Boilers intended to be connected to an existing boiler or boiler system shall:

1.Be capable of being installed without interfering with the normal delivery of heated water from the original boiler to the radiation system.

2.Be capable of being installed to operate as intended without affecting the operation of the electrical and mechanical safety controls of the original boiler.

3.Provide, upon completion of the installation, for a change over from one fuel to the other without requiring the manual adjustment of any controls or components other than the thermostats.

4.Be compatible with the operation of a service water-heating coil within the original boiler without bypassing the operation of the solid-fuel boiler.

5.Have provision for preventing, or adequate water capacity within the boiler to prevent, damage to the boiler from loss of circulation due to electrical power failure.

6.Be capable of being installed without changing the function of the control or rewiring of the original boiler. A wiring interconnec- tion is permitted. The electrical system of both boilers shall be powered from a single branch circuit without exception. (CAN/CSA-B366.1-M91)

7.Pertaining to CAN/CSA- B365-01, Have a clearly labelled device, located at each entrance to the boiler area, which can be thrown to discontinue operation of the feed system.

NOTICE: When installing with the atmospheric conversion: All of the pressurized system com- ponents shown are not necessary. Air vents or bleeders will need to be removed from the plumbing system to prevent air from entering the lines. Control Dipswitch #6 will need to be turned “ON”.

16

Image 16
Contents Installation & Operating Manual Harman PB 105 Pellet BoilerPage Parts Locations Introduction Report # 135-S-16-6Warranty Harman Central Heating Products Limited WarrantyAssembly Boiler Kit Materials Refer toDesign Installation is to be Performed by a Qualified Installer Venting Venting Ventingti g VentingVenting Installation Keep combustibles away From flue outletOutside Air Main Wiring Installation InstallingInstallationDuct Installing Duct/AirInstallationConditioning Installation Example of Typical Tankless Domestic HOT Water PipingUnion AIR Vent Installation Over Heat Safety Zone Power Failure / Heat Dissipation LoopDraft Test Procedure TestFuel Specifications Fuel and Fuel StorageOperation Status LightSetting The Boiler Temperature Without the Outdoor Air Temperature Sensor InstalledPellet Boiler Outdoor Air Reset Operation Turn Mode Selector to OFF Starting a Fire AutomaticallyFlip the Igniter Switch up into the Auto position MAX. TempLighting a Fire Manually Have matches or other ignition source readyOperation Maintenance Burnpot CleaningFeeder Chamber Fig To remove the feeder coverOpen Ash Door Remove Ash PanCleaning Steps Combustion Blower Cleaning Helpful Hints TroubleshootingFuel Atmospheric Conversion Pb105 #8 Ash base Assembly Pb105 #28 Feeder Assembly Stocked at depot BTU Input Range= 0, and 9350 to 113,900 SpecificationsElectrical 120 VAC 60 Hz Diagram Pellet Boiler Wiring DiagramPower Failure Backup Supply Testing Label Exceeding -.9 in Water Column / -224PaService Record / Notes Service Record / Notes Proudly Printed On 100% Recycled Paper Quick Reference Auto-Light