B. Constructing the Appliance Chase

A chase is a vertical box-like structure built to enclose the gas appliance and/or its vent system. In cooler climates the vent should enclosed inside the chase.

NOTICE: Treatment of ceiling firestops and wall shield firestops and construction of the chase may vary with the type of building. These instructions are not substitutes for the requirements of local building codes. Therefore, you MUST check local building codes to determine the requirements to these steps.

Chases should be constructed in the manner of all out- side walls of the home to prevent cold air drafting prob- lems. The chase should not break the outside building envelope in any manner.

Walls, ceiling, base plate and cantilever floor of the chase should be insulated. Vapor and air infiltration barriers should be installed in the chase as per regional codes for the rest of the home. Additionally, in regions where cold air infiltration may be an issue, the inside surfaces may be sheetrocked and taped for maximum air tightness.

To further prevent drafts, the wall shield and ceiling fire- stops should be caulked with high temperature caulk to seal gaps. Gas line holes and other openings should be caulked with high temp caulk or stuffed with unfaced insu- lation. If the appliance is being installed on a cement slab, a layer of plywood may be placed underneath to prevent conducting cold up into the room.

C. Clearances

NOTICE: Install appliance on hard metal or wood surfaces extending full width and depth. DO NOT install directly on carpeting, vinyl, tile or any combustible material other than wood.

WARNING! Risk of Fire! Maintain specified air space clearances to appliance and vent pipe:

Insulation and other materials must be secured to prevent accidental contact.

Failure to maintain airspace may cause overheating and a fire.

1/2 in. (13 mm)

1/2 in. (13 mm)

Drywall

0 in.

Combustible flooring may be installed next to the front of the appliance.

30in.

(762 mm)

to ceiling

0 in. to level

 

of standoffs

D

B

C

A

Object

 

36 in.

 

 

 

Combustible

 

(914 mm)

 

 

 

0 in. to

 

 

 

 

 

 

 

 

floor

Figure 5.2 Clearances to Combustibles

Note: If the inside of the framed cavity is to be finished, the framing dimensions must include the finished surface. If drywall is to be attached to the rear wall, the depth must be measured from the drywall surface.

 

 

A

B

C

D

 

 

Rough

Rough

Rough

Rough

 

 

Opening

Opening

Opening

Opening

Model

 

(Width)

(Height)

(Depth)

(DVP Pipe)

CNXT4236

in.

42

38 3/4

23

10

 

 

 

 

 

 

 

mm

1067

984

584

254

CNXT4842

in.

48

38 3/4

23

10

 

 

 

 

 

 

 

mm

1219

984

584

254

18

Heatilator • Caliber CNXT Series • 4047-132 Rev U • 11/08

Image 18
Contents Direct Vent Gas Appliance Installation and OperationModels What to do if you smell gasCongratulations Homeowner Reference InformationTable of Contents Installer GuideUser Guide Finishing Appliance SetupTroubleshooting Reference MaterialsWarranty Hearth & Home Technologies Limited Warranty CONDITIONS, Exclusions & Limitation of LiabilityWarranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Gas Fireplace Safety Operating InstructionsYour Fireplace Fan Kit optional Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceLighting Instructions IPI Frequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerMaintenance Tasks-Qualified Service Technician Getting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationModel # Constructing the Appliance Chase ClearancesRough Opening Model Width Height Depth Mantel and Wall Projections MantelsMantel Legs or Wall Projections Termination Locations Vent Termination Minimum ClearancesMinimum Clearances for Termination Vent Table Key Vent Information and DiagramsApproved Pipe Use of ElbowsVent Diagrams Top Vent Horizontal TerminationOne Elbow Two 45 Elbows replacing One 90 Elbow Two ElbowsMin Max +H 2 max +H 2+H 3 max Installed Vertically Three ElbowsTop Vent Vertical Termination No Elbow12 ft 3.66 m min 60 ft 18.29 m max Rear Vent Horizontal Termination One 45 ElbowTwo Elbows Rear Vent Vertical Termination Min Ft 1.83 m max 12 ft 3.66 m min 60 ft 18.29 m max Installing Vertical Termination Baffle 17 Flat BaffleReplace the glass refer to .H Start the appliance Wall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Installing Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Convert from Top Vent to Rear VentOuter Collar, Remove Four Screws 11 Place Outer Collar on Rear of Appliance 16 Cover Plate-Replace Securing and Leveling the Appliance 20 Proper Positioning, Leveling And Securing Of AnAssemble Pipe Sections DVP Only Installing Vent PipeAttach Pipe to the Firebox Assembly Assemble Pipe Sections DVP OnlyAssemble Vent Sections SLP Only Adding Venting ComponentsAssemble Slip Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Disassemble Vent SectionsInstall Metal Roof Flashing CaulkAssemble and Install Storm Collar 17 Assembling the Storm CollarInstall RF4-8 SLP-FSInstalling Vertical Termination Cap Installing Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap InteriorGas Pressure Gas InformationFuel Conversion Gas ConnectionElectrical Service and Repair Junction Box Installation Wiring RequirementsIntellifire Ignition System Wiring Electrical InformationWSK-MLT Multifunction Wall Switch PrecautionsDetermine Location Wiring the Wall Switch Intellifire IPI Wiring DiagramInstall the Flame Solenoid Hook up the Temperature Sensor Switch for FanInstall the Remote Cover Plate Install the Cover PlateSetting Flame Height/Manifold Pressure Wall Switch Button OperationWSK-MLT Operating Instructions Service Parts List Finishing Facing MaterialAppliance Setup Log Assembly Place the RockwoolAir Shutter Setting Install Trim and/or SurroundsInstall Hood Removing Fixed Glass AssemblyTroubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Will not ignite. If the pilot Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP Vent ComponentsBEK DVP-BEK2 DVP-TVHW DVP-TRAP Horizontal Termination CapDVP-HRC-SS Effective SL-2DVP AdapterService PartsService Parts StockedIPI Valve Assembly CNXT4842 Series Log/Grate Assembly Valve Assembly Optional Components Model DescriptionContact Information