Burnham Series 2B manual Green LED Status Codes

Page 21

Table 7: Green LED Status Codes

Green LED

 

 

 

 

Flash Code

Indicates

Next System Action

Recommended Service Action

(X + Y)a

 

 

 

 

OFF

No “Call for Heat”

N/A

None

 

Flash Fast

Startup - Flame sense

N/A

None

 

calibration

 

 

 

 

 

Heartbeat

Normal operation

N/A

None

 

 

 

 

If system fails to light on next trial

 

5 minute Retry Delay-

 

for ignition check gas supply, pilot

 

Initiate new trial for ignition after retry

burner, spark and flame sense wir-

2

Pilot flame not detected

delay completed.

ing, flame rod contamination or out

 

during trial for ignition

 

 

of position, burner ground connec-

 

 

 

 

 

 

tion.

 

 

 

 

If system fails to light on next trial

 

Recycle- Flame failed

Initiate new trial for ignition. Flash

for ignition check gas supply, pilot

3

code will remain through the ignition

burner, flame sense wiring, flame

during run

 

trial until flame is proved.

rod contamination, burner ground

 

 

 

 

 

connection.

 

 

 

If situation self corrects within 10

Check for pilot flame. Replace gas

 

 

seconds, control returns to normal

 

Flame sensed out of

valve if pilot flame present. If no

 

4

sequence. If flame out of sequence re-

 

sequence

pilot flame, cycle “Call for Heat.”

If

 

 

mains longer than 10 seconds, control

error repeats, replace control.

 

 

 

goes to Flash code 6+4 (see below)

 

 

 

 

 

 

 

 

Check flame sense lead wire for

 

 

Flame sense leakage to

Control remains in wait mode. When

damage or shorting. Check that

 

7

the fault corrects, control resumes nor-

flame rod is in proper position.

 

ground

 

 

mal operation after a one minute delay.

Check flame rod ceramic for cracks,

 

 

 

 

 

damage or tracking.

 

 

 

Control remains in wait mode. When

Check transformer and AC line for

 

Low secondary voltage

proper input voltage to the control.

8

the fault corrects, control resumes nor-

supply- (below 15.5 Vac)

Check with full system load on the

 

 

mal operation after one minute delay.

transformer.

 

 

 

 

 

 

5 minute Retry Delay-

 

Check gas supply, pilot burner, spark

 

Initiate new trial for ignition after retry

and flame sense wiring, flame rod

6 + 2

On every third retry on

delay completed.

contamination or out of position,

 

 

same “Call for Heat”

 

 

 

burner ground connection.

 

 

 

 

 

 

On every 6th flame

5 minute retry delay, then initiate new

Check gas supply, pilot burner, flame

6 + 3

failure during run on the

sense wiring, contamination of flame

trial for ignition.

 

same “Call for Heat”

rod, burner ground connection.

 

 

 

 

 

Flame sensed out of

Control waits until flame is no longer

Check for pilot flame. Replace gas

 

sensed and then goes to soft lockout.

valve if pilot flame present. If no

 

6 + 4

sequence- longer than

 

Flash code continues. Control auto

pilot flame, cycle “Call for Heat.”

If

 

10 seconds

 

resets from soft lockout after one hour.

error repeats, replace control.

 

 

 

 

 

Soft lockout due to error

Control auto resets from soft lockout

Reset by cycling “Call for Heat.”

If

ON

detected during self

after one hour.

error repeats, replace the control

 

 

check sequences

 

 

 

 

 

aFlash Code Descriptions:

 

 

 

-Flash Fast: rapid blinking

-Heartbeat: Constant ½ second bright, ½ second dim cycles.

-A single flash code number signifies that the LED flashes X times at 2Hz, remains off for two seconds, and then repeats the sequence.

-X + Y flash codes signify that the LED flashes X times at 2Hz, remains off for two seconds, flashes Y times at 2

Hz, remains off for three seconds, and then repeats the sequence.

21

Image 21
Contents Price $3.00 Series 2 model BTable of Contents Weight Clearances Do not drop boiler. Do not bump boiler jacket against floorMinimum Clearances Equivalent Length of Fittings Specific Gravity Correction Factors for Natural GasBoiler Piping Page Page Do not use one vent damper to control two heating appliances Page Wiring Diagrams and Heat Anticipator Settings Page Safety Shutdown Sequence of Operation Page Sequence of Operation Normal Operation Wiring Schematic, Zone Valves II. Operating Instructions Top View of VR Gas Valves Yellow LED Flame Codes Instructions to PUT the Boiler in OperationGreen LED Status Codes Lighting Instructions Check Pilot Burner Flame Check GAS Input Rate to BoilerCombustion Chamber BURN-OFF Check Ignition System Safety SHUT-OFF DeviceIII. Trouble Shooting IV. Service Pilot Burner Location Burner 40mm BurnerAvoid Breathing Fiber Particulates and Dust Section Assembly Gravity Circulation Only Repair PartsCanopy Group Section Assembly and Canopy GroupThis page Left Intentionally Blank Base Assembly USS Manifold and Main Burners Inch Main Burners Manifold and Main Burners 1 Inch Main Burners Only Manifold and Main Burners 40mm Main Burners MM Main Burners Only4B MM Main Burner, Electronic Ignition Only 4D MM Main Burner, Natural Gas, 2001-5000 Ft. USA Only MM Main Burners Only 4C MM Main Burner Manifold4D MM Main Burner, LP Gas, 2001-5000 Ft. USA Only 4D MM Main Burner, Natural Gas, 5001-9000 Ft. USA OnlyBurner Only 40mm Burner Only Pilot Burner, Honeywell Q327A1147 Pilot Burner, Honeywell Q348A1002 Jacket Assembly Jacket Assembly, CompletePage Jacket Vestibule Panel Water Trim Limit Control Flame Rollout Switch Transformer/Relay Assembly Intermittent Circulation OnlyBlocked Vent Switch Transformer Continuous and Gravity Circulation OnlyDraft Hood Carton Vent DamperVent Reducer Service Record Service Record Service Record Lwco Location Wiring of Typical LwcoLimited Warranty