IDEAL INDUSTRIES HE15, HE24 Knob Setting Flow Temperature Minimum Maximum 180, For short periods

Page 59

Control of water temperature

The boiler controls the central heating radiator temperature to a maximum of 820C, adjustable via the CH thermostat knob (C).

Approx CH flow temperatures for the boiler thermostat settings are:

Knob Setting

Flow Temperature

 

o C

oF

Minimum

30

86

Maximum

82

180

 

 

 

Boiler Overheat Thermostat

This thermostat will shut down the boiler in the event of overheating. Should this occur a fault code 'L' 'A' will be displayed. Press the reset button (D) and the boiler will relight. If the fault recurs turn off the boiler and consult a CORGI registered installer or in IE a competent person.

Flame failure

Should this occur a fault code L-Fwill be displayed. Press the reset button and the boiler will relight. If the fault recurs, turn off the boiler and consult a CORGI registered installer or in IE a competent person.

To shut down the boiler

1.For short periods

Set the mains on/off switch (A) to OFF.

2.For longer periods

Set the mains on/off switch (A) to OFF. Switch the electricity supply to OFF. For longer periods the entire system should be drained, inlcuding the domestic hot water supply.

Condensate Drain

The condensate drain must not be modified or blocked.

Blockage of the condensate drain, caused by debris or freezing, can cause automatic shutdown of the boiler.

If freezing is suspected and the pipe run is accessible an attempt may be made to free the obstruction by pouring hot water over the exposed pipe and clearing any blockage from the end of the pipe. If this fails to remedy the problem the assistance of a CORGI registered installer or in IE a competent person should be sought.

To relight the boiler

Repeat the procedure detailed in 'To light the boiler'.

Frost Protection

If no frost protection is provided and frost is likely during a short absence from home leave the heating controls (if fitted) at a reduced temperature setting.

For longer periods the entire system should be drained.

If the system includes a frost thermostat then,during cold weather, the boiler should be turned OFF at the time switch (if fitted) ONLY. The mains supply should be left switched ON, with the boiler thermostat left in the normal running position.

Escape of gas

Should a gas leak or fault be suspected contact your local gas supplier without delay.

Do NOT search for gas leaks with a naked flame.

Cleaning

For normal cleaning simply dust with a dry cloth.

To remove stubborn marks and stains use a damp cloth and mild detergent.

DO NOT use abrasive cleaning materials.

Maintenance

The appliance should be serviced at least once a year by a CORGI registered installer or in IE a competent person.

1 BOILER CONTROLS

Legend

ABoiler on/off switch

C CH thermostat knob

D Reset button

E LED

F Display

G Condensate drain

CAUTION. To avoid the possibility of injury during the installation, servicing or cleaning of this appliance care should be taken when handling edges of sheet steel components.

