Harman Stove Company PB 105 manual Introduction, Report # 135-S-16-6

Page 4

Introduction

 

Table Of Contents

 

 

 

Warranty

5

 

 

Assembly

6

 

 

Venting

9

 

 

Installation

12

 

 

Fuel Specifications

22

 

 

Operation

23

 

 

Maintenance

30

 

 

Troubleshooting

34

 

 

Atmospheric Conversion

35

 

 

Service Parts

36

 

 

Specifications

41

 

 

Wiring Diagram

42

 

 

Testing Label

44

 

 

Quick Reference Start-Up

Back Cover

 

 

 

 

 

 

 

 

 

Appliance Certification.

Model: Pellet Burning Boiler - PB105

Test Lab: Omni-Test Laboratories, Inc.

Report #: 135-S-16-6

Type: Pellet Fueled Central/Supplementary For Residential Use

Standard(s): CAN/CSA B366.1-M91, and UL 391

Note: This appliance is also approved for installation into a shop.

WARNING! RISK OF FIRE! Hearth & Home Technologies disclaims any responsibility for, and the warranty and agency listing will be voided by the following actions:

DO NOT:

Install or operate a damaged appliance

Modify the appliance

Install other than as instructed by Hearth & Home Technologies

Operate the appliance without fully assembling all components

Operate the appliance without water in the system

Overfire the appliance

Install any component or part not approved by Hearth & Home Technologies

Improper installation, adjustment, alteration, service, or maintenance can cause injury or property damage. For assistance or additional information, consult a qualified installer, service agency or your dealer.

Please read this entire manual before you install and use your new

boiler. Failure to follow instructions may result in property damage, bodily injury, or even death.

SAVE THESE INSTRUCTIONS

Hearth & Home Technologies, Inc.

352 Mountain House Road

Halifax, PA 17032

4

Image 4
Contents Installation & Operating Manual Harman PB 105 Pellet BoilerPage Parts Locations Introduction Report # 135-S-16-6Warranty Harman Central Heating Products Limited WarrantyAssembly Boiler Kit Materials Refer toDesign Installation is to be Performed by a Qualified Installer Venting Venting Ventingti g VentingVenting Installation Keep combustibles away From flue outletOutside Air Main Wiring Installation InstallingInstallationDuct Installing Duct/AirInstallationConditioning Installation Example of Typical Tankless Domestic HOT Water PipingUnion AIR Vent Installation Over Heat Safety Zone Power Failure / Heat Dissipation LoopDraft Test Procedure TestFuel Specifications Fuel and Fuel StorageOperation Status LightSetting The Boiler Temperature Without the Outdoor Air Temperature Sensor InstalledPellet Boiler Outdoor Air Reset Operation Turn Mode Selector to OFF Starting a Fire AutomaticallyFlip the Igniter Switch up into the Auto position MAX. TempLighting a Fire Manually Have matches or other ignition source readyOperation Maintenance Burnpot CleaningFeeder Chamber Fig To remove the feeder coverOpen Ash Door Remove Ash PanCleaning Steps Combustion Blower Cleaning Helpful Hints TroubleshootingFuel Atmospheric Conversion Pb105 #8 Ash base Assembly Pb105 #28 Feeder Assembly Stocked at depot BTU Input Range= 0, and 9350 to 113,900 SpecificationsElectrical 120 VAC 60 Hz Diagram Pellet Boiler Wiring DiagramPower Failure Backup Supply Testing Label Exceeding -.9 in Water Column / -224PaService Record / Notes Service Record / Notes Proudly Printed On 100% Recycled Paper Quick Reference Auto-Light