Gas-Fired Products 40, N7/L7, 100, 150, 175 Single Heater Venting Horizontal Through Sidewall

Page 36

the flue gases, the vent pipe should be insulated and a condensation drain should be provided.

7.Minimum clearance for single-wall flue pipe to combustible material shall be 6 inches. This may be reduced when the combustible material is protected as specified in the National Fuel Gas Code or the authority having jurisdiction.

8.Single-wall metal pipe shall not originate in any unoccupied attic or concealed space and shall not pass through any attic, inside wall or concealed space, or through any floor. For the installation of a single-wall metal pipe through an exterior combustible wall, refer to latest edition of the National Fuel Gas Code or the authority having jurisdiction.

9.A venting system shall terminate at least 3 ft. above any forced air inlet located within 10 ft.

Vent Cap (Leslie VersaCap Type B)

4” Vent Pipe (vertical position)

#10 Self-Drill

ScrewsFlashing (typical)

2” (5cm) Clearance Thimble

Seal Joint

4” Vent Elbow and Annular

Space

Flue Adapter

Collar

 

 

 

 

 

 

 

 

 

 

2 ft (77cm) minimum

 

 

 

 

 

 

 

 

(when no wall or

 

 

 

 

 

 

 

parapet exists)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2 ft

(77cm)

 

 

10 ft (305cm)

 

 

 

minimum

 

 

 

 

 

 

 

 

 

 

 

 

 

 

or less

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4” Diameter

 

 

Wall or Parapet

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Vent

 

 

 

 

 

 

 

 

 

 

 

 

 

SINGLE HEATER VENTING (HORIZONTAL THROUGH SIDEWALL)

When venting the heater horizontally through a combustible outside sidewall, the same requirements listed previously for venting Vertical Through The Roof apply except as follows:

1.A vent passing through a combustible wall must pass through an approved clearance thimble (Air-Jet #4VT or Ameri-Vent #4EWT or other thimbles that are listed by a nationally recognized testing agency.

2.An approved vent cap (Breidert-Type L or equal) must be attached to the end of the vent pipe.

NOTE: To minimize problems associated with condensation in long horizontal runs, vent pipe can be insulated.

3.Use the following correction factors to obtain the equivalent length when elbows are used:

c.Subtract 10 ft. for each elbow beyond 15 ft. from the heater.

d.Subtract 15 ft. for each elbow within 15 ft. of the heater.

4.Limit to (2) 90º elbows in the vent system.

5.When venting through a sidewall, the horizontal vent pipe shall fall not less than 1/2 inch per 20 feet from the start of the vent system to the vent terminal. All portions of the vent pipe shall be supported to prevent sagging. (6’ spacing is recommended)

6.A minimum clearance of 6 inches must be maintained between the outside wall and vent cap.

7.The horizontal venting system shall not terminate:

a.Less than 4 ft. (1.2m) below, 4 ft. (1.2m) horizontally from or 1 ft. (30cm) above any door, operable window or gravity air inlet into any building. The bottom of the vent terminal shall be located at least 7 ft. (2.1m) above grade or above snow accumulation level as determined by local codes.

b.Less than 3 ft. (0.9m) from a combustion air inlet.

c.Less than 3 ft. (0.9m) from any other building opening or any gas service regulator.

d.Less than 7 ft. (2.1m) above public walkways.

e.Directly over areas where condensate or vapor could create a nuisance or hazard or be harmful to the operation of gas utility meters, regulators, relief valves, or other equipment. Building materials should be protected from flue gases and condensate.

8.In regions of the country where prevailing winds are consistently higher than 40 mph, it may be necessary to terminate the vent system above the roof level.

Form #43343530

 

July 08

–35–

Image 36
Contents Installation and Operation Instructions Table of Contents Safety Installer ResponsibilityInstallation Requirements General InformationFor Canada only High AltitudeMinimum Clearances to Combustibles Minimum Clearances to CombustiblesSpecifications Packing ListBurner Package Numbers Natural GASPTU 40-200 Body Package Descriptions Reflector, 4’ 11 ½’ Accessories End Reflector Accessory PackageExhaust Hood Package Typical Layouts PTU / PTS Series Emitter Length Body Length ModelTypical Assembly Layout Poisonous GAS and Soot HazardPTS Series Dimensions PTU Series Heater Assembly Joining of Tube SectionsTypical Assembly Overview PTU 40FT Shown Typical Suspension Methods Suspension HazardAssembly of Tube Sections CUT HazardAssembly of Extension Section MIN 8’ MAX 10’ Between HangersInserting Turbulators Adding Reflectors Ft. Turbulator SectionsAdding Optional 90º Elbow PTS only Adding Optional Corner Reflector PTS onlyAdding 180U-Bend PTU only Adding Optional U-BEND Reflector PTU onlyAttaching Burner BOX Assembly Connecting the Tiss System InstructionsEnd View Angle Mounted Heaters only GAS Connections and Regulations Do not USE AN Open Flame of ANY Kind to Test for LeaksKEY Dimensions and Components of the GAS Connections Instructions for Pressure Test Gauge Connection Supply PressureManifold PRESSURE- Combination GAS Valve is Factory SET Electrical Connections GAS Control ValveIgnition Module Terminal Designations 24VAC/R TH/WPS/W GNDLOW Voltage 24V Thermostat Connections Single Heater LOW Voltage 24V Thermostat Connections Multiple HeatersVenting Single Heater Venting Vertical Through the RoofSingle Heater Venting Horizontal Through Sidewall #10 Self-Drill Vent Pipe Screws Common Vent Diameter Indirect Venting Unvented HeatersAIR for Combustion Direct Outside AIR for CombustionLighting and Shutdown Instructions Side ViewSequence of Operation Burner Component Locations Cleaning and Maintenance Electric Shock & Explosion HazardTroubleshooting Guide 22.0Form #43343530 JJuly Replace air switch Restart Troubleshooting Yes Replacing Parts Removal of Main Burner and ElectrodesRemoval of GAS Valve and Manifold Assembly AIR Switch Pressure CheckIgnition Module Diagnostics Ignition System ChecksTo Check Flame Sensor Circuit Installation Data Replacement Parts Guide Burner BOXLabels/Manual 22c Body Components Description