Hearth and Home Technologies CNXT4236ILH, CNXT4842ILT, CNXT4842IH Install Attic Insulation Shield

Page 36

D. Install Attic Insulation Shield

WARNING! Fire Risk. DO NOT allow loose materials or insulation to touch vent. Hearth & Home Technologies Inc. requires the use of an attic shield.

The National Fuel Gas Code ANSI Z223.1 and NFPA 54 requires an attic shield constructed of 26 gauge minimum metal that extends at least 2 in. (51 mm) above insulation.

Attic shields must meet specified clearance and be se- cured in place.

Flat Ceiling Installation

Remove one shield from box.

NOTICE: Cut previously installed batt insulation to make room for the attic insulation shield.

Wrap shield around pipe if pipe is already installed in area to be insulated.

Match the three holes in each side and fasten with three screws to form a tube.

Bend three tabs on the bottom of the shield outward to allow attachment to the ceiling firestop.

Bend the remaining bottom tabs inward 90° to maintain the air space between the pipe and the shield. Set the shield on the ceiling firestop and attach to the firestop.

Bend all tabs inward 90° around the top of the shield. These tabs must be used to prevent blown insulation from getting between the shield and vent pipe, and to maintain air space clearance.

Vaulted Ceiling Installation

Remove one shield from box.

NOTICE: Cut previously installed batt insulation to make room for the attic insulation shield.

Cut the attic insulation shield (if application is for vaulted ceiling), to fit your ceiling pitch. Snip cut edge to recreate 1 in. bend tabs all the way around the bottom.

Wrap shield around pipe if pipe is already installed in area to be insulated.

Match the three holes in each side and fasten with three screws to form a tube.

Bend three tabs on the bottom of the shield outward to allow attachment to the ceiling firestop.

Bend the remaining bottom tabs inward 90° to maintain the air space between the pipe and the shield. Set the shield on the ceiling firestop and attach to the firestop.

Bend all tabs inward 90° around the top of the shield. These tabs must be used to prevent blown insulation from getting between the shield and vent pipe, and to maintain air space clearance.

Bend all tabs inward

Insert 3

90° to maintain

screws

clearance and

 

 

Bend 4 tabs

prevent insulation

 

 

from falling inside

 

 

inward 90°

 

 

 

to maintain

 

 

 

clearance

Figure 8.5 Attic Insulation Shield

36

Heatilator • Caliber CNXT Series • 4047-132 Rev U • 11/08

Image 36
Contents Installation and Operation ModelsDirect Vent Gas Appliance What to do if you smell gasCongratulations Homeowner Reference InformationTable of Contents Installer GuideUser Guide Appliance Setup TroubleshootingFinishing Reference MaterialsWarranty Hearth & Home Technologies Limited Warranty CONDITIONS, Exclusions & Limitation of LiabilityWarranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Gas Fireplace Safety Operating InstructionsYour Fireplace Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Clear SpaceLighting Instructions IPI Frequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerMaintenance Tasks-Qualified Service Technician Getting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationModel # Constructing the Appliance Chase ClearancesRough Opening Model Width Height Depth Mantel and Wall Projections MantelsMantel Legs or Wall Projections Termination Locations Vent Termination Minimum ClearancesMinimum Clearances for Termination Vent Information and Diagrams Approved PipeVent Table Key Use of ElbowsVent Diagrams Top Vent Horizontal TerminationOne Elbow Two 45 Elbows replacing One 90 Elbow Two ElbowsMin Max +H 2 max +H 2+H 3 max Installed Vertically Three ElbowsTop Vent Vertical Termination No Elbow12 ft 3.66 m min 60 ft 18.29 m max Rear Vent Horizontal Termination One 45 ElbowTwo Elbows Rear Vent Vertical Termination Min Ft 1.83 m max 12 ft 3.66 m min 60 ft 18.29 m max Installing Vertical Termination Baffle 17 Flat BaffleReplace the glass refer to .H Start the appliance Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Installing Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Convert from Top Vent to Rear VentOuter Collar, Remove Four Screws 11 Place Outer Collar on Rear of Appliance 16 Cover Plate-Replace Securing and Leveling the Appliance 20 Proper Positioning, Leveling And Securing Of AnInstalling Vent Pipe Attach Pipe to the Firebox AssemblyAssemble Pipe Sections DVP Only Assemble Pipe Sections DVP OnlyAssemble Vent Sections SLP Only Adding Venting ComponentsAssemble Slip Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Disassemble Vent SectionsInstall Metal Roof Flashing CaulkAssemble and Install Storm Collar 17 Assembling the Storm CollarInstall RF4-8 SLP-FSInstalling Vertical Termination Cap Installing Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap InteriorGas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Intellifire Ignition System WiringElectrical Service and Repair Junction Box Installation Electrical InformationWSK-MLT Multifunction Wall Switch PrecautionsDetermine Location Wiring the Wall Switch Intellifire IPI Wiring DiagramInstall the Flame Solenoid Hook up the Temperature Sensor Switch for FanInstall the Remote Cover Plate Install the Cover PlateSetting Flame Height/Manifold Pressure Wall Switch Button OperationWSK-MLT Operating Instructions Service Parts List Finishing Facing MaterialAppliance Setup Log Assembly Place the RockwoolInstall Trim and/or Surrounds Install HoodAir Shutter Setting Removing Fixed Glass AssemblyTroubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Will not ignite. If the pilot Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP Vent ComponentsBEK DVP-BEK2 DVP-TVHW DVP-TRAP Horizontal Termination CapDVP-HRC-SS Effective SL-2DVP AdapterService PartsService Parts StockedIPI Valve Assembly CNXT4842 Series Log/Grate Assembly Valve Assembly Optional Components Model DescriptionContact Information