icos - Users

3

Image 59
Contents Installation and servicing Icos Installation & Servicing 17, Frame 16 Wall Mounting Template 15, Frame 11 Unpacking15, Frame 12 Packaging Removal Boiler Data Boiler Size HE 12, HE 15, HE 18, HE Key to symbolsGeneral Icos Side Flue only General Boiler Water ConnectionsRear Flue only Safe Handling SafetyGeneral Introduction OperationGAS Supply Flue InstallationGeneral Safe Handling of Substances Location of BoilerBoiler Control Interlocks TerminalAIR Supply Water Circulation SystemBalancing Schematic Pipework and System BalancingGeneral Open Vent System Requirements Pressure Gauge Safety ValveSealed System Requirements GeneralSealed System Requirements Icos boiler range have an Aluminium alloy heat exchanger Water TreatmentBoiler Assembly Exploded view InstallationPackaging Removal Installation UnpackingUnpack and check the contents Pack a Contents Pack ContentsFlue Kits Installation Front and Bottom Panel RemovalDetermining the Flue Length and Flue Packs Required Wall Mounting Template Flue Assembly Exploded ViewWall thicknesses of 210 to 435mm Installation Preparing the WallSetting the Flue Rear Setting the Flue SideGeneral arrangement Pack D Flue extension duct kit contentsFlue Extension Ducts Fitting the KITFront View Installation Condensate DrainCondensate Pipe Termination Configurations Condensate Pipe Termination Configurations Flues over 1 metre long Installation Mounting the BoilerConnecting the Flue to the Boiler Flue Outlet Roof Flue KIT Contents / OptionsFlat roof with structure Installation Flue Terminal PositionTerminal Position Minimum Dimension Installation Flue Arrangement Gaskets in the Boiler Flue Outletare Correctly Fitted Installation Assembling the Roof Flue KITElectrical Connections Installation GAS ConnectionSupplied in hardware pack Fixed to boiler Installation Internal WiringIncoming mains wiring detail Mains Connector SocketFunctional Flow Wiring Diagram Installation Pictorial Wiring DiagramRoom Thermostat Installation External Electrical ControlsCommissioning and Testing Electrical Installation GAS InstallationFascia Installation Initial LightingCentral Heating Installation General ChecksWater Circulation System Knob Setting Flow Temperature Handing OverBoiler Sealing PANEL/ Bottom Panel Removal Servicing Servicing ScheduleBoiler Front Panel Removal Burner Removal and Cleaning Servicing FAN and Venturi Assembly Removal and CleaningReassemble the boiler in the following order Servicing Cleaning the Condensate S TrapCleaning the Heat Exchanger ReassemblyGeneral Servicing Replacement of ComponentsWhen replacing ANY component Remove the boiler front and sealing Servicing FAN ReplacementBurner Replacement Refer to FrameFlame Detection Electrode Replacement Servicing Ignition Electrode ReplacementGAS Control Valve Replacement Servicing Spark Generator ReplacementBurner Injector Replacement To change the user control only Servicing Control BOX ReplacementMains Switch Replacement Flue Thermistor Replacement Servicing Overheat Thermostat ReplacementServicing Combustion Chamber Insulation Replacement Servicing Heat Exchanger Replacement Condensate S Trap Replacement Servicing Boiler Sealing Panel Seal ReplacementAlternating H E GO to Frame Alternating H9 Alternating L9 Fault Finding Fault Finding Chart Main MenuAlternating H n 70 L.....F Fault FindingFlame Error Board Error72 L.......A Overheat Error73 L....8..... FAN Error Flow Thermistor Error75 H......F Flame Detection Short Circuit Error76 H.....4...... Flue Thermistor Error Phase Reversal ErrorGC Part No Description Qty Product No Short List of PartsBoiler Casing Assembly Burner Assembly List of Parts Controls AssemblyIcos Installation & Servicing Installer Notification Guidelines Page Page Certified Product Technical TrainingUsers guide Operation Minimum ClearancesTo light the boiler Refer to Frame For longer periods Knob Setting Flow Temperature Minimum Maximum 180For short periods Points for the Boiler User Problem Solution
Related manuals
Manual 52 pages 43.45 Kb

HE12, HE15, HE18, HE24 specifications

The IDEAL INDUSTRIES HE series, comprising the HE24, HE18, HE15, and HE12 models, represents a significant advancement in the field of electrical testing and measurement tools. These versatile testers stand out in professional environments for their high accuracy, user-friendly interfaces, and advanced features designed to enhance efficiency and reliability in electrical inspections.

The HE24 is the flagship model, boasting an extensive range of functionalities. It includes advanced digital multimeter capabilities, allowing for precise measurements of voltage, current, and resistance. Its True RMS feature ensures accurate readings, even with non-linear loads. The HE24 also incorporates advanced connectivity options, including Bluetooth technology, enabling users to transfer data wirelessly to smartphones or tablets for further analysis. The large, backlit display enhances visibility in various lighting conditions, making it an ideal tool for both indoor and outdoor use.

The HE18 model, while slightly more streamlined than the HE24, still offers robust capabilities. It features multiple testing modes, including continuity and diode testing, catering to a wide range of electrical tasks. The HE18 also utilizes a user-friendly interface, allowing technicians to navigate easily through various functions. Equipped with a protective rubber housing, this model is durable and built to withstand the rigors of frequent use on job sites.

The HE15 and HE12 models represent the compact, entry-level offerings in the HE series. Designed for the budget-conscious user, these models retain essential functionalities such as basic voltage and current measuring capabilities while prioritizing ease of use. The HE15 includes a simple LED indicator to signal when measurements are being taken, promoting straightforward operation. Additionally, the HE12 features a lightweight design, making it the perfect tool for on-the-go technicians.

All models in the IDEAL INDUSTRIES HE series are engineered with safety in mind, adhering to stringent international testing standards. They provide superior insulation resistance and a high degree of accuracy, mitigating the risks associated with electrical work. Furthermore, their IP-rated enclosures ensure protection against dust and moisture, enhancing longevity.

In conclusion, the IDEAL INDUSTRIES HE24, HE18, HE15, and HE12 series represent a comprehensive range of electrical testing tools that cater to professionals' varied needs. With their combination of advanced features, user-friendly designs, and safety compliance, these models are excellent choices for any electrical technician aiming for accuracy and efficiency in their work.