Hearth and Home Technologies CNXT4236ILT, CNXT4842ILT, CNXT4842IH Disassemble Vent Sections

Page 45

E. Disassemble Vent Sections

 

• Use a plumb-bob to mark the center line of the venting

• Rotate either section (see Figure 10.11) so the seams

 

system on the ceiling and drill a small hole through the

 

ceiling and roof at this point. Locate the hole and mark

on both pipe sections are aligned as shown in Figure

 

 

the outline of the cathedral ceiling support box on the

10.12.

 

 

outside roof.

• Pull carefully to separate the pieces of pipe.

 

 

• Remove shingles or other roof covering as necessary

 

 

 

 

to cut the rectangular hole for the support box. Cut the

 

 

hole 1/8 in. (3 mm) larger than the support box outline.

 

 

• Lower the support box through the hole in the roof until

 

 

its bottom is at least 2 in. (51 mm) below the ceiling

 

 

(Figure 10.13).

 

 

• Level the support box both vertically and horizontally

 

 

and temporarily tack it in place through the inside walls

 

 

into the roof sheathing.

 

 

• Use tin snips to cut the support box from the top corners

 

 

down to the roof line and fold the resulting flaps to the

 

 

roof. See Figure 10.14.

 

 

• Nail the flaps to the roof AFTER running a bead of non

 

 

hardening sealant between the flaps and the roof.

 

 

WARNING! Risk of Fire! Clean out ALL materials from

 

 

inside the support box and complete the vertical vent run

Figure 10.11 Rotate Seams for Disassembly

 

and termination.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Level

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cathedral ceiling

 

 

 

 

 

 

 

support box

 

 

 

 

 

 

 

 

2 in. (51 mm)

 

 

 

 

 

 

 

 

minimum below

 

 

 

 

 

 

 

 

finished ceiling

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cut hole 1/8 in. (3 mm) greater

Figure 10.12 Align and Disassemble Vent Sections

 

 

 

 

 

 

 

 

 

in size than pattern of support

 

 

 

 

 

 

 

 

 

 

 

 

box as it is projected onto

 

 

 

 

 

 

roofline.

F. Install Decorative Ceiling Components

 

 

 

 

 

 

 

 

(SLP only)

 

Figure 10.13

 

 

A decorative ceiling thimble can be installed on a flat ceil-

 

ing through which the vent passes. The decorative ceiling

 

thimble is used to cover the firestop, which is installed

 

according to section 8.C.

 

• Seal the gap between the vent pipe and firestop

 

using high temperature silicone to prevent cold air

 

infiltration.

 

• Install the decorative ceiling thimble by sliding it up to

 

the ceiling and attaching it using the provided screws.

 

A decorative black cathedral ceiling support box can be

 

used where vertical vent runs pass through a cathedral

 

ceiling.

 

Figure 10.14

 

Heatilator • Caliber CNXT Series • 4047-132 Rev U • 11/08

45

Image 45
Contents Models Installation and OperationDirect Vent Gas Appliance What to do if you smell gasHomeowner Reference Information CongratulationsTable of Contents Installer GuideUser Guide Troubleshooting Appliance SetupFinishing Reference MaterialsCONDITIONS, Exclusions & Limitation of Liability Warranty Hearth & Home Technologies Limited WarrantyWarranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Gas Fireplace Safety Operating InstructionsYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit optional Clear SpaceLighting Instructions IPI After Fireplace is Lit Frequently Asked QuestionsMaintenance Tasks-Homeowner Maintenance and ServiceMaintenance Tasks-Qualified Service Technician Typical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationModel # Constructing the Appliance Chase ClearancesRough Opening Model Width Height Depth Mantel and Wall Projections MantelsMantel Legs or Wall Projections Vent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Approved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsVent Diagrams Top Vent Horizontal TerminationOne Elbow Two 45 Elbows replacing One 90 Elbow Two ElbowsMin Max +H 2 max +H 2+H 3 max Three Elbows Installed VerticallyNo Elbow Top Vent Vertical Termination12 ft 3.66 m min 60 ft 18.29 m max One 45 Elbow Rear Vent Horizontal TerminationTwo Elbows Rear Vent Vertical Termination Min Ft 1.83 m max 12 ft 3.66 m min 60 ft 18.29 m max 17 Flat Baffle Installing Vertical Termination BaffleReplace the glass refer to .H Start the appliance Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationInstalling Ceiling Firestop Install the Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Convert from Top Vent to Rear Vent Appliance PreparationOuter Collar, Remove Four Screws 11 Place Outer Collar on Rear of Appliance 16 Cover Plate-Replace 20 Proper Positioning, Leveling And Securing Of An Securing and Leveling the ApplianceAttach Pipe to the Firebox Assembly Installing Vent PipeAssemble Pipe Sections DVP Only Assemble Pipe Sections DVP OnlyAdding Venting Components Assemble Vent Sections SLP OnlySecure the Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling Components SLP onlyCaulk Install Metal Roof Flashing17 Assembling the Storm Collar Assemble and Install Storm CollarSLP-FS Install RF4-8Installing Vertical Termination Cap Installing Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination Interior Install Horizontal Termination CapFuel Conversion Gas InformationGas Pressure Gas ConnectionIntellifire Ignition System Wiring Wiring RequirementsElectrical Service and Repair Junction Box Installation Electrical InformationWSK-MLT Multifunction Wall Switch PrecautionsDetermine Location Intellifire IPI Wiring Diagram Wiring the Wall SwitchHook up the Temperature Sensor Switch for Fan Install the Flame SolenoidInstall the Cover Plate Install the Remote Cover PlateSetting Flame Height/Manifold Pressure Wall Switch Button OperationWSK-MLT Operating Instructions Service Parts List Facing Material FinishingAppliance Setup Place the Rockwool Log AssemblyInstall Hood Install Trim and/or SurroundsAir Shutter Setting Removing Fixed Glass AssemblyTroubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Will not ignite. If the pilot Reference Materials Appliance Dimension DiagramDVP Vent Components Vent Components DiagramsBEK DVP-BEK2 DVP-TVHW Horizontal Termination Cap DVP-TRAPDVP-HRC-SS Effective Adapter SL-2DVPParts ServiceStocked Service PartsIPI Valve Assembly CNXT4842 Series Log/Grate Assembly Valve Assembly Model Description Optional ComponentsContact Information