IDEAL INDUSTRIES HE18, HE24, HE12, HE15 manual Condensate Pipe Termination Configurations

Page 21

INSTALLATION

25CONDENSATE PIPE TERMINATION CONFIGURATIONS . . . continued

3.INTERNAL CONNECTION TO SOIL AND VENT STACK

Termination into a down pipe can take place providing it can be confirmed that the down pipe is part of a combined waste and rain water system.

* Make connection to SVP using a solvent welded saddle

BOILER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Air Break

cla9253

4. TERMINATION TO SOAK AWAY

External

 

 

wall

BOILER

 

Termination

 

to Soak away

cla7774

 

 

 

minimum

Ground Level

 

 

 

500mm

 

INSTALLATION

5. TERMINATION TO DRAIN / GULLEY

External wall

BOILER

cla7775

DRAIN

Open end of pipe direct into gulley below grating but above water level

Ground Level

icos - Installation & Servicing

21

Image 21
Contents Installation and servicing Icos Installation & Servicing 15, Frame 11 Unpacking 15, Frame 12 Packaging Removal17, Frame 16 Wall Mounting Template Key to symbols GeneralBoiler Data Boiler Size HE 12, HE 15, HE 18, HE Icos General Boiler Water Connections Rear Flue onlySide Flue only General Introduction SafetyOperation Safe HandlingGeneral Safe Handling of Substances Flue InstallationLocation of Boiler GAS SupplyAIR Supply TerminalWater Circulation System Boiler Control InterlocksSchematic Pipework and System Balancing General Open Vent System RequirementsBalancing Sealed System Requirements Safety ValveGeneral Pressure GaugeSealed System Requirements Icos boiler range have an Aluminium alloy heat exchanger Water TreatmentBoiler Assembly Exploded view InstallationUnpack and check the contents Pack a Contents Installation UnpackingPack Contents Packaging RemovalInstallation Front and Bottom Panel Removal Determining the Flue Length and Flue Packs RequiredFlue Kits Wall Mounting Template Flue Assembly Exploded ViewSetting the Flue Rear Installation Preparing the WallSetting the Flue Side Wall thicknesses of 210 to 435mmFlue Extension Ducts Pack D Flue extension duct kit contentsFitting the KIT General arrangementInstallation Condensate Drain Condensate Pipe Termination ConfigurationsFront View Condensate Pipe Termination Configurations Installation Mounting the Boiler Connecting the Flue to the BoilerFlues over 1 metre long Flue Outlet Roof Flue KIT Contents / OptionsInstallation Flue Terminal Position Terminal Position Minimum DimensionFlat roof with structure Installation Flue Arrangement Gaskets in the Boiler Flue Outletare Correctly Fitted Installation Assembling the Roof Flue KITElectrical Connections Installation GAS ConnectionIncoming mains wiring detail Installation Internal WiringMains Connector Socket Supplied in hardware pack Fixed to boilerFunctional Flow Wiring Diagram Installation Pictorial Wiring DiagramCommissioning and Testing Installation External Electrical ControlsElectrical Installation GAS Installation Room ThermostatFascia Installation Initial LightingWater Circulation System Knob Setting Flow Temperature Installation General ChecksHanding Over Central HeatingServicing Servicing Schedule Boiler Front Panel RemovalBoiler Sealing PANEL/ Bottom Panel Removal Burner Removal and Cleaning Servicing FAN and Venturi Assembly Removal and CleaningCleaning the Heat Exchanger Servicing Cleaning the Condensate S TrapReassembly Reassemble the boiler in the following orderServicing Replacement of Components When replacing ANY componentGeneral Burner Replacement Servicing FAN ReplacementRefer to Frame Remove the boiler front and sealingFlame Detection Electrode Replacement Servicing Ignition Electrode ReplacementServicing Spark Generator Replacement Burner Injector ReplacementGAS Control Valve Replacement Servicing Control BOX Replacement Mains Switch ReplacementTo change the user control only Flue Thermistor Replacement Servicing Overheat Thermostat ReplacementServicing Combustion Chamber Insulation Replacement Servicing Heat Exchanger Replacement Condensate S Trap Replacement Servicing Boiler Sealing Panel Seal ReplacementFault Finding Fault Finding Chart Main Menu Alternating H nAlternating H E GO to Frame Alternating H9 Alternating L9 Flame Error Fault FindingBoard Error 70 L.....F73 L....8..... FAN Error Overheat ErrorFlow Thermistor Error 72 L.......A76 H.....4...... Flue Thermistor Error Flame Detection Short Circuit ErrorPhase Reversal Error 75 H......FGC Part No Description Qty Product No Short List of PartsBoiler Casing Assembly Burner Assembly List of Parts Controls AssemblyIcos Installation & Servicing Installer Notification Guidelines Page Page Certified Product Technical TrainingUsers guide Minimum Clearances To light the boiler Refer to FrameOperation Knob Setting Flow Temperature Minimum Maximum 180 For short periodsFor longer periods Points for the Boiler User Problem Solution
Related manuals
Manual 52 pages 43.45 Kb

HE12, HE15, HE18, HE24 specifications

The IDEAL INDUSTRIES HE series, comprising the HE24, HE18, HE15, and HE12 models, represents a significant advancement in the field of electrical testing and measurement tools. These versatile testers stand out in professional environments for their high accuracy, user-friendly interfaces, and advanced features designed to enhance efficiency and reliability in electrical inspections.

The HE24 is the flagship model, boasting an extensive range of functionalities. It includes advanced digital multimeter capabilities, allowing for precise measurements of voltage, current, and resistance. Its True RMS feature ensures accurate readings, even with non-linear loads. The HE24 also incorporates advanced connectivity options, including Bluetooth technology, enabling users to transfer data wirelessly to smartphones or tablets for further analysis. The large, backlit display enhances visibility in various lighting conditions, making it an ideal tool for both indoor and outdoor use.

The HE18 model, while slightly more streamlined than the HE24, still offers robust capabilities. It features multiple testing modes, including continuity and diode testing, catering to a wide range of electrical tasks. The HE18 also utilizes a user-friendly interface, allowing technicians to navigate easily through various functions. Equipped with a protective rubber housing, this model is durable and built to withstand the rigors of frequent use on job sites.

The HE15 and HE12 models represent the compact, entry-level offerings in the HE series. Designed for the budget-conscious user, these models retain essential functionalities such as basic voltage and current measuring capabilities while prioritizing ease of use. The HE15 includes a simple LED indicator to signal when measurements are being taken, promoting straightforward operation. Additionally, the HE12 features a lightweight design, making it the perfect tool for on-the-go technicians.

All models in the IDEAL INDUSTRIES HE series are engineered with safety in mind, adhering to stringent international testing standards. They provide superior insulation resistance and a high degree of accuracy, mitigating the risks associated with electrical work. Furthermore, their IP-rated enclosures ensure protection against dust and moisture, enhancing longevity.

In conclusion, the IDEAL INDUSTRIES HE24, HE18, HE15, and HE12 series represent a comprehensive range of electrical testing tools that cater to professionals' varied needs. With their combination of advanced features, user-friendly designs, and safety compliance, these models are excellent choices for any electrical technician aiming for accuracy and efficiency in their work.