IDEAL INDUSTRIES HE18, HE24, HE12, HE15 manual Installer Notification Guidelines

Page 53

INSTALLER NOTIFICATION GUIDELINES

IT IS A REQUIREMENT OF CORGI MEMBERSHIP TO REGISTER EVERY GAS APPLIANCE

In addition a change to Building Regulations (England and Wales) requires the installer to notify

when installing a heating appliance, as from 1st April 2005.

Install and commission

this appliance to

manufacturers' instructions

Competent Person's

SELF CERTIFICATION SCHEME

If you notify via CORGI Scheme,

CORGI will then notify the

relevant Local Authority Building

Control (LABC) scheme

on members behalf

Scheme members only:

Call CORGI on 0870 88 88 777

or log onto:

www.corgi-notify.com

within 10 days

You must ensure that the

notification number

Complete the

Benchmark Checklist

Choose

Buildings Regulations

notification route

BUILDING CONTROL

Contact your relevant Local Authority

Building Control (LABC) who

will arrange an inspection or contact a government approved inspector

LABC will record the data

and will issue a

certificate of compliance

issued by CORGI is written onto the Benchmark Checklist

CORGI will record the data and

will send a certificate of

compliance to the property

IT IS A CONDITION OF THE

MANUFACTURERS WARRANTY

THAT THE BENCHMARK

COMMISSIONING CHECKLIST IS FULLY COMPLETED AND LEFT WITH THE APPLIANCE

icos - Installation & Servicing

53

Image 53
Contents Installation and servicing Icos Installation & Servicing 17, Frame 16 Wall Mounting Template 15, Frame 11 Unpacking15, Frame 12 Packaging Removal Boiler Data Boiler Size HE 12, HE 15, HE 18, HE Key to symbolsGeneral Icos Side Flue only General Boiler Water ConnectionsRear Flue only General Introduction SafetyOperation Safe HandlingGeneral Safe Handling of Substances Flue InstallationLocation of Boiler GAS SupplyAIR Supply TerminalWater Circulation System Boiler Control InterlocksBalancing Schematic Pipework and System BalancingGeneral Open Vent System Requirements Sealed System Requirements Safety ValveGeneral Pressure GaugeSealed System Requirements Icos boiler range have an Aluminium alloy heat exchanger Water TreatmentBoiler Assembly Exploded view InstallationUnpack and check the contents Pack a Contents Installation UnpackingPack Contents Packaging RemovalFlue Kits Installation Front and Bottom Panel RemovalDetermining the Flue Length and Flue Packs Required Wall Mounting Template Flue Assembly Exploded ViewSetting the Flue Rear Installation Preparing the WallSetting the Flue Side Wall thicknesses of 210 to 435mmFlue Extension Ducts Pack D Flue extension duct kit contentsFitting the KIT General arrangementFront View Installation Condensate DrainCondensate Pipe Termination Configurations Condensate Pipe Termination Configurations Flues over 1 metre long Installation Mounting the BoilerConnecting the Flue to the Boiler Flue Outlet Roof Flue KIT Contents / OptionsFlat roof with structure Installation Flue Terminal PositionTerminal Position Minimum Dimension Installation Flue Arrangement Gaskets in the Boiler Flue Outletare Correctly Fitted Installation Assembling the Roof Flue KITElectrical Connections Installation GAS ConnectionIncoming mains wiring detail Installation Internal WiringMains Connector Socket Supplied in hardware pack Fixed to boilerFunctional Flow Wiring Diagram Installation Pictorial Wiring DiagramCommissioning and Testing Installation External Electrical ControlsElectrical Installation GAS Installation Room ThermostatFascia Installation Initial LightingWater Circulation System Knob Setting Flow Temperature Installation General ChecksHanding Over Central HeatingBoiler Sealing PANEL/ Bottom Panel Removal Servicing Servicing ScheduleBoiler Front Panel Removal Burner Removal and Cleaning Servicing FAN and Venturi Assembly Removal and CleaningCleaning the Heat Exchanger Servicing Cleaning the Condensate S TrapReassembly Reassemble the boiler in the following orderGeneral Servicing Replacement of ComponentsWhen replacing ANY component Burner Replacement Servicing FAN ReplacementRefer to Frame Remove the boiler front and sealingFlame Detection Electrode Replacement Servicing Ignition Electrode ReplacementGAS Control Valve Replacement Servicing Spark Generator ReplacementBurner Injector Replacement To change the user control only Servicing Control BOX ReplacementMains Switch Replacement Flue Thermistor Replacement Servicing Overheat Thermostat ReplacementServicing Combustion Chamber Insulation Replacement Servicing Heat Exchanger Replacement Condensate S Trap Replacement Servicing Boiler Sealing Panel Seal ReplacementAlternating H E GO to Frame Alternating H9 Alternating L9 Fault Finding Fault Finding Chart Main MenuAlternating H n Flame Error Fault FindingBoard Error 70 L.....F73 L....8..... FAN Error Overheat ErrorFlow Thermistor Error 72 L.......A76 H.....4...... Flue Thermistor Error Flame Detection Short Circuit ErrorPhase Reversal Error 75 H......FGC Part No Description Qty Product No Short List of PartsBoiler Casing Assembly Burner Assembly List of Parts Controls AssemblyIcos Installation & Servicing Installer Notification Guidelines Page Page Certified Product Technical TrainingUsers guide Operation Minimum ClearancesTo light the boiler Refer to Frame For longer periods Knob Setting Flow Temperature Minimum Maximum 180For short periods Points for the Boiler User Problem Solution
Related manuals
Manual 52 pages 43.45 Kb

