Harman Stove Company PB 105 manual Installation

Page 19

Installation

NOTE: Cold return water temperature (Sustained temperatures below 140 degrees Fahrenheit) will lead to condensation in the firebox. This moisture can lead to creosote formation. To help minimize moisture and creosote, it is strongly recommended that some form of temperature balance is incorporated into the return water system.

NOTICE: When installing with the atmospheric conversion: All of the pressurized system components shown are not nec- essary. Air vents or bleeders will need to be removed from the plumbing system to prevent air from entering the lines. Control Dipswitch #6 will need to be turned “ON”.

19

Image 19
Contents Harman PB 105 Pellet Boiler Installation & Operating ManualPage Parts Locations Report # 135-S-16-6 IntroductionHarman Central Heating Products Limited Warranty WarrantyBoiler Kit Materials Refer to AssemblyDesign Installation is to be Performed by a Qualified Installer Venting Venting Venting Ventingti gKeep combustibles away From flue outlet Venting InstallationOutside Air Main Wiring Installation InstallingInstallationDuct Installing Duct/AirInstallationConditioning Example of Typical Tankless Domestic HOT Water Piping InstallationUnion AIR Vent Installation Power Failure / Heat Dissipation Loop Over Heat Safety ZoneTest Draft Test ProcedureFuel and Fuel Storage Fuel SpecificationsStatus Light OperationWithout the Outdoor Air Temperature Sensor Installed Setting The Boiler TemperaturePellet Boiler Outdoor Air Reset Operation Starting a Fire Automatically Turn Mode Selector to OFFMAX. Temp Flip the Igniter Switch up into the Auto positionHave matches or other ignition source ready Lighting a Fire ManuallyOperation To remove the feeder cover MaintenanceBurnpot Cleaning Feeder Chamber FigRemove Ash Pan Open Ash DoorCleaning Steps Combustion Blower Cleaning Helpful Hints TroubleshootingFuel Atmospheric Conversion Pb105 #8 Ash base Assembly Pb105 #28 Feeder Assembly Stocked at depot BTU Input Range= 0, and 9350 to 113,900 SpecificationsElectrical 120 VAC 60 Hz Pellet Boiler Wiring Diagram DiagramPower Failure Backup Supply Exceeding -.9 in Water Column / -224Pa Testing LabelService Record / Notes Service Record / Notes Proudly Printed On 100% Recycled Paper Quick Reference Auto-Light