Venting

Requirements for Terminating the Venting WARNING: Venting terminals must not be recessed into a wall or siding.

NOTE: Only PL vent pipe wall pass-throughs and fire stops should be used when venting through combustible materials.

NOTE: Always take into consideration the effect the prevailing wind direction or other wind currents will cause with flyash and /or smoke when placing the ter- mination.

In addition, the following must be observed: A. The clearance above grade must be a minimum of 18”.1

B. The clearance to a window or door that may be opened must be a minimum of 48” to the side, 48” below the window/door, and 12” above the window/ door.1

C. A 12” clearance to a permanently closed window is recommended to prevent condensation on the window. D. The vertical clearance to a ventilated soffit located above the terminal within a horizontal distance of 2 feet (60 cm) from the center-line of the terminal must be a minimum of 18”.

E. The clearance to an unventilated soffit must be a minimum of 12”.

F. The clearance to an outside corner is 11” from center of pipe.

G. The clearance to an inside corner is 12”.

H. A vent must not be installed within 3 feet (90 cm)

above a gas meter/regulator assembly when measured from the horizontal center-line of the regulator.1

I. The clearance to service regulator vent outlet must be a minimum of 6 feet.1

J. The clearance to a non-mechanical air supply inlet to the building or the combustion air inlet to any other appliance must be a minimum of 48”.1

K. The clearance to a mechanical air supply inlet must be a minimum of 10 feet.1

L. The clearance above a paved sidewalk or a paved driveway located on public property must be a minimum of 7 feet.1,2

M. The clearance under a veranda, porch, deck or balcony must be a minimum of 12 inches.1,3 (B Also applies)

NOTE: The clearance to vegetation and other exterior combustibles such as mulch is 36” as measured from the center of the outlet or cap. This 36” radius continues to grade or a minimum of 7 feet below the outlet.

1Certain Canadian and or Local codes or regulations may require different clearances.

2A vent shall not terminate directly above a side- walk or paved driveway which is located between two single  family dwellings and serves both dwellings.

3Only permitted if veranda, porch, deck, or balcony is fully open on a minimum of 2 sides beneath the floor.

NOTE: Where passage through a wall, or partition of combustible construction is desired, the installation shall conform to CAN/CSA-B365. (if in Canada)

= Vent terminal

= Air supply inlet

= Area where terminal is not permitted

Fig. 2

 

 

 

9

Image 9
Contents Harman PB 105 Pellet Boiler Installation & Operating ManualPage Parts Locations Report # 135-S-16-6 IntroductionHarman Central Heating Products Limited Warranty WarrantyBoiler Kit Materials Refer to AssemblyDesign Installation is to be Performed by a Qualified Installer Venting Venting Venting Ventingti gKeep combustibles away From flue outlet Venting InstallationOutside Air Main Wiring Installation InstallingInstallationDuct Installing Duct/AirInstallationConditioning Example of Typical Tankless Domestic HOT Water Piping InstallationUnion AIR Vent Installation Power Failure / Heat Dissipation Loop Over Heat Safety ZoneTest Draft Test ProcedureFuel and Fuel Storage Fuel SpecificationsStatus Light OperationWithout the Outdoor Air Temperature Sensor Installed Setting The Boiler TemperaturePellet Boiler Outdoor Air Reset Operation Starting a Fire Automatically Turn Mode Selector to OFFMAX. Temp Flip the Igniter Switch up into the Auto positionHave matches or other ignition source ready Lighting a Fire ManuallyOperation Burnpot Cleaning MaintenanceFeeder Chamber Fig To remove the feeder coverRemove Ash Pan Open Ash DoorCleaning Steps Combustion Blower Cleaning Troubleshooting Helpful HintsFuel Atmospheric Conversion Pb105 #8 Ash base Assembly Pb105 #28 Feeder Assembly Stocked at depot Specifications BTU Input Range= 0, and 9350 to 113,900Electrical 120 VAC 60 Hz Pellet Boiler Wiring Diagram DiagramPower Failure Backup Supply Exceeding -.9 in Water Column / -224Pa Testing LabelService Record / Notes Service Record / Notes Proudly Printed On 100% Recycled Paper Quick Reference Auto-Light