A. Vent Termination Minimum Clearances

WARNING

Fire Risk.

Maintain vent clearance to combustibles as specified.

DO NOT pack air space with insulation or other materials.

Failure to keep insulation or other materials away from vent pipe may cause overheating and fire.

 

 

Horizontal

 

 

overhang

24 in. min.

20 in.

 

(508 mm)

 

(610 mm)

Vertical

Lowest

 

wall

 

Discharge

 

Termination

Opening

 

 

 

Cap

 

 

Storm Collar

 

X

 

12

 

 

Roof

 

 

Flashing

 

Roof Pitch

 

 

is X / 12

H (min.) - Minimum height from roof to lowest discharge opening.

Roof Pitch

H (Min.) Ft.

Roof Pitch

H (Min.) Ft.

Flat to 6/12

 

1.0*

Over 11/12 to 12/12

4.0

Over 6/12 to 7/12

1.25*

Over 12/12 to 14/12

5.0

Over 7/12 to 8/12

1.5*

Over 14/12 to 16/12

6.0

Over 8/12 to 9/12

2.0*

Over 16/12 to 18/12

7.0

Over 9/12 to 10/12

2.5

Over 18/12 to 20/12

7.5

Over 10/12 to 11/12

3.25

Over 20/12 to 21/12

8.0

 

* 3 ft. minimum in snow regions

 

 

Figure 6.1 Minimum Height From Roof To Lowest Discharge Opening

A

B

 

6 in. (minimum) up to 20 in.

18 in. minimum

 

152 mm/508 mm

457 mm

 

20 in. and over

0 in. minimum

 

Gas, Wood or Fuel Oil

 

Termination Cap

 

 

 

Wall

B

(2.44 m)

Perpendicular

Minimum

 

 

DV = 20 in.

 

A *

(508 mm)

 

BV = 8 ft

 

Gas

 

 

Termination

 

 

Cap **

 

 

*If using decorative cap cover(s), this distance may need to be increased. Refer to the installation instructions supplied with the decorative cap cover.

**In a staggered installation with both gas and wood terminations, the wood termination cap must be higher than the gas termination cap.

Figure 6.2 Multiple Termination Caps

20

Heatilator • Caliber CNXT Series • 4047-132 Rev U • 11/08

Image 20
Contents Installation and Operation ModelsDirect Vent Gas Appliance What to do if you smell gasCongratulations Homeowner Reference InformationUser Guide Table of ContentsInstaller Guide Appliance Setup TroubleshootingFinishing Reference MaterialsWarranty Hearth & Home Technologies Limited Warranty CONDITIONS, Exclusions & Limitation of LiabilityWarranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Your Fireplace Gas Fireplace SafetyOperating Instructions Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Clear SpaceLighting Instructions IPI Frequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerMaintenance Tasks-Qualified Service Technician Getting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Any such action may cause a fire hazardModel # Framing and ClearancesSelecting Appliance Location Rough Opening Model Width Height Depth Constructing the Appliance ChaseClearances Mantel Legs or Wall Projections Mantel and Wall ProjectionsMantels Termination Locations Vent Termination Minimum ClearancesMinimum Clearances for Termination Vent Information and Diagrams Approved PipeVent Table Key Use of ElbowsOne Elbow Vent DiagramsTop Vent Horizontal Termination Min Max +H 2 max +H 2+H 3 max Two 45 Elbows replacing One 90 ElbowTwo Elbows Installed Vertically Three ElbowsTop Vent Vertical Termination No Elbow12 ft 3.66 m min 60 ft 18.29 m max Rear Vent Horizontal Termination One 45 ElbowTwo Elbows Rear Vent Vertical Termination Min Ft 1.83 m max 12 ft 3.66 m min 60 ft 18.29 m max Installing Vertical Termination Baffle 17 Flat BaffleReplace the glass refer to .H Start the appliance Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Installing Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Appliance Preparation Convert from Top Vent to Rear VentOuter Collar, Remove Four Screws 11 Place Outer Collar on Rear of Appliance 16 Cover Plate-Replace Securing and Leveling the Appliance 20 Proper Positioning, Leveling And Securing Of AnInstalling Vent Pipe Attach Pipe to the Firebox AssemblyAssemble Pipe Sections DVP Only Assemble Pipe Sections DVP OnlyAssemble Vent Sections SLP Only Adding Venting ComponentsAssemble Slip Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Disassemble Vent SectionsInstall Metal Roof Flashing CaulkAssemble and Install Storm Collar 17 Assembling the Storm CollarInstall RF4-8 SLP-FSHeat Shield Requirements for Horizontal Termination Installing Vertical Termination CapInstalling Decorative Wall Components SLP only Install Horizontal Termination Cap InteriorGas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Intellifire Ignition System WiringElectrical Service and Repair Junction Box Installation Electrical InformationDetermine Location WSK-MLT Multifunction Wall SwitchPrecautions Wiring the Wall Switch Intellifire IPI Wiring DiagramInstall the Flame Solenoid Hook up the Temperature Sensor Switch for FanInstall the Remote Cover Plate Install the Cover PlateWSK-MLT Operating Instructions Setting Flame Height/Manifold PressureWall Switch Button Operation Service Parts List Finishing Facing MaterialAppliance Setup Log Assembly Place the RockwoolInstall Trim and/or Surrounds Install HoodAir Shutter Setting Removing Fixed Glass AssemblyIntellifire Ignition System TroubleshootingSymptom Possible Cause Corrective Action Will not ignite. If the pilot Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP Vent ComponentsBEK DVP-BEK2 DVP-TVHW DVP-TRAP Horizontal Termination CapDVP-HRC-SS Effective SL-2DVP AdapterService PartsService Parts StockedIPI Valve Assembly CNXT4842 Series Log/Grate Assembly Valve Assembly Optional Components Model DescriptionContact Information