VI. Low Water Cut Off (LWCO)

WARNING

DO NOT ATTEMPT to cut factory wires to install an aftermarket Low Water Cut Off (LWCO). Only use connections specifically identified for Low Water Cut Off.

In all cases, follow the Low Water Cut Off (LWCO) manufacturer's instructions.

When

A low water cutoff is required to protect a hot water boiler when any connected heat distributor (radiation) is installed below the top of the hot water boiler (i.e. baseboard on the same floor level as the boiler). In addition, some jurisdictions require the use of a LWCO with a hot water boiler.

Where

The universal location for a LWCO on both gas and oil hot water boilers is above the boiler, in either the supply or return piping. The minimum safe water level of a water boiler is at the uppermost top of the boiler; that is, it must be full of water to operate safely.

What Kind

Typically, in residential applications, a probe type LWCO is used instead of a float type, due to their relative costs and the simplicity of piping for a probe LWCO.

How to Pipe

A “tee” is commonly used to connect the probe LWCO to the supply or return piping, as shown below.

LWCO Location

Select the appropriate size tee using the LWCO manufacturer’s instructions. Often, the branch connection must have a minimum diameter to prevent bridging between the probe and the tee. Also, the run of the tee must have a minimum diameter to prevent the end of the probe from touching or being located too close to the inside wall of the run of the tee.

Ideally, manual shutoff valves should be located above the LWCO and the boiler to allow for servicing. This will allow probe removal for inspection without draining the heating system. Many probe LWCO

manufacturers recommend an annual inspection of the probe.

How to Wire

LWCO’s are available in either 120 VAC or 24 VAC configurations. The 120 VAC configuration can be universally applied to both gas and oil boilers by wiring it in the line voltage service to the boiler (after the service switch, if so equipped).

The presence of water in a properly installed LWCO will cause the normally open contact of the LWCO to close, thus providing continuity of the 120 VAC service to the boiler.

It is recommended to supply power to the probe LWCO with the same line voltage boiler service as shown below.

Wiring of Typical LWCO

A 24 VAC LWCO is used primarily for gas fired boilers where a 24 volt control circuit exists within the boiler. However, a 24 VAC LWCO can only be used if the boiler manufacturer has provided piping and wiring connections and instructions to allow for this application.

How to Test

Shut off fuel supply. Lower water level until water level is BELOW the LWCO. Generate a boiler demand by turning up thermostat. Boiler should not attempt to operate. Increase the water level by filling the system. The boiler should attempt to operate once the water level is above the LWCO.

51

Image 51
Contents Price $3.00 Series 2 model BTable of Contents Weight Clearances Do not drop boiler. Do not bump boiler jacket against floorMinimum Clearances Equivalent Length of Fittings Specific Gravity Correction Factors for Natural GasBoiler Piping Page Page Do not use one vent damper to control two heating appliances Page Wiring Diagrams and Heat Anticipator Settings Page Safety Shutdown Sequence of Operation Page Sequence of Operation Normal Operation Wiring Schematic, Zone Valves II. Operating Instructions Top View of VR Gas Valves Yellow LED Flame Codes Instructions to PUT the Boiler in OperationGreen LED Status Codes Lighting Instructions Check Pilot Burner Flame Check GAS Input Rate to BoilerCombustion Chamber BURN-OFF Check Ignition System Safety SHUT-OFF DeviceIII. Trouble Shooting IV. Service Pilot Burner Location Burner 40mm BurnerAvoid Breathing Fiber Particulates and Dust Section Assembly Gravity Circulation Only Repair PartsCanopy Group Section Assembly and Canopy GroupThis page Left Intentionally Blank Base Assembly USS Manifold and Main Burners Inch Main Burners Manifold and Main Burners 1 Inch Main Burners Only Manifold and Main Burners 40mm Main Burners MM Main Burners Only4B MM Main Burner, Electronic Ignition Only 4D MM Main Burner, Natural Gas, 5001-9000 Ft. USA Only MM Main Burners Only 4C MM Main Burner Manifold4D MM Main Burner, Natural Gas, 2001-5000 Ft. USA Only 4D MM Main Burner, LP Gas, 2001-5000 Ft. USA OnlyBurner Only 40mm Burner Only Pilot Burner, Honeywell Q327A1147 Pilot Burner, Honeywell Q348A1002 Jacket Assembly Jacket Assembly, CompletePage Jacket Vestibule Panel Water Trim Limit Control Transformer Continuous and Gravity Circulation Only Transformer/Relay Assembly Intermittent Circulation OnlyFlame Rollout Switch Blocked Vent SwitchDraft Hood Carton Vent DamperVent Reducer Service Record Service Record Service Record Lwco Location Wiring of Typical LwcoLimited Warranty