Harman Stove Company PB 105 manual Power Failure Backup Supply

Page 43

4" SQUARE JUNCTION BOX

 

 

120 VAC power (by installer)

 

 

 

 

3/8"FLEX CONDUIT

 

 

 

 

 

 

 

from control board

“105 Series” PELLET BOILER

UPS BACKUP FOR COMBUSTION MOTOR

( UNINTERUPTED POWER SUPPLY / BATTERY BACK-UP )

3/8"FLEX CONDUIT

to combustion motor

BLACK

WHITE

WHITE

GREEN/YELLOW

GREEN

WHITE

RED

BROWN

WHITE

GREEN

WHITE

WHITE

DARK BLUE

1/2" CONDUIT

RED

BLACK

WHITE

RED

RED

GREEN

RED

RED

 

GREEN

Relay enclosure box -

GRAINGER # 1EGH7

 

 

 

 

 

 

 

 

 

 

 

If using a standard UPS, it should

 

 

 

 

 

 

 

 

 

 

 

be rated at 650 or higher to

 

 

 

 

 

 

 

 

 

 

 

ensure that the combustion motor

 

 

 

 

 

 

 

 

 

 

 

operates until the fire is out.

 

 

 

 

 

 

 

 

 

 

 

( approximately 20 minutes needed )

 

 

 

 

 

 

 

 

 

 

 

 

CORD CONNECTOR

 

 

 

 

 

 

 

 

 

 

 

 

16-3 AWG

 

 

 

 

 

 

 

 

 

 

 

 

PVC CORD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

POWER TO THE UPS / Plug UPS into here.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GREEN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

When current is present, will keep UPS in

 

 

 

 

 

 

 

 

 

 

 

BLACK

 

 

 

 

Ready mode.

 

 

 

 

 

 

 

 

 

 

 

WHITE

 

 

 

 

FEMALE

 

 

 

 

 

 

 

WHITE

 

 

WHITE

 

 

 

 

 

8

 

 

 

 

7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

These cord tails can be made from an inexpensive 16/3 extension cord.

 

 

4

 

3

 

 

 

 

 

 

 

Make sure that the MALE end is long enough to reach the

 

 

 

 

 

 

 

 

 

 

receptacle on the UPS.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6

 

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

1

 

 

 

 

 

 

WHITE

 

 

 

 

MALE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BLACK

 

 

 

 

POWER FROM THE UPS / This plugs

 

 

 

 

 

 

 

 

 

 

GREEN

 

 

 

 

into the UPS. When power fails, UPS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

will supply current to the relay.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

16-3 AWG

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PVC CORD

Power Failure Backup Supply

DPDT RELAY flange mtd. -

 

GRAINGER # 2XCO2

CORD CONNECTOR

 

43

Image 43
Contents Harman PB 105 Pellet Boiler Installation & Operating ManualPage Parts Locations Report # 135-S-16-6 IntroductionHarman Central Heating Products Limited Warranty WarrantyBoiler Kit Materials Refer to AssemblyDesign Installation is to be Performed by a Qualified Installer Venting Venting Venting Ventingti gKeep combustibles away From flue outlet Venting InstallationOutside Air Main Wiring Installation InstallingInstallationDuct Installing Duct/AirInstallationConditioning Example of Typical Tankless Domestic HOT Water Piping InstallationUnion AIR Vent Installation Power Failure / Heat Dissipation Loop Over Heat Safety ZoneTest Draft Test ProcedureFuel and Fuel Storage Fuel SpecificationsStatus Light OperationWithout the Outdoor Air Temperature Sensor Installed Setting The Boiler TemperaturePellet Boiler Outdoor Air Reset Operation Starting a Fire Automatically Turn Mode Selector to OFFMAX. Temp Flip the Igniter Switch up into the Auto positionHave matches or other ignition source ready Lighting a Fire ManuallyOperation To remove the feeder cover MaintenanceBurnpot Cleaning Feeder Chamber FigRemove Ash Pan Open Ash DoorCleaning Steps Combustion Blower Cleaning Helpful Hints TroubleshootingFuel Atmospheric Conversion Pb105 #8 Ash base Assembly Pb105 #28 Feeder Assembly Stocked at depot BTU Input Range= 0, and 9350 to 113,900 SpecificationsElectrical 120 VAC 60 Hz Pellet Boiler Wiring Diagram DiagramPower Failure Backup Supply Exceeding -.9 in Water Column / -224Pa Testing LabelService Record / Notes Service Record / Notes Proudly Printed On 100% Recycled Paper Quick Reference Auto-Light