Burnham Series 2B manual II. Operating Instructions

Page 18

II. Operating Instructions

Safe lighting and other performance criteria were met with the gas manifold and control assembly provided on the boiler when the boiler underwent tests specified in American National Standard for Gas-FiredLow-Pressure Steam and Hot Water Boilers, ANSI Z21.13b-1994.

1.Main burner check - Check main burners to see that they were not dislodged during shipment. Rear of burners should be in the slots in the rear of burner tray and the front of the burners should be seated completely on the orifices.

2.Initial start -

A.Fill entire heating system with water and vent air from system. Use the following procedure on a Series Loop System equipped with zone valves. (See Figure 3).

1.Close isolation valve in boiler supply piping.

2.Isolate all circuits by closing zone valves or balancing valves.

3.Attach a hose to hose bib located just below isolation valve in boiler supply piping. (Note -

Terminate hose in five gallon bucket at a suitable floor drain or outdoor area).

4.Starting with one circuit, open zone valve.

5.Open hose bib.

6.Open fill valve (Make-up water line should be located directly above isolation valve in boiler supply piping).

7.Allow water to overflow from bucket until discharge from hose is bubble free for 30 seconds.

8.Open zone valve to the second zone to be purged, then close the first. Repeat this step until all zones have been purged, but always have one zone open. At completion, open all zone valves.

9.Close hose bib, continue filling the system until the pressure gauge reads 12 psi. Close fill valve.

(Note - If make-up water line is equipped with pressure reducing valve, system will automatically fill to 12 psi. Leave globe valve open).

10.Open isolation valve in boiler supply piping.

11.Remove hose from hose bib.

B.Turn room thermostat to lowest setting.

C.Be sure that gas to pilot and main burners has been off for at least five minutes and vent damper (if used) has been in the open position.

D.Turn "OFF" the electric switch serving boiler.

E.Open valve on main gas line at meter.

F.Purge air from gas piping. This procedure will vary with equipment furnished but in all cases adequate ventilation must be provided and no smoking or open flame permitted. To determine which of the procedures outlined in succeeding paragraphs is applicable, match suffix of

Figure 17: Schematic Pilot and Gas Piping

Continuous Ignition (Standing Pilot)

Figure 18: Schematic Pilot and Gas Piping

Electronic Ignition (EI)

boiler model found on Rating Label with paragraph heading:

1.Standing Pilot Models (Suffix C):

a.Keep electric switch "OFF".

b.Open Manual Shut-off Valve upstream of Combination Gas Valve.

c.Disconnect Pilot Tubing at gas valve (Purge must not be into combustion chamber).

d.Turn Main Gas Knob on Combination Gas Valve to "Pilot" Position. Depress and hold in this position until purging is complete.

Turn Main Gas Knob to "off" position.

18

Image 18
Contents Series 2 model B Price $3.00Table of Contents Weight Do not drop boiler. Do not bump boiler jacket against floor ClearancesMinimum Clearances Equivalent Length of Fittings Specific Gravity Correction Factors for Natural GasBoiler Piping Page Page Do not use one vent damper to control two heating appliances Page Wiring Diagrams and Heat Anticipator Settings Page Safety Shutdown Sequence of Operation Page Sequence of Operation Normal Operation Wiring Schematic, Zone Valves II. Operating Instructions Top View of VR Gas Valves Instructions to PUT the Boiler in Operation Yellow LED Flame CodesGreen LED Status Codes Lighting Instructions Check GAS Input Rate to Boiler Check Pilot Burner FlameCheck Ignition System Safety SHUT-OFF Device Combustion Chamber BURN-OFFIII. Trouble Shooting IV. Service Burner 40mm Burner Pilot Burner LocationAvoid Breathing Fiber Particulates and Dust Repair Parts Section Assembly Gravity Circulation OnlySection Assembly and Canopy Group Canopy GroupThis page Left Intentionally Blank Base Assembly USS Manifold and Main Burners Inch Main Burners Manifold and Main Burners 1 Inch Main Burners Only Manifold and Main Burners 40mm Main Burners MM Main Burners Only4B MM Main Burner, Electronic Ignition Only 4D MM Main Burner, LP Gas, 2001-5000 Ft. USA Only MM Main Burners Only 4C MM Main Burner Manifold4D MM Main Burner, Natural Gas, 2001-5000 Ft. USA Only 4D MM Main Burner, Natural Gas, 5001-9000 Ft. USA OnlyBurner Only 40mm Burner Only Pilot Burner, Honeywell Q327A1147 Pilot Burner, Honeywell Q348A1002 Jacket Assembly, Complete Jacket AssemblyPage Jacket Vestibule Panel Water Trim Limit Control Blocked Vent Switch Transformer/Relay Assembly Intermittent Circulation OnlyFlame Rollout Switch Transformer Continuous and Gravity Circulation OnlyDraft Hood Carton Vent DamperVent Reducer Service Record Service Record Service Record Wiring of Typical Lwco Lwco LocationLimited Warranty