Gas-Fired Products 50, 75, 100 Ignition Module Terminal Designations 24VAC/R, Th/W, Ps/W, Gnd, Ind

Page 33

INTERNAL CONNECTION WIRING DIAGRAM — Direct Spark Ignition

CONNECTION WIRING DIAGRAM

Schéma de circuit de connexion

 

Red

 

 

 

Light

 

 

 

 

 

Air Switch

Ignition Module (Fenwal)

 

 

pressostat

Bloc d'allumage

 

 

Gas Valve

 

 

 

(W)TH

Red

Robinet à gaz

 

 

P.SW

Orange

HI

C LO

 

 

V1

Blue

 

 

NC

Amber

 

 

Lights

 

 

 

 

 

IND

Black

 

 

L1

Black

 

 

(R) 24VAC

Red

 

 

Terminal Block

 

(2-stage thermostat

TISS

connections)

(Tube Integrity

 

Safety System)

LO C HI

Terminal

Block

 

Plaque

Red

Red

 

GROUND NEUTRALL2 (hot)L1120V

 

Transformateur

 

 

bobine primaire 120ÊV

 

 

bobine secondaire 24ÊV

 

 

Red

 

Terminal

 

 

 

 

 

 

Block

Fuse 2A Fusible

 

Plaque

Red

Black

 

L1 Black

 

White

 

L2 Black

Transformer

 

(ribbed)

 

 

Primary

 

 

 

120V

 

 

 

Secondary

 

Black

 

24V

Blower

 

(ribbed)

 

 

V2Blue

GND Green

S1 Violet

HV

Flame Sensor

Violet

White

Green

Moteur

d'amorce

 

 

d'aspiration

 

 

Green

FACTORY WIRING

 

High Voltage

 

 

 

 

 

Electrode

 

Cable

 

 

 

 

 

 

Gap 1/8”

Circuit d'origine

 

 

 

 

 

 

 

FIELD WIRING

 

Haute tension

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Connexions client

 

 

 

 

 

 

 

 

Écartement

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

d'électrode

If any of the original wire as supplied with the appliance must be replaced. It must be replaced with wiring material having a temperature rating of at least

105oC. (18 AWG. - UL / CSA 600V Type TEW)

CONTINUE TO

ADDITIONAL

HEATERS

Vers les

autres

radiateurs

MONITORING LIGHTS Lampes témoins

3,2Êmm

When connecting the supply circuit to the heater, wiring material having a minimum size of 14 AWG and a temperature rating of at least 90oC shall be used.

IGNITION MODULE TERMINAL DESIGNATIONS

24VAC/R

24 VAC Supply to Module

TH/W

Thermostat Input

PS/W

Pressure Switch Input

GND

System Ground

V1

Valve Power

V2

Valve Ground

L1

120/240 VAC Input (Hot)

IND

Blower Output

NC

Alarm (if equipped)

S1

Remote Flame Sensor

NOTES:

1.If any of the original wire as supplied with the appliance must be replaced, it must be replaced with wiring material having a temperature rating of at least 105ºC. (18 Ga. CSA 600V Type TEW)

2.When connecting the supply circuit to the heater, wiring material having a minimum size of 14 AWG and a temperature rating of at least 90ºC shall be used.

 

Form #43343530

–32–

JJuly 08

Image 33
Contents Installation and Operation Instructions Table of Contents Installer Responsibility SafetyInstallation Requirements General InformationHigh Altitude For Canada onlyMinimum Clearances to Combustibles Minimum Clearances to CombustiblesPacking List SpecificationsNatural GAS Burner Package NumbersPTU 40-200 Body Package Descriptions Reflector, 4’ 11 ½’ End Reflector Accessory Package AccessoriesExhaust Hood Package Emitter Length Body Length Model Typical Layouts PTU / PTS SeriesPoisonous GAS and Soot Hazard Typical Assembly LayoutPTS Series Dimensions PTU Series Joining of Tube Sections Heater AssemblyTypical Assembly Overview PTU 40FT Shown Suspension Hazard Typical Suspension MethodsCUT Hazard Assembly of Tube SectionsMIN 8’ MAX 10’ Between Hangers Assembly of Extension SectionInserting Turbulators Ft. Turbulator Sections Adding ReflectorsAdding Optional Corner Reflector PTS only Adding Optional 90º Elbow PTS onlyAdding Optional U-BEND Reflector PTU only Adding 180U-Bend PTU onlyAttaching Burner BOX Assembly Instructions Connecting the Tiss SystemEnd View Angle Mounted Heaters only Do not USE AN Open Flame of ANY Kind to Test for Leaks GAS Connections and RegulationsKEY Dimensions and Components of the GAS Connections Instructions for Pressure Test Gauge Connection Supply PressureManifold PRESSURE- Combination GAS Valve is Factory SET GAS Control Valve Electrical ConnectionsTH/W Ignition Module Terminal Designations 24VAC/RPS/W GNDLOW Voltage 24V Thermostat Connections Multiple Heaters LOW Voltage 24V Thermostat Connections Single HeaterSingle Heater Venting Vertical Through the Roof VentingSingle Heater Venting Horizontal Through Sidewall #10 Self-Drill Vent Pipe Screws Indirect Venting Unvented Heaters Common Vent DiameterDirect Outside AIR for Combustion AIR for CombustionSide View Lighting and Shutdown InstructionsSequence of Operation Burner Component Locations Electric Shock & Explosion Hazard Cleaning and Maintenance22.0 Troubleshooting GuideForm #43343530 JJuly Replace air switch Restart Troubleshooting Yes Removal of Main Burner and Electrodes Replacing PartsAIR Switch Pressure Check Removal of GAS Valve and Manifold AssemblyIgnition Module Diagnostics Ignition System ChecksTo Check Flame Sensor Circuit Replacement Parts Guide Burner BOX Installation DataLabels/Manual 22c Description Body Components