Draft Test Procedure

After the venting is completed, the firebox low draft will need to be checked and possibly adjusted. After removing the 3/8” bolt from the draft hole shown in Fig. 9, insert the draft meter tube. The appliance doors and hopper lid must be latched during this test. (It is recom- mended that the draft meter have a scale of 0 to 1” WC.)

Turn the feed adjuster to “Test”. this will start the combustion blower and allow you to check and record the High Draft ______ - IWC date _______ The

maximum draft must not exceed -.85” W.C. Some form of vent restrictor may be needed. (There is no control board adjustment for the High Draft)

After the first 60 seconds the “Test” mode lowers the combustion blower voltage to the Low Burn voltage. During this lowered voltage cycle the Low Burn Draft must be checked and adjusted if necessary. The recom- mended low draft setting should be between -.25 & -.35 IWC. Depending on the amount of vertical rise, it may not be possible to get a low draft reading in this range. In this case, a maximum low draft of -.55 is acceptable.

The adjustment screw is through the small hole to the right of the Igniter Light. See Fig. 10. Adjusted Low Draft is __________ -IWC.

Don’t forget to turn the feed adjuster off of “Test”.

Do not operate if the high draft exceeds -.85” W.C.

Excessive draft readings may be due to restriction in the combustion air supply. Check for obstructions.

The Control

The boiler has the option to have the control panel covered or un-covered See Fig. 11. There is a pair of slots provided for each position. Simply move the cover to the desired position by placing the tabs on the cover in the proper slots.

CAUTION: Hot while in operation. Do not touch. Keep children, clothing, furniture, and other combustible material out of the installation clearance area.

WARNING: Do not operate with the hopper lid or fire chamber or ash removal doors open.

WARNING: Do not store fuel or other combustible material within installation clearance area.

21

Image 21
Contents Harman PB 105 Pellet Boiler Installation & Operating ManualPage Parts Locations Report # 135-S-16-6 IntroductionHarman Central Heating Products Limited Warranty WarrantyBoiler Kit Materials Refer to AssemblyDesign Installation is to be Performed by a Qualified Installer Venting Venting Venting Ventingti gKeep combustibles away From flue outlet Venting InstallationOutside Air Main Wiring Installation InstallingInstallationDuct Installing Duct/AirInstallationConditioning Example of Typical Tankless Domestic HOT Water Piping InstallationUnion AIR Vent Installation Power Failure / Heat Dissipation Loop Over Heat Safety ZoneTest Draft Test ProcedureFuel and Fuel Storage Fuel SpecificationsStatus Light OperationWithout the Outdoor Air Temperature Sensor Installed Setting The Boiler TemperaturePellet Boiler Outdoor Air Reset Operation Starting a Fire Automatically Turn Mode Selector to OFFMAX. Temp Flip the Igniter Switch up into the Auto positionHave matches or other ignition source ready Lighting a Fire ManuallyOperation Burnpot Cleaning MaintenanceFeeder Chamber Fig To remove the feeder coverRemove Ash Pan Open Ash DoorCleaning Steps Combustion Blower Cleaning Troubleshooting Helpful HintsFuel Atmospheric Conversion Pb105 #8 Ash base Assembly Pb105 #28 Feeder Assembly Stocked at depot Specifications BTU Input Range= 0, and 9350 to 113,900Electrical 120 VAC 60 Hz Pellet Boiler Wiring Diagram DiagramPower Failure Backup Supply Exceeding -.9 in Water Column / -224Pa Testing LabelService Record / Notes Service Record / Notes Proudly Printed On 100% Recycled Paper Quick Reference Auto-Light