Regency L900E-NG Rigid Pipe Venting Systems, Basic Horizontal & Vertical Terminations

Page 16

INSTALLATION

RIGID PIPE VENTING SYSTEMS

BASIC HORIZONTAL & VERTICAL TERMINATIONS

INSTALLATION

Rigid Pipe Vent Systems offer a complete line of component parts for installation of both horizontal and vertical installations. Many items are offered in decorative black, as well as gal- vanized fi nish.

The minimum components required for a basic horizontal termination are:

1AstroCap XL

190o Elbow

1Rigid Pipe Adaptor

1Wall Thimble

1Length of pipe to suit wall thickness

The minimum components required for a basic vertical termination are:

1Vertical Termination Cap

1Rigid Pipe Adaptor

1Lengths of pipe to adequately penetrate roof

1Ceiling Firestop

1Flashing

1Storm Collar

Wall thickness is measured from the back standoffs to the inside mounting surface of termination cap. For siding other than vinyl furring strips may be used, instead of the vinyl siding standoff, to create a level surface to mount the vent terminal. The Terminal must not be recessed into siding. Measure the wall thickness including furring strips.

If a Vinyl Siding Standoff is required (it must be used with vinyl siding), measure to outside surface of wall without siding and add 2 inches.

Vertical Terminal

 

Storm Collar

 

 

Vinyl Siding

Flashing

Standoff (Optional)

Vent Guard - if required*

 

 

(Part #946-506/P)

AstroCap XL

Ceiling FirestopTermination Cap

(Part #946-623/P)

Wall Thimble

(Mandatory in all

Horizontal Terminations)

Pipe Length

Adj.Pipe Length

 

 

11" - 14-5/8"

 

90o Elbow

24”

Pipe

Length

Rigid Pipe

Adapter

(770-994)

* A Vent Guard is required when the AstroCap is installed above grade at 7 feet or lower.

Alternate

Horizontal Termination

Caps

Part # 5DT-ST14 (14")

Part # 5DT-ST36 (36")

WARNING:

Do not combine venting components from different venting systems.

Use of the the AstroCap XLTM is acceptable with all systems.

This product has been evaluated by Intertek for using a Rigid Pipe Adaptor in conjunction with Duravent Direct-Vent GS and Selkirk Direct- Temp systems. Use of these systems with the Rigid Pipe adaptor is deemed acceptable and does not affect the Intertek WHI listing of components.

IMPORTANT NOTE

The Simpson Dura-Vent and Selkirk Direct Temp horizontal termination caps cannot be used in any applications.

Only the AstroCap XL and Snorkels are certified for horizontal terminations.

When using Rigid Vent other than

Simpson Dura-Vent, 3 screws must be used to secure rigid pipe to adaptor.

The FPI AstroCap XLTM is certifi ed for installations using FPI venting systems as well as Simpson Dura-Vent®Direct Vent GS and Selkirk Direct-Temp. AstroCap XLTM is a proprietary trademark of FPI Fireplace Products International Ltd. Dura-Vent® and Direct Vent GS are registered and/or proprietary trademarks of Simpson Dura-Vent Co. Inc.

16

Regency® L900E Direct Vent Gas Fireplace

Image 16
Contents Libertytm L900E Gas Fireplace Manufactured Mobile Home Requirements Information for MOBILE/MANUFACTURED Homes After First SaleTable of Contents Safety Label InstallationRequirements MA Code CO DetectorUnit Dimensions Installation General Safety InformationInstallation Checklist Important Message Save These InstructionsHeat Release KIT Hearth RequirementsManufactured Mobile Home Additional Requirements Locating Your GAS FireplaceClearances Mantel Clearances Mantel LEG ClearancesFraming & Finishing Header On EdgeUnit Assembly Prior to InstallationVenting Introduction Vent Restrictor PositionExterior Vent Termination Requirements Horizontal Termination Flex Venting ArrangementsFPI Kit # Length Contains Rigid Pipe Venting Systems Basic Horizontal & Vertical Terminations8 Rigid Pipe Cross Reference Chart 58DVA-16ABL676 & L900 Direct Vent Fireplace Vent Restrictor Setting Allowable Horizontal TerminationsHorizontal Venting with Two 2 90o Elbows Vertical Venting with Three 3 90o Elbows Allowable Vertical Terminations Unit Installation with Horizontal Termination Unit Installation With Vertical Termination DiagramMinimum Vent FeetUnit Installation Astrocap XLPilot Adjustment TestingAeration GAS Line Installation AdjustmentBACK-UP Battery Installation Heat ShieldBrick Panel Installation Handle with care. do not Force Into PositionExterior Brick Panel Installation LOG SET Installation 03-41 03-44 03-45 03-4203-43Embers on bottom brick panel Wiring Diagram Do not cut the ground terminal off under any circumstancesOperating Instructions Backup Battery Operation During Power OutageNormal Operating Sounds GAS Appliances For Your Safety Read Before Lighting Copy of Lighting Plate InstructionsMaintenance Control BOX Replacement BACK-UP Battery ReplacementMaintainence Do not Remove Valve Tray Replacement Latch ScrewRear Log Stand Parts List Main AssemblyBurner & LOG Assembly Description 910-937Warranty Warranty Limited LifetimeInstaller Please complete the following information