Hearth and Home Technologies CNXT4236IT, CNXT4842ILT Install Metal Roof Flashing, Caulk

Page 46

G. Install Metal Roof Flashing

Note: Skip to Section I if using the RF4-8.

See minimum vent heights for various pitched roofs (Figure 10.15) to determine the length of pipe to extend through the roof.

Slide the roof flashing over the pipe sections extending through the roof as shown in Figure 10.16.

 

 

Horizontal

 

 

overhang

24 in. min.

20 in.

 

(508 mm)

 

(610 mm)

Vertical

Lowest

 

wall

 

Discharge

 

Termination

Opening

 

 

 

Cap

 

 

Storm Collar

 

X

 

12

 

 

Roof

 

 

Flashing

 

Roof Pitch

 

 

is X / 12

H (min.) - Minimum height from roof to lowest discharge opening.

Roof Pitch

H (Min.) Ft.

Roof Pitch

H (Min.) Ft.

Flat to 6/12

 

1.0*

Over 11/12 to 12/12

4.0

Over 6/12 to 7/12

1.25*

Over 12/12 to 14/12

5.0

Over 7/12 to 8/12

1.5*

Over 14/12 to 16/12

6.0

Over 8/12 to 9/12

2.0*

Over 16/12 to 18/12

7.0

Over 9/12 to 10/12

2.5

Over 18/12 to 20/12

7.5

Over 10/12 to 11/12

3.25

Over 20/12 to 21/12

8.0

 

* 3 ft. minimum in snow regions

 

 

Figure 10.15 Minimum Height From Roof To Lowest Discharge Opening

NOTICE: Failure to properly caulk the roof flashing could cause water entry.

Caulk the gap between the roof flashing and the outside diameter of the pipe.

Caulk the perimeter of the flashing where it contacts the roof surface. See Figure 10.16.

Pipe

Caulk

Flashing

Figure 10.16

46

Heatilator • Caliber CNXT Series • 4047-132 Rev U • 11/08

Image 46
Contents Direct Vent Gas Appliance Installation and OperationModels What to do if you smell gasCongratulations Homeowner Reference InformationInstaller Guide Table of ContentsUser Guide Finishing Appliance SetupTroubleshooting Reference MaterialsWarranty Hearth & Home Technologies Limited Warranty CONDITIONS, Exclusions & Limitation of LiabilityWarranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Operating Instructions Gas Fireplace SafetyYour Fireplace Fan Kit optional Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceLighting Instructions IPI Frequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerMaintenance Tasks-Qualified Service Technician Getting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Any such action may cause a fire hazardSelecting Appliance Location Framing and ClearancesModel # Clearances Constructing the Appliance ChaseRough Opening Model Width Height Depth Mantels Mantel and Wall ProjectionsMantel Legs or Wall Projections Termination Locations Vent Termination Minimum ClearancesMinimum Clearances for Termination Vent Table Key Vent Information and DiagramsApproved Pipe Use of ElbowsTop Vent Horizontal Termination Vent DiagramsOne Elbow Two Elbows Two 45 Elbows replacing One 90 ElbowMin Max +H 2 max +H 2+H 3 max Installed Vertically Three ElbowsTop Vent Vertical Termination No Elbow12 ft 3.66 m min 60 ft 18.29 m max Rear Vent Horizontal Termination One 45 ElbowTwo Elbows Rear Vent Vertical Termination Min Ft 1.83 m max 12 ft 3.66 m min 60 ft 18.29 m max Installing Vertical Termination Baffle 17 Flat BaffleReplace the glass refer to .H Start the appliance Wall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Installing Ceiling FirestopFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Appliance Preparation Convert from Top Vent to Rear VentOuter Collar, Remove Four Screws 11 Place Outer Collar on Rear of Appliance 16 Cover Plate-Replace Securing and Leveling the Appliance 20 Proper Positioning, Leveling And Securing Of AnAssemble Pipe Sections DVP Only Installing Vent PipeAttach Pipe to the Firebox Assembly Assemble Pipe Sections DVP OnlyAssemble Vent Sections SLP Only Adding Venting ComponentsAssemble Slip Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Disassemble Vent SectionsInstall Metal Roof Flashing CaulkAssemble and Install Storm Collar 17 Assembling the Storm CollarInstall RF4-8 SLP-FSInstalling Decorative Wall Components SLP only Installing Vertical Termination CapHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap InteriorGas Pressure Gas InformationFuel Conversion Gas ConnectionElectrical Service and Repair Junction Box Installation Wiring RequirementsIntellifire Ignition System Wiring Electrical InformationPrecautions WSK-MLT Multifunction Wall SwitchDetermine Location Wiring the Wall Switch Intellifire IPI Wiring DiagramInstall the Flame Solenoid Hook up the Temperature Sensor Switch for FanInstall the Remote Cover Plate Install the Cover PlateWall Switch Button Operation Setting Flame Height/Manifold PressureWSK-MLT Operating Instructions Service Parts List Finishing Facing MaterialAppliance Setup Log Assembly Place the RockwoolAir Shutter Setting Install Trim and/or SurroundsInstall Hood Removing Fixed Glass AssemblySymptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Will not ignite. If the pilot Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP Vent ComponentsBEK DVP-BEK2 DVP-TVHW DVP-TRAP Horizontal Termination CapDVP-HRC-SS Effective SL-2DVP AdapterService PartsService Parts StockedIPI Valve Assembly CNXT4842 Series Log/Grate Assembly Valve Assembly Optional Components Model DescriptionContact Information