Burnham Series 2B manual Pilot Burner, Honeywell Q327A1147

Page 39

Key

Description

Part No.

 

 

 

 

Quantity

 

 

 

 

 

No.

202

202X

203

204

205

206

207

208

209

 

210

5. Pilot Burner and Gas Valve, 24-volt Continuous Ignition, LP/Propane (1 Inch and 40mm Main Burners)

 

 

Pilot Burner, Honeywell Q327A1147

8236023

---

---

1

1

1

1

1

1

1

 

1

5A

 

 

 

 

 

 

 

 

 

 

 

 

 

Pilot Burner Assembly, Honeywell Q350A

8236105

1

1

---

---

---

---

---

---

---

 

---

 

 

 

(Includes 5B & 5F)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5B

Pilot Orifice, Honeywell 388146KR (.014")

Included

---

---

1

1

1

1

1

1

1

 

1

 

 

 

 

 

 

 

 

 

 

 

 

Pilot Orifice, Honeywell 390686-23 (.008")

with 5A

1

1

---

---

---

---

---

---

---

 

---

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5C

Adptr, 1/4"OD x 1/4" NPT Included w/5A & 5E

8236109

2

2

2

2

2

2

2

2

2

 

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5D

Pilot Tubing, 1/4" OD x 30" LG

8236122

1

1

1

1

1

1

1

---

---

 

---

 

 

 

 

 

 

 

 

 

 

 

 

 

Pilot Tubing, 1/4" OD x 40" LG

8236123

---

---

---

---

---

---

---

1

1

 

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5E

Gas Valve, Honeywell VR8200C3013

81660144

1

1

1

1

1

1

---

---

---

 

---

 

 

 

 

 

 

 

 

 

 

 

 

 

Gas Valve, Honeywell VR8300C4035

81660163

---

---

---

---

---

---

1

1

1

 

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5F

Thermocouple, 30", Honeywell Q309A

8236024

1

1

1

1

1

1

1

1

1

 

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

39

Image 39
Contents Price $3.00 Series 2 model BTable of Contents Weight Clearances Do not drop boiler. Do not bump boiler jacket against floorMinimum Clearances Equivalent Length of Fittings Specific Gravity Correction Factors for Natural GasBoiler Piping Page Page Do not use one vent damper to control two heating appliances Page Wiring Diagrams and Heat Anticipator Settings Page Safety Shutdown Sequence of Operation Page Sequence of Operation Normal Operation Wiring Schematic, Zone Valves II. Operating Instructions Top View of VR Gas Valves Yellow LED Flame Codes Instructions to PUT the Boiler in OperationGreen LED Status Codes Lighting Instructions Check Pilot Burner Flame Check GAS Input Rate to BoilerCombustion Chamber BURN-OFF Check Ignition System Safety SHUT-OFF DeviceIII. Trouble Shooting IV. Service Pilot Burner Location Burner 40mm BurnerAvoid Breathing Fiber Particulates and Dust Section Assembly Gravity Circulation Only Repair PartsCanopy Group Section Assembly and Canopy GroupThis page Left Intentionally Blank Base Assembly USS Manifold and Main Burners Inch Main Burners Manifold and Main Burners 1 Inch Main Burners Only Manifold and Main Burners 40mm Main Burners MM Main Burners Only 4B MM Main Burner, Electronic Ignition Only 4D MM Main Burner, Natural Gas, 5001-9000 Ft. USA Only MM Main Burners Only 4C MM Main Burner Manifold4D MM Main Burner, Natural Gas, 2001-5000 Ft. USA Only 4D MM Main Burner, LP Gas, 2001-5000 Ft. USA OnlyBurner Only 40mm Burner Only Pilot Burner, Honeywell Q327A1147 Pilot Burner, Honeywell Q348A1002 Jacket Assembly Jacket Assembly, CompletePage Jacket Vestibule Panel Water Trim Limit Control Transformer Continuous and Gravity Circulation Only Transformer/Relay Assembly Intermittent Circulation OnlyFlame Rollout Switch Blocked Vent SwitchDraft Hood Carton Vent DamperVent Reducer Service Record Service Record Service Record Lwco Location Wiring of Typical LwcoLimited Warranty