IDEAL INDUSTRIES HE15 General Introduction, Safety, Operation, Safe Handling, Optional Extra Kits

Page 7

GENERAL

INTRODUCTION

The icos range of boilers are a fully automatically controlled, wall mounted, low water content, balanced flue, fanned, condensing gas boiler. It has full modulating central heating outputs of :

HE12 9.3 kW (32,000 Btu/h) to 12.0 kW (41,000 Btu/h). HE15 8.8 kW (30,000 Btu/h) to 14.6 kW (50,000 Btu/h). HE18 8.8 kW (30,000 Btu/h) to 17.6 kW (60,000 Btu/h). HE24 8.8 kW (30,000 Btu/h) to 23.4 kW (80,000 Btu/h).

Due to the high efficiency of the boiler a plume of water vapour will form at the flue terminal during operation depending on external conditions.

The boiler casing is of white painted mild steel with the user controls capable of being mounted remotely from the boiler, if the option is required.

zPowered Vertical Flue Kit 5 m primary and 17m secondary is a typical maximum flue length. For further details refer to Powered Vertical Fluing Instructions.

zHigh Level Flue Outlet Kits

zFlue Deflector Kit

zWeather Collar

zTwin Fluing Kits (to a maximum of 60m combined total of flue and air ducts)

zHorizontal Flue 600mm long

zRemote User Control Kit

zBoiler Stand-off Kit

zSiphon Kit

zCondensate Pump Kit

The heat exchanger is of cast aluminium.

Note.

These boilers cannot be used on systems which include gravity circulation.

The boilers are suitable for connection to fully pumped, open vented or sealed water systems. Adequate arrangements for completely draining the system by provision of drain cocks MUST be provided in the installation pipework.

SAFETY

Current Gas Safety (Installation and Use) Regulations or rules in force.

The appliance is suitable only for installation in GB and IE and should be installed in accordance with the rules in force.

In GB, the installation must be carried out by a CORGI Registered Installer. It must be carried out in accordance with the relevant requirements of the:

OPERATION

When there is a demand for heat, the heating system is supplied at the selected temperature of between 30oC and 82oC.

The boiler features a comprehensive diagnostic system which gives detailed information on the boiler status when operating, and performance of key components to aid commissioning and fault finding.

SAFE HANDLING

This boiler may require 2 or more operatives to move it to its installation site, remove it from its packaging base and during movement into its installation location. Manoeuvring the boiler may include the use of a sack truck and involve lifting, pushing and pulling.

Caution should be exercised during these operations.

Operatives should be knowledgeable in handling techniques when performing these tasks and the following precautions should be considered:

Grip the boiler at the base.

Be physically capable.

Use PPE as appropriate, e.g. gloves, safety footwear.

During all manoeuvres and handling actions, every attempt should be made to ensure the following unless unavoidable and/or the weight is light.

Keep back straight.

Avoid twisting at the waist.

Avoid upper body/top heavy bending.

Always grip with the palm of the hand.

Use designated hand holds.

Keep load as close to the body as possible.

Always use assistance if required.

OPTIONAL EXTRA KITS

zFlue Extension Ducts (1000mm long up to 6m)

zFlue Finishing Kit

z90o Elbow Kit (maximum 4 elbows per installation).

z45o Elbow Kit (maximum 4 elbows per installation).

zRoof Flue Kit (to a maximum of 7.5m)

Gas Safety (Installation and Use) Regulations

The appropriate Building Regulations either The Building Regulations, The Building Regulations (Scotland), Building Regulations (northern Ireland).

The Water Fittings Regulations or Water byelaws in Scotland.

The Current I.E.E. Wiring Regulations.

Where no specific instructions are given, reference should be made to the relevant British Standard Code of Practice.

In IE, the installation must be carried out by a Competent Person and installed in accordance with the current edition of I.S.813 "Domestic Gas Installations", the current Building Regulations and reference should be made to the current ETCI rules for electrical installation.

Detailed recommendations are contained in the following British Standard Codes of Practice:

BS. 5440:1 Flues (for gas appliances of rated input not exceeding 70 kW).

BS. 5440:2 Ventilation (for gas appliances of rated input not exceeding 70 kW).

BS. 5449 Forced circulation hot water systems.

BS. 5546 Installation of gas hot water supplies for domestic purposes (2nd Family Gases).

BS. 6798 Installation of gas fired hot water boilers of rated input not exceeding 60 kW.

BS. 6891 Low pressure installation pipes.

Health & Safety Document No. 635

The Electricity at Work Regulations, 1989.

The manufacturer’s notes must NOT be taken, in any way, as overriding statutory obligations.

IMPORTANT. These appliances are CE certificated for safety and performance. It is, therefore, important that no external control devices, e.g. flue dampers, economisers etc., are directly connected to these appliances unless covered by these Installation and Servicing Instructions or as otherwise recommended by Ideal Stelrad Group in writing. If in doubt please enquire.

