Hearth and Home Technologies CNXT4842ILT Installing Vertical Termination Baffle, Flat Baffle

Page 32

F. Installing Vertical Termination Baffle

Note: For vertically terminated installations only.

Note: If installing a vertical vent/termination run off the top or rear of the appliance, the vertical termination baffle supplied with the appliance may be used.

Remove the glass (refer to Section 14.H.) to access the firebox and 5 in. inner flue.

Fold the baffle (Figure 7.17) to an approximate 90° angle (see Figure 7.18).

Figure 7.17 Flat Baffle

Figure 7.18 Baffle Bent to 90° Angle

Part of the refractory must be removed before installing the vertical baffle.

-Remove the four screws holding the refractory retainers in place. See Figure 7.19.

Figure 7.19 Remove Refractory Retainers

-Remove the retainers.

-Remove the right or left side refractory (only one side must be removed) by gently raising the front of the top refractory and lifting the side piece up slightly and pulling out. See Figure 7.20.

Push & hold the

front edge up.

Figure 7.20 Remove One Side Refractory

-Remove top by gently lowering toward side just removed and gently twisting out. See Figure 7.21.

Figure 7.21 Remove Top Refractory

32

Heatilator • Caliber CNXT Series • 4047-132 Rev U • 11/08

Image 32
Contents Installation and Operation ModelsDirect Vent Gas Appliance What to do if you smell gasCongratulations Homeowner Reference InformationUser Guide Table of ContentsInstaller Guide Appliance Setup TroubleshootingFinishing Reference MaterialsWarranty Hearth & Home Technologies Limited Warranty CONDITIONS, Exclusions & Limitation of LiabilityWarranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Your Fireplace Gas Fireplace SafetyOperating Instructions Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Clear SpaceLighting Instructions IPI Frequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerMaintenance Tasks-Qualified Service Technician Getting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Any such action may cause a fire hazardModel # Framing and ClearancesSelecting Appliance Location Rough Opening Model Width Height Depth Constructing the Appliance ChaseClearances Mantel Legs or Wall Projections Mantel and Wall ProjectionsMantels Termination Locations Vent Termination Minimum ClearancesMinimum Clearances for Termination Vent Information and Diagrams Approved PipeVent Table Key Use of ElbowsOne Elbow Vent DiagramsTop Vent Horizontal Termination Min Max +H 2 max +H 2+H 3 max Two 45 Elbows replacing One 90 ElbowTwo Elbows Installed Vertically Three ElbowsTop Vent Vertical Termination No Elbow12 ft 3.66 m min 60 ft 18.29 m max Rear Vent Horizontal Termination One 45 ElbowTwo Elbows Rear Vent Vertical Termination Min Ft 1.83 m max 12 ft 3.66 m min 60 ft 18.29 m max Installing Vertical Termination Baffle 17 Flat BaffleReplace the glass refer to .H Start the appliance Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Installing Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Appliance Preparation Convert from Top Vent to Rear VentOuter Collar, Remove Four Screws 11 Place Outer Collar on Rear of Appliance 16 Cover Plate-Replace Securing and Leveling the Appliance 20 Proper Positioning, Leveling And Securing Of AnInstalling Vent Pipe Attach Pipe to the Firebox AssemblyAssemble Pipe Sections DVP Only Assemble Pipe Sections DVP OnlyAssemble Vent Sections SLP Only Adding Venting ComponentsAssemble Slip Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Disassemble Vent SectionsInstall Metal Roof Flashing CaulkAssemble and Install Storm Collar 17 Assembling the Storm CollarInstall RF4-8 SLP-FSHeat Shield Requirements for Horizontal Termination Installing Vertical Termination CapInstalling Decorative Wall Components SLP only Install Horizontal Termination Cap InteriorGas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Intellifire Ignition System WiringElectrical Service and Repair Junction Box Installation Electrical InformationDetermine Location WSK-MLT Multifunction Wall SwitchPrecautions Wiring the Wall Switch Intellifire IPI Wiring DiagramInstall the Flame Solenoid Hook up the Temperature Sensor Switch for FanInstall the Remote Cover Plate Install the Cover PlateWSK-MLT Operating Instructions Setting Flame Height/Manifold PressureWall Switch Button Operation Service Parts List Finishing Facing MaterialAppliance Setup Log Assembly Place the RockwoolInstall Trim and/or Surrounds Install HoodAir Shutter Setting Removing Fixed Glass AssemblyIntellifire Ignition System TroubleshootingSymptom Possible Cause Corrective Action Will not ignite. If the pilot Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP Vent ComponentsBEK DVP-BEK2 DVP-TVHW DVP-TRAP Horizontal Termination CapDVP-HRC-SS Effective SL-2DVP AdapterService PartsService Parts StockedIPI Valve Assembly CNXT4842 Series Log/Grate Assembly Valve Assembly Optional Components Model DescriptionContact Information