Main Wiring Installation

To install power to the boiler, first remove the cover on the 4” X 4” junction box located on the back of the unit. There are several knockout holes provided for the incoming main power wires. Also, a knockout hole can be used for the auxiliary output overheat zone (if used).

The minimum recommended circuit is 6 AMP - 120 VAC - 60 HZ. This boiler should be the only appliance on the circuit. If a 15 AMP circuit breaker is used at the distribution box, the boiler must be protected with an in-line fuse rated at 6 AMP.

This boiler should never be powered by the use of an extension cord.

The recommended high and low voltages are, 130 V.A.C. 60 Hz maximum high voltage, and 113 V.A.C. 60 Hz minimum low voltage.The furnace will continue to operate at voltages as low as 105 V.A.C. , although it can not be guaranteed that automatic ignition will occur.

NOTE: If other sources of electrical power are to be used ( such as a generator ) for normal operation or emergency operation, this source should be checked before installation. Many generators and inverters may not supply 120V.A.C. 60Hz. power stable enough to operate the control board properly. (Control board damage could occur).

Image 14
Contents Installation & Operating Manual Harman PB 105 Pellet BoilerPage Parts Locations Introduction Report # 135-S-16-6Warranty Harman Central Heating Products Limited WarrantyAssembly Boiler Kit Materials Refer toDesign Installation is to be Performed by a Qualified Installer Venting Venting Ventingti g VentingVenting Installation Keep combustibles away From flue outletOutside Air Main Wiring Installation InstallingInstallationDuct Installing Duct/AirInstallationConditioning Installation Example of Typical Tankless Domestic HOT Water PipingUnion AIR Vent Installation Over Heat Safety Zone Power Failure / Heat Dissipation LoopDraft Test Procedure TestFuel Specifications Fuel and Fuel StorageOperation Status LightSetting The Boiler Temperature Without the Outdoor Air Temperature Sensor InstalledPellet Boiler Outdoor Air Reset Operation Turn Mode Selector to OFF Starting a Fire AutomaticallyFlip the Igniter Switch up into the Auto position MAX. TempLighting a Fire Manually Have matches or other ignition source readyOperation Feeder Chamber Fig MaintenanceBurnpot Cleaning To remove the feeder coverOpen Ash Door Remove Ash PanCleaning Steps Combustion Blower Cleaning Fuel TroubleshootingHelpful Hints Atmospheric Conversion Pb105 #8 Ash base Assembly Pb105 #28 Feeder Assembly Stocked at depot Electrical 120 VAC 60 Hz SpecificationsBTU Input Range= 0, and 9350 to 113,900 Diagram Pellet Boiler Wiring DiagramPower Failure Backup Supply Testing Label Exceeding -.9 in Water Column / -224PaService Record / Notes Service Record / Notes Proudly Printed On 100% Recycled Paper Quick Reference Auto-Light