Any direct connection of a control device not approved by Ideal Stelrad Group may invalidate the certification and the normal appliance warranty. It could also infringe the Gas Safety Regulations and the above regulations.

icos - Installation & Servicing

7

Image 7
Contents Installation and servicing Icos Installation & Servicing 15, Frame 12 Packaging Removal 15, Frame 11 Unpacking17, Frame 16 Wall Mounting Template General Key to symbolsBoiler Data Boiler Size HE 12, HE 15, HE 18, HE Icos Rear Flue only General Boiler Water ConnectionsSide Flue only Safe Handling SafetyGeneral Introduction OperationGAS Supply Flue InstallationGeneral Safe Handling of Substances Location of BoilerBoiler Control Interlocks TerminalAIR Supply Water Circulation SystemGeneral Open Vent System Requirements Schematic Pipework and System BalancingBalancing Pressure Gauge Safety ValveSealed System Requirements GeneralSealed System Requirements Icos boiler range have an Aluminium alloy heat exchanger Water TreatmentBoiler Assembly Exploded view InstallationPackaging Removal Installation UnpackingUnpack and check the contents Pack a Contents Pack ContentsDetermining the Flue Length and Flue Packs Required Installation Front and Bottom Panel RemovalFlue Kits Wall Mounting Template Flue Assembly Exploded ViewWall thicknesses of 210 to 435mm Installation Preparing the WallSetting the Flue Rear Setting the Flue SideGeneral arrangement Pack D Flue extension duct kit contentsFlue Extension Ducts Fitting the KITCondensate Pipe Termination Configurations Installation Condensate DrainFront View Condensate Pipe Termination Configurations Connecting the Flue to the Boiler Installation Mounting the BoilerFlues over 1 metre long Flue Outlet Roof Flue KIT Contents / OptionsTerminal Position Minimum Dimension Installation Flue Terminal PositionFlat roof with structure Installation Flue Arrangement Gaskets in the Boiler Flue Outletare Correctly Fitted Installation Assembling the Roof Flue KITElectrical Connections Installation GAS ConnectionSupplied in hardware pack Fixed to boiler Installation Internal WiringIncoming mains wiring detail Mains Connector SocketFunctional Flow Wiring Diagram Installation Pictorial Wiring DiagramRoom Thermostat Installation External Electrical ControlsCommissioning and Testing Electrical Installation GAS InstallationFascia Installation Initial LightingCentral Heating Installation General ChecksWater Circulation System Knob Setting Flow Temperature Handing OverBoiler Front Panel Removal Servicing Servicing ScheduleBoiler Sealing PANEL/ Bottom Panel Removal Burner Removal and Cleaning Servicing FAN and Venturi Assembly Removal and CleaningReassemble the boiler in the following order Servicing Cleaning the Condensate S TrapCleaning the Heat Exchanger ReassemblyWhen replacing ANY component Servicing Replacement of ComponentsGeneral Remove the boiler front and sealing Servicing FAN ReplacementBurner Replacement Refer to FrameFlame Detection Electrode Replacement Servicing Ignition Electrode ReplacementBurner Injector Replacement Servicing Spark Generator ReplacementGAS Control Valve Replacement Mains Switch Replacement Servicing Control BOX ReplacementTo change the user control only Flue Thermistor Replacement Servicing Overheat Thermostat ReplacementServicing Combustion Chamber Insulation Replacement Servicing Heat Exchanger Replacement Condensate S Trap Replacement Servicing Boiler Sealing Panel Seal ReplacementAlternating H n Fault Finding Fault Finding Chart Main MenuAlternating H E GO to Frame Alternating H9 Alternating L9 70 L.....F Fault FindingFlame Error Board Error72 L.......A Overheat Error73 L....8..... FAN Error Flow Thermistor Error75 H......F Flame Detection Short Circuit Error76 H.....4...... Flue Thermistor Error Phase Reversal ErrorGC Part No Description Qty Product No Short List of PartsBoiler Casing Assembly Burner Assembly List of Parts Controls AssemblyIcos Installation & Servicing Installer Notification Guidelines Page Page Certified Product Technical TrainingUsers guide To light the boiler Refer to Frame Minimum ClearancesOperation For short periods Knob Setting Flow Temperature Minimum Maximum 180For longer periods Points for the Boiler User Problem Solution
Related manuals
Manual 52 pages 43.45 Kb

HE12, HE15, HE18, HE24 specifications

The IDEAL INDUSTRIES HE series, comprising the HE24, HE18, HE15, and HE12 models, represents a significant advancement in the field of electrical testing and measurement tools. These versatile testers stand out in professional environments for their high accuracy, user-friendly interfaces, and advanced features designed to enhance efficiency and reliability in electrical inspections.

The HE24 is the flagship model, boasting an extensive range of functionalities. It includes advanced digital multimeter capabilities, allowing for precise measurements of voltage, current, and resistance. Its True RMS feature ensures accurate readings, even with non-linear loads. The HE24 also incorporates advanced connectivity options, including Bluetooth technology, enabling users to transfer data wirelessly to smartphones or tablets for further analysis. The large, backlit display enhances visibility in various lighting conditions, making it an ideal tool for both indoor and outdoor use.

The HE18 model, while slightly more streamlined than the HE24, still offers robust capabilities. It features multiple testing modes, including continuity and diode testing, catering to a wide range of electrical tasks. The HE18 also utilizes a user-friendly interface, allowing technicians to navigate easily through various functions. Equipped with a protective rubber housing, this model is durable and built to withstand the rigors of frequent use on job sites.

The HE15 and HE12 models represent the compact, entry-level offerings in the HE series. Designed for the budget-conscious user, these models retain essential functionalities such as basic voltage and current measuring capabilities while prioritizing ease of use. The HE15 includes a simple LED indicator to signal when measurements are being taken, promoting straightforward operation. Additionally, the HE12 features a lightweight design, making it the perfect tool for on-the-go technicians.

All models in the IDEAL INDUSTRIES HE series are engineered with safety in mind, adhering to stringent international testing standards. They provide superior insulation resistance and a high degree of accuracy, mitigating the risks associated with electrical work. Furthermore, their IP-rated enclosures ensure protection against dust and moisture, enhancing longevity.

In conclusion, the IDEAL INDUSTRIES HE24, HE18, HE15, and HE12 series represent a comprehensive range of electrical testing tools that cater to professionals' varied needs. With their combination of advanced features, user-friendly designs, and safety compliance, these models are excellent choices for any electrical technician aiming for accuracy and efficiency in their work.