Harman Stove Company PB 105 manual Cleaning Steps

Page 32

Maintenance

Heat Exchanger Cleanout Rod Handles

Firebox Door

Heat Exchanger Tube

Secondary Ash

Chamber Access Plate

Fines Cleanout Cover

Firebox Wall

Cleaning This cleaning should be done after each ton of pellets

used. The frequency of this cleaning will be directly related to the quality and the ash content of the pel- lets being used. Keep in mind that the cleaner the heat exchanger surface is kept, the higher the heat transfer efficiency will be.

Due to it’s ease of restarting it is recommended that the boiler be OFF and COOL before cleaning.

Start by actuating the (3) heat exchanger cleanout rods by pulling and pushing these rods vigorously several times. This action will remove any fly ash built up on the heat exchanger tubes. This can also be done at any time during the operation of the boiler to maintain higher ef- ficiencies. Make sure that these rods are pushed in when cleaning is completed.

Cleaning Steps

-Open the hopper swing plate to access burnpot and also the firebox. With a wisp brush, wire brush, stiff bristled paint brush or a soot vac, clean the firebox walls and any fly ash that has accumulated on the ledges of the burnpot, or burnpot opening. At this time you can scrape and clean the burnpot and fines cleanout area.

-Open firebox door and vacuum ash from ledges and ash deflector. You can also clean the firebox door viewing glass using a typical glass cleaner and soft cloth.

Ash Door

-Open the ash door and remove the ash pan. Dispose of any ash that has accumulated in the ash pan as well as any fly ash from within the ash pan area.

-Remove the (4) thumbscrews on the secondary ash chamber access plate and remove it to access the secondary ash chamber. Remove all fly ash from this area. This process should be done as needed.

-Inspect all sealing gaskets to ensure a proper seal and re-install all components removed for cleaning.

CAUTION: Cleanout of the heat exchanger, flue pipe, chimney, and combustion blower fan housing, is especially important at the end of the heating season to minimize corrosion during the summer months, caused by accumulated ash.

NOTE: To minimize the amount of stress placed on the hopper swing plate hinges, opening of the hopper swing plate should be done with the least amount of fuel in the hopper as possible.

32

Image 32
Contents Installation & Operating Manual Harman PB 105 Pellet BoilerPage Parts Locations Introduction Report # 135-S-16-6Warranty Harman Central Heating Products Limited WarrantyAssembly Boiler Kit Materials Refer toDesign Installation is to be Performed by a Qualified Installer Venting Venting Ventingti g VentingVenting Installation Keep combustibles away From flue outletOutside Air Main Wiring Installation InstallingInstallationDuct Installing Duct/AirInstallationConditioning Installation Example of Typical Tankless Domestic HOT Water PipingUnion AIR Vent Installation Over Heat Safety Zone Power Failure / Heat Dissipation LoopDraft Test Procedure TestFuel Specifications Fuel and Fuel StorageOperation Status LightSetting The Boiler Temperature Without the Outdoor Air Temperature Sensor InstalledPellet Boiler Outdoor Air Reset Operation Turn Mode Selector to OFF Starting a Fire AutomaticallyFlip the Igniter Switch up into the Auto position MAX. TempLighting a Fire Manually Have matches or other ignition source readyOperation Maintenance Burnpot CleaningFeeder Chamber Fig To remove the feeder coverOpen Ash Door Remove Ash PanCleaning Steps Combustion Blower Cleaning Fuel TroubleshootingHelpful Hints Atmospheric Conversion Pb105 #8 Ash base Assembly Pb105 #28 Feeder Assembly Stocked at depot Electrical 120 VAC 60 Hz SpecificationsBTU Input Range= 0, and 9350 to 113,900 Diagram Pellet Boiler Wiring DiagramPower Failure Backup Supply Testing Label Exceeding -.9 in Water Column / -224PaService Record / Notes Service Record / Notes Proudly Printed On 100% Recycled Paper Quick Reference Auto-Light