Harman Stove Company PB 105 manual Installation is to be Performed by a Qualified Installer

Page 8

Assembly

INSTALLATION IS TO BE PERFORMED BY A QUALIFIED INSTALLER.

NOTE: All installation clearances and restrictions must be adhered to.

NOTE:Use only 4” diameter type “L” or “PL” venting system. Be sure to inspect and clean exhaust venting system frequently.

8

Image 8
Contents Installation & Operating Manual Harman PB 105 Pellet BoilerPage Parts Locations Introduction Report # 135-S-16-6Warranty Harman Central Heating Products Limited WarrantyAssembly Boiler Kit Materials Refer toDesign Installation is to be Performed by a Qualified Installer Venting Venting Ventingti g VentingVenting Installation Keep combustibles away From flue outletOutside Air Main Wiring Installation InstallingInstallationDuct Installing Duct/AirInstallationConditioning Installation Example of Typical Tankless Domestic HOT Water PipingUnion AIR Vent Installation Over Heat Safety Zone Power Failure / Heat Dissipation LoopDraft Test Procedure TestFuel Specifications Fuel and Fuel StorageOperation Status LightSetting The Boiler Temperature Without the Outdoor Air Temperature Sensor InstalledPellet Boiler Outdoor Air Reset Operation Turn Mode Selector to OFF Starting a Fire AutomaticallyFlip the Igniter Switch up into the Auto position MAX. TempLighting a Fire Manually Have matches or other ignition source readyOperation Maintenance Burnpot CleaningFeeder Chamber Fig To remove the feeder coverOpen Ash Door Remove Ash PanCleaning Steps Combustion Blower Cleaning Fuel TroubleshootingHelpful Hints Atmospheric Conversion Pb105 #8 Ash base Assembly Pb105 #28 Feeder Assembly Stocked at depot Electrical 120 VAC 60 Hz SpecificationsBTU Input Range= 0, and 9350 to 113,900 Diagram Pellet Boiler Wiring DiagramPower Failure Backup Supply Testing Label Exceeding -.9 in Water Column / -224PaService Record / Notes Service Record / Notes Proudly Printed On 100% Recycled Paper Quick Reference Auto-Light