetime WarrantyInstaller Please complete the following information