7 Vent Information and Diagrams

A. Approved Pipe

This appliance is approved for use with Hearth & Home Technologies DVP and/or SLP venting systems. Refer to Section 16B for vent component information.

DO NOT mix pipe, fittings or joining methods from differ- ent manufacturers.

The pipe is tested to be run inside an enclosed wall. There is no requirement for inspection openings at each joint within the wall.

WARNING! Risk of Fire or Asphyxiation. This appliance requires a separate vent. DO NOT vent to a pipe serving a separate solid fuel burning appliance.

B. Vent Table Key

The abbreviations listed in this vent table key are used in the vent diagrams.

Symbol

Description

 

 

V1

First section (closest to appliance) of vertical length

 

 

V2

Second section of vertical length

 

 

H1

First section (closest to appliance) of horizontal length

 

 

H2

Subsequent sections of horizontal length

 

 

C. Use of Elbows

Diagonal runs have both vertical and horizontal vent aspects when calculating the effects. Use the rise for the vertical aspect and the run for the horizontal aspect (see Figure 7.1).

Two 45º elbows may be used in place of one 90º elbow. On 45º runs, one foot of diagonal is equal to 8-1/2 in. (216

mm)horizontal run and 8-1/2 in. (216 mm) vertical run. A length of straight pipe is allowed between two 45º elbows (see Figure 7.1).

D. Measuring Standards

Vertical and horizontal measurements listed in the vent diagrams were made using the following standards.

Pipe measurements are shown using the effective length of pipe (see Figure 7.2).

Horizontal terminations are measured to the outside mounting surface (flange of termination cap).

Vertical terminations are measured to bottom of termination cap.

Horizontal pipe installed level with no rise.

Vertical

 

 

in.

 

 

.

1/2-8

 

12

in

 

 

 

 

 

8-1/2 in.

 

Horizontal

On 45° runs, 1 ft (.3 m) of diagonal is equal to 8-1/2 in. (216 mm) horizontal run and 8-1/2 in. (216 mm) vertical run.

Figure 7.1 Using Two 45° Elbows

 

 

 

 

 

 

 

 

Effective Height/Length

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pipe

inches

mm

 

 

 

 

 

 

 

 

DVP4

4

102

 

 

 

 

 

 

 

 

DVP6

6

152

 

 

 

 

 

 

 

 

 

 

Effective

 

 

 

 

DVP12

12

305

 

 

Height/Length

 

 

 

 

DVP24

24

610

 

 

 

 

 

 

 

 

DVP36

36

914

 

 

 

 

 

 

 

 

DVP48

48

1219

 

 

 

 

 

 

 

 

DVP6A

3 - 6

76 - 152

 

 

 

 

 

 

 

 

DVP12A

3 - 12

76 - 305

DVP Pipe

 

 

 

 

(see chart)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Effective Height/Length

 

 

 

 

 

 

 

 

Pipe

inches

mm

 

 

 

 

 

 

 

 

SLP4

4

102

 

 

Effective

 

 

 

 

 

 

SLP6

6

152

 

Height/Length

 

 

 

 

 

SLP12

12

305

 

 

 

 

 

 

 

 

SLP24

24

610

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SLP36

36

914

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SLP48

48

1219

SLP Pipe

 

SLP6A

2 - 6

51 - 152

 

SLP12A

2 - 12

51 - 305

(see chart)

 

 

 

 

 

Figure 7.2 Pipe Effective Length

22

Heatilator • Caliber CNXT Series • 4047-132 Rev U • 11/08

Image 22
Contents Direct Vent Gas Appliance Installation and OperationModels What to do if you smell gasCongratulations Homeowner Reference InformationInstaller Guide Table of ContentsUser Guide Finishing Appliance SetupTroubleshooting Reference MaterialsWarranty Hearth & Home Technologies Limited Warranty CONDITIONS, Exclusions & Limitation of LiabilityWarranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Operating Instructions Gas Fireplace SafetyYour Fireplace Fan Kit optional Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceLighting Instructions IPI Frequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerMaintenance Tasks-Qualified Service Technician Getting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Any such action may cause a fire hazardSelecting Appliance Location Framing and ClearancesModel # Clearances Constructing the Appliance ChaseRough Opening Model Width Height Depth Mantels Mantel and Wall ProjectionsMantel Legs or Wall Projections Termination Locations Vent Termination Minimum ClearancesMinimum Clearances for Termination Vent Table Key Vent Information and DiagramsApproved Pipe Use of ElbowsTop Vent Horizontal Termination Vent DiagramsOne Elbow Two Elbows Two 45 Elbows replacing One 90 ElbowMin Max +H 2 max +H 2+H 3 max Installed Vertically Three ElbowsTop Vent Vertical Termination No Elbow12 ft 3.66 m min 60 ft 18.29 m max Rear Vent Horizontal Termination One 45 ElbowTwo Elbows Rear Vent Vertical Termination Min Ft 1.83 m max 12 ft 3.66 m min 60 ft 18.29 m max Installing Vertical Termination Baffle 17 Flat BaffleReplace the glass refer to .H Start the appliance Wall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Installing Ceiling FirestopFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Appliance Preparation Convert from Top Vent to Rear VentOuter Collar, Remove Four Screws 11 Place Outer Collar on Rear of Appliance 16 Cover Plate-Replace Securing and Leveling the Appliance 20 Proper Positioning, Leveling And Securing Of AnAssemble Pipe Sections DVP Only Installing Vent PipeAttach Pipe to the Firebox Assembly Assemble Pipe Sections DVP OnlyAssemble Vent Sections SLP Only Adding Venting ComponentsAssemble Slip Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Disassemble Vent SectionsInstall Metal Roof Flashing CaulkAssemble and Install Storm Collar 17 Assembling the Storm CollarInstall RF4-8 SLP-FSInstalling Decorative Wall Components SLP only Installing Vertical Termination CapHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap InteriorGas Pressure Gas InformationFuel Conversion Gas ConnectionElectrical Service and Repair Junction Box Installation Wiring RequirementsIntellifire Ignition System Wiring Electrical InformationPrecautions WSK-MLT Multifunction Wall SwitchDetermine Location Wiring the Wall Switch Intellifire IPI Wiring DiagramInstall the Flame Solenoid Hook up the Temperature Sensor Switch for FanInstall the Remote Cover Plate Install the Cover PlateWall Switch Button Operation Setting Flame Height/Manifold PressureWSK-MLT Operating Instructions Service Parts List Finishing Facing MaterialAppliance Setup Log Assembly Place the RockwoolAir Shutter Setting Install Trim and/or SurroundsInstall Hood Removing Fixed Glass AssemblySymptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Will not ignite. If the pilot Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP Vent ComponentsBEK DVP-BEK2 DVP-TVHW DVP-TRAP Horizontal Termination CapDVP-HRC-SS Effective SL-2DVP AdapterService PartsService Parts StockedIPI Valve Assembly CNXT4842 Series Log/Grate Assembly Valve Assembly Optional Components Model DescriptionContact Information