HE12, HE15, HE18, HE24 specifications

The IDEAL INDUSTRIES HE series, comprising the HE24, HE18, HE15, and HE12 models, represents a significant advancement in the field of electrical testing and measurement tools. These versatile testers stand out in professional environments for their high accuracy, user-friendly interfaces, and advanced features designed to enhance efficiency and reliability in electrical inspections.

The HE24 is the flagship model, boasting an extensive range of functionalities. It includes advanced digital multimeter capabilities, allowing for precise measurements of voltage, current, and resistance. Its True RMS feature ensures accurate readings, even with non-linear loads. The HE24 also incorporates advanced connectivity options, including Bluetooth technology, enabling users to transfer data wirelessly to smartphones or tablets for further analysis. The large, backlit display enhances visibility in various lighting conditions, making it an ideal tool for both indoor and outdoor use.

The HE18 model, while slightly more streamlined than the HE24, still offers robust capabilities. It features multiple testing modes, including continuity and diode testing, catering to a wide range of electrical tasks. The HE18 also utilizes a user-friendly interface, allowing technicians to navigate easily through various functions. Equipped with a protective rubber housing, this model is durable and built to withstand the rigors of frequent use on job sites.

The HE15 and HE12 models represent the compact, entry-level offerings in the HE series. Designed for the budget-conscious user, these models retain essential functionalities such as basic voltage and current measuring capabilities while prioritizing ease of use. The HE15 includes a simple LED indicator to signal when measurements are being taken, promoting straightforward operation. Additionally, the HE12 features a lightweight design, making it the perfect tool for on-the-go technicians.

All models in the IDEAL INDUSTRIES HE series are engineered with safety in mind, adhering to stringent international testing standards. They provide superior insulation resistance and a high degree of accuracy, mitigating the risks associated with electrical work. Furthermore, their IP-rated enclosures ensure protection against dust and moisture, enhancing longevity.

In conclusion, the IDEAL INDUSTRIES HE24, HE18, HE15, and HE12 series represent a comprehensive range of electrical testing tools that cater to professionals' varied needs. With their combination of advanced features, user-friendly designs, and safety compliance, these models are excellent choices for any electrical technician aiming for accuracy and efficiency in their work.