Regency L900E-NG Venting Arrangements, Horizontal Termination Flex, FPI Kit # Length Contains

Page 15

INSTALLATION

VENTING ARRANGEMENTS

HORIZONTAL TERMINATION (FLEX)

Regency® Direct Vent System

These venting systems, in combination with the L900E, have been tested and listed as a direct vent system by Warnock Hersey. The location of the termination cap must conform to the requirements in the Vent Terminal Locations diagram from the "Exterior Vent Termination Locations" section.

FPI Direct Vent (Flex) System Termination Kits include all the parts needed to install the L900E using a flexible vent.

INSTALLATION

FPI Kit #

Length

Contains:

#946-618

6 Feet

1)

8” fl exible liner (Kit length)

 

 

2)

5” fl exible liner (Kit length)

 

 

3)

spring spacers (3)

 

 

4)

thimble (2)

 

 

5)

AstroCap termination cap (1)

#946-616

10 Feet

6)

screws (12)

 

 

7)

tube of Mill Pac (1)

 

 

8)

plated screws (8)

 

 

9)

S.S. screws #8 x 1-1/2” drill point, (4)

 

 

10)

vinyl siding standoff

 

 

 

 

Vinyl Siding

Standoff

Wall Thimble

(Mandatory in all

Horizontal Terminations)

5” dia. flue pipe

 

8” dia.

spring spacer

Flue pipe

 

Vent Guard - if required*

(Part #946-506/P)

AstroCap XLTM

Termination Cap

(Part #946-623/P)

*A Vent Guard is required when the AstroCap is installed above grade at 7 feet or lower.

Notes:

1)Liner sections should be continuous without any joints or seams.

2)Only Flex pipe purchased from FPI may be used for Flex installations.

3)Horizontal vent must be supported every 3 feet.

4)Awallthimbleismandatoryforallhorizontalterminations due to high temperatures.

Regency® L900E Direct Vent Gas Fireplace

15

Image 15
Contents Libertytm L900E Gas Fireplace Information for MOBILE/MANUFACTURED Homes After First Sale Manufactured Mobile Home RequirementsTable of Contents Installation Safety LabelMA Code CO Detector RequirementsUnit Dimensions Important Message Save These Instructions InstallationGeneral Safety Information Installation ChecklistLocating Your GAS Fireplace Heat Release KITHearth Requirements Manufactured Mobile Home Additional RequirementsClearances Mantel LEG Clearances Mantel ClearancesHeader On Edge Framing & FinishingPrior to Installation Unit AssemblyVent Restrictor Position Venting IntroductionExterior Vent Termination Requirements Venting Arrangements Horizontal Termination FlexFPI Kit # Length Contains Basic Horizontal & Vertical Terminations Rigid Pipe Venting Systems58DVA-16AB 8 Rigid Pipe Cross Reference ChartL676 & L900 Direct Vent Fireplace Allowable Horizontal Terminations Vent Restrictor SettingHorizontal Venting with Two 2 90o Elbows Vertical Venting with Three 3 90o Elbows Allowable Vertical Terminations Unit Installation with Horizontal Termination Feet Unit Installation With Vertical TerminationDiagram Minimum VentAstrocap XL Unit InstallationAdjustment Pilot AdjustmentTesting Aeration GAS Line InstallationHeat Shield BACK-UP Battery InstallationHandle with care. do not Force Into Position Brick Panel InstallationExterior Brick Panel Installation 03-41 03-44 03-45 03-4203-43 LOG SET InstallationEmbers on bottom brick panel Do not cut the ground terminal off under any circumstances Wiring DiagramOperating Instructions Operation During Power Outage Backup BatteryNormal Operating Sounds GAS Appliances Copy of Lighting Plate Instructions For Your Safety Read Before LightingMaintenance BACK-UP Battery Replacement Control BOX ReplacementMaintainence Do not Remove Latch Screw Valve Tray ReplacementRear Log Stand Main Assembly Parts ListDescription 910-937 Burner & LOG AssemblyWarranty Limited Lifetime WarrantyInstaller Please complete the following information