Harman Stove Company PB 105 manual Assembly, Boiler Kit Materials Refer to

Page 6

Assembly

Boiler Kit Materials: (Refer to page 3)

List of items contained within the boiler kit shipped with the unit.

1 - Control board cover

1 - Access cover (Hopper Swing Plate Knob)

5 - Spring Handles

1 - 1/2” Boiler Drain

1 - 3/4” Safety Relief Valve

1 - 1/2” Aquastat Well

1 - 1/2” Dual Temperature/Pressure Gauge

1 - 100ft. Sensor Cable (Outdoor Air Sensor)

1 - Outdoor Air Sensor

1 - Flue Tunnel Weldment

1 - Combustion Blower Assembly

1 - Heat Shield (Comb. Blower)

2 - UY Connectors

2 - Terminals 1/4 Female

1 - #8 X 1/2” TEK

3 - 1/4-20 X 5/8” Wing Screw

4 - 1/4” Lock Washer

4 - 1/4-20 Nuts

Installation of the Flue Tunnel Weldment,

Combustion Blower and Wiring, ESP and Heat

Shield:

Step 1: First install the flue tunnel weldment by aligning the (4) studs with the (4) holes in the ash chamber base. Fasten the (4) nuts and lock washers provided, to the studs by removing the access cover on the secondary ash chamber.

Step 2: Place the combustion motor onto the flue tunnel weldment and tighten the (3) wing screws provided. Step 3: Insert the Exhaust Sensing Probe (ESP) into the 1/8” hole provided on the flue pipe stub. Fasten with the (1) #8x1/2” TEK screw also provided. ESP will be taped to the sheet metal jacket for shipping purposes. Step 4: Connect the flex conduit 90 degree elbow(Not Shown) to the heat shield in the hole provided. Then connect the (3) wires from the combustion blower with the (3) wires in the flex conduit by using the push-on connectors and matching the wire colors as follows: Red to Black, White to White and Green to Green. Step 5: Place Heat Shield over combustion blower and align the swell latches with the holes in the sheet metal

and tighten.

Flue Tunnel Weldment

ESP

Combustion Blower

Heat Shield

NOTE: Refer to Fig’s 22, 23, and 24 located on page 33 of this manual.

6

Image 6
Contents Installation & Operating Manual Harman PB 105 Pellet BoilerPage Parts Locations Introduction Report # 135-S-16-6Warranty Harman Central Heating Products Limited WarrantyAssembly Boiler Kit Materials Refer toDesign Installation is to be Performed by a Qualified Installer Venting Venting Ventingti g VentingVenting Installation Keep combustibles away From flue outletOutside Air Main Wiring Installation InstallingInstallationDuct Installing Duct/AirInstallationConditioning Installation Example of Typical Tankless Domestic HOT Water PipingUnion AIR Vent Installation Over Heat Safety Zone Power Failure / Heat Dissipation LoopDraft Test Procedure TestFuel Specifications Fuel and Fuel StorageOperation Status LightSetting The Boiler Temperature Without the Outdoor Air Temperature Sensor InstalledPellet Boiler Outdoor Air Reset Operation Turn Mode Selector to OFF Starting a Fire AutomaticallyFlip the Igniter Switch up into the Auto position MAX. TempLighting a Fire Manually Have matches or other ignition source readyOperation Feeder Chamber Fig MaintenanceBurnpot Cleaning To remove the feeder coverOpen Ash Door Remove Ash PanCleaning Steps Combustion Blower Cleaning Troubleshooting Helpful HintsFuel Atmospheric Conversion Pb105 #8 Ash base Assembly Pb105 #28 Feeder Assembly Stocked at depot Specifications BTU Input Range= 0, and 9350 to 113,900Electrical 120 VAC 60 Hz Diagram Pellet Boiler Wiring DiagramPower Failure Backup Supply Testing Label Exceeding -.9 in Water Column / -224PaService Record / Notes Service Record / Notes Proudly Printed On 100% Recycled Paper Quick Reference Auto-Light