Gas-Fired Products 40, N7/L7, 100, 150, 175, 200 manual 22.0, Troubleshooting Guide

Page 44

Form #43343530 July 08

Turn on line voltage

Does the blower

and adjust thermostat

come on?

to the highest setting.

No

Does the red

 

monitoring light come

 

on?

 

Does the LED on the

Is the black tap on the

Check the probes and

Replace air switch.

ignition module flash

air switch connected

hoses to the air switch

 

Yes once?

Yes to the upper probe? Yes

are they clear and

Yes

 

 

unobstructed?

 

22.0)

–43–

No

 

 

Is 120V at the terminal

 

Check line voltage

block in the blower?

No

circuit. Repair fault.

 

 

Yes

 

 

Is there 120V

 

Check terminals for

between ground and

 

continuity and repair.

the L1 terminal on the

No

 

module?

 

 

Yes

 

 

During start up, is

 

 

there 120V between

 

 

ground and the IND

 

 

terminal on the

 

 

module?

 

 

Yes

 

 

Disconnect the power

 

Remove any

and check the blower

 

obstructions. Repeat

wheel. Does it turn

No

start up. If motor will

freely?

 

not run. replace

 

 

motor.

Yes

 

 

Replace motor.

 

 

No

 

No

 

Check NO terminal of

 

Switch hoses on the

 

the air switch

 

pressure taps.

 

connection. Replace

 

 

 

red light.

 

 

 

 

 

Check terminals for

 

 

 

continuity at

 

 

 

transformer. If they

 

 

 

are good, replace

 

 

 

transformer.

 

 

 

No

 

Is the LED on the

 

Is there 24V between

 

ignition module

 

the inlet to the fuse

Yes

No steady ON?

No

carrier and the

 

 

ground?

 

Yes

 

 

 

Replace ignition

 

Check that red wire is

 

module.

 

connected to TH from

 

 

 

air switch terminal C.

No

 

 

Repair connection.

 

 

 

Remove jumper, air

 

 

 

switch must be open

 

 

 

circuit first for blower

 

 

 

to operate.

 

No

Clean out hoses and probes.

if fuse carrier is tight and the fuse has no continuity, replace the fuse.

No

 

 

Is there 24V on the

 

Is there 24V between

other side of the fuse

Yes

both terminals of the

carrier?

TISS and ground?

 

 

Yes

Is 120V at the terminal

 

Is there 24V between

block in the blower?

 

both terminals of the

 

Yes thermostat connection

 

 

and ground?

Yes

 

No

Replace ignition

 

Does the system have

modules.

 

a 24V individual

 

 

thermostat?

No

No

Check TISS wire for a break if it is close to the terminal repair.

Otherwise replace TISS wire.

No

 

The TISS has broken

Replace heat

continuity. Check the

exchanger tube,

first tube and reflectorYes

reflector and TISS.

is there a hole?

 

Repair or replace jumper check all wire terminals.

TROUBLESHOOTING GUIDE

Yes

 

 

Does the blower stay

Is the knob on the gas

 

on?

valve turned to the

 

 

No ON position?

Yes

No

Turn on the gas valve?

 

 

 

 

Yes

Yes

Does the LED on the

 

Is the orange wire

 

Are air switch

Repair or replace

ignition module flash

 

from PSW connected

 

terminals jumpered?

thermostat. Check

once?

No

to the NO terminal of

Yes

 

external wiring.

 

 

the air switch?

 

 

 

Yes

 

No

 

No

 

Move black light wire

 

Move orange wire to

 

Air switch is stuck in

 

to NO terminal of the

 

NO terminal. Restart

 

the closed position.

 

air switch. Restart the

 

troubleshooting.

 

Replace air switch.

 

troubleshooting.

 

 

 

 

 

Yes

 

 

 

 

 

 

 

 

Does the low fire

Is the LED on the

 

After 15 seconds

 

Are the blue wires

 

Are the black wires

Replace amber light.

amber light come on?

ignition module

 

post purge is there

 

secure in the

 

to the amber light

Restart

No

steady ON?

No

24V between V1 and

Yes

terminals and firmly

Yes

securely on the gas

Yes troubleshooting.

 

 

 

V2 ignition module

 

on the ignition

 

valve terminals?

 

 

 

 

terminals?

 

module terminals?

 

 

 

 

Yes

 

No

 

No

 

No

 

 

Replace ignition

 

Replace ignition

 

Repair connection.

 

Repair connection.

 

 

module.

 

module.

 

Restart

 

Restart

 

 

 

 

 

 

troubleshooting.

 

troubleshooting.

 

Yes

 

 

 

 

 

 

 

 

Troubleshooting

 

 

 

 

 

 

 

 

continued on the next

 

 

 

 

 

 

 

 

page.

 

 

 

 

 

 

 

 

Image 44
Contents Installation and Operation Instructions Table of Contents Safety Installer ResponsibilityInstallation Requirements General InformationFor Canada only High AltitudeMinimum Clearances to Combustibles Minimum Clearances to CombustiblesSpecifications Packing ListBurner Package Numbers Natural GASPTU 40-200 Body Package Descriptions Reflector, 4’ 11 ½’ Accessories End Reflector Accessory PackageExhaust Hood Package Typical Layouts PTU / PTS Series Emitter Length Body Length ModelTypical Assembly Layout Poisonous GAS and Soot HazardPTS Series Dimensions PTU Series Heater Assembly Joining of Tube SectionsTypical Assembly Overview PTU 40FT Shown Typical Suspension Methods Suspension HazardAssembly of Tube Sections CUT HazardAssembly of Extension Section MIN 8’ MAX 10’ Between HangersInserting Turbulators Adding Reflectors Ft. Turbulator SectionsAdding Optional 90º Elbow PTS only Adding Optional Corner Reflector PTS onlyAdding 180U-Bend PTU only Adding Optional U-BEND Reflector PTU onlyAttaching Burner BOX Assembly Connecting the Tiss System InstructionsEnd View Angle Mounted Heaters only GAS Connections and Regulations Do not USE AN Open Flame of ANY Kind to Test for LeaksKEY Dimensions and Components of the GAS Connections Manifold PRESSURE- Combination GAS Valve is Factory SET Instructions for Pressure Test Gauge ConnectionSupply Pressure Electrical Connections GAS Control ValveIgnition Module Terminal Designations 24VAC/R TH/WPS/W GNDLOW Voltage 24V Thermostat Connections Single Heater LOW Voltage 24V Thermostat Connections Multiple HeatersVenting Single Heater Venting Vertical Through the RoofSingle Heater Venting Horizontal Through Sidewall #10 Self-Drill Vent Pipe Screws Common Vent Diameter Indirect Venting Unvented HeatersAIR for Combustion Direct Outside AIR for CombustionLighting and Shutdown Instructions Side ViewSequence of Operation Burner Component Locations Cleaning and Maintenance Electric Shock & Explosion HazardTroubleshooting Guide 22.0Form #43343530 JJuly Replace air switch Restart Troubleshooting Yes Replacing Parts Removal of Main Burner and ElectrodesRemoval of GAS Valve and Manifold Assembly AIR Switch Pressure CheckTo Check Flame Sensor Circuit Ignition Module DiagnosticsIgnition System Checks Installation Data Replacement Parts Guide Burner BOXLabels/Manual 22c Body Components Description