Hearth and Home Technologies CNXT4842IT, CNXT4842ILT, CNXT4842IH, CNXT4842ILH BEK DVP-BEK2

Page 67

B. Vent Components Diagrams (continued)

 

 

 

 

31 in.

 

 

 

(787 mm)

13-1/4 in.

 

24-5/8 in.

 

 

 

(625 mm)

 

 

(367 mm)

 

 

 

 

 

 

 

24-5/8 in.

27-1/2 in.

 

 

13-1/4 in.

(625 mm)

(698 mm)

 

 

 

 

(367 mm)

 

 

 

 

RF6M

 

 

RF12M

Roof Flashing Multi-pak

Roof Flashing Multi-pak

13-3/4 in.

5 in.

 

11-7/8 in.

5 in.

(349 mm)

(127 mm)

 

(302 mm)

(127 mm)

13-3/4 in.

 

13-7/8 in.

 

 

(349 mm)

 

(352 mm)

 

 

BEK

 

 

DVP-BEK2

Trap Cap Brick Extension

DVP-HPC Cap Brick Extension

 

 

11-5/8 in.

 

 

 

 

(295 mm)

 

 

 

 

7-1/8 in.

12-1/8 in.

 

 

(308 mm)

 

 

(181 mm)

 

 

 

 

 

 

5-3/4 in.

 

 

 

 

(146 mm)

 

 

 

 

 

COOL-ADD

DVP-TRAPFL

 

 

Cap Shield

 

 

 

 

Flashing

 

 

 

 

 

 

13-7/8 in.

9-1/2 in.

26 in.

 

(352 mm)

(241 mm)

 

 

 

 

(660 mm)

 

 

 

 

 

 

14 in.

 

 

 

 

(356 mm)

 

 

DVP-HSM-B

 

 

DRC-RADIUS

Extended Heat Shield

 

 

 

 

Cap Shield

 

 

 

Figure 16.3 DVP Vent Components

 

 

 

 

 

Heatilator • Caliber CNXT Series • 4047-132 Rev U • 11/08

 

67

Image 67
Contents What to do if you smell gas Installation and OperationModels Direct Vent Gas ApplianceHomeowner Reference Information CongratulationsInstaller Guide Table of ContentsUser Guide Reference Materials Appliance SetupTroubleshooting FinishingCONDITIONS, Exclusions & Limitation of Liability Warranty Hearth & Home Technologies Limited WarrantyWarranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Operating Instructions Gas Fireplace SafetyYour Fireplace Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan Kit optionalLighting Instructions IPI After Fireplace is Lit Frequently Asked QuestionsMaintenance Tasks-Homeowner Maintenance and ServiceMaintenance Tasks-Qualified Service Technician Typical Appliance System Getting StartedAny such action may cause a fire hazard Design and Installation ConsiderationsTools and Supplies Needed Inspect Appliance and ComponentsSelecting Appliance Location Framing and ClearancesModel # Clearances Constructing the Appliance ChaseRough Opening Model Width Height Depth Mantels Mantel and Wall ProjectionsMantel Legs or Wall Projections Vent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Use of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyTop Vent Horizontal Termination Vent DiagramsOne Elbow Two Elbows Two 45 Elbows replacing One 90 ElbowMin Max +H 2 max +H 2+H 3 max Three Elbows Installed VerticallyNo Elbow Top Vent Vertical Termination12 ft 3.66 m min 60 ft 18.29 m max One 45 Elbow Rear Vent Horizontal TerminationTwo Elbows Rear Vent Vertical Termination Min Ft 1.83 m max 12 ft 3.66 m min 60 ft 18.29 m max 17 Flat Baffle Installing Vertical Termination BaffleReplace the glass refer to .H Start the appliance Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingInstalling Ceiling Firestop Install the Ceiling FirestopFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Convert from Top Vent to Rear Vent Appliance PreparationOuter Collar, Remove Four Screws 11 Place Outer Collar on Rear of Appliance 16 Cover Plate-Replace 20 Proper Positioning, Leveling And Securing Of An Securing and Leveling the ApplianceAssemble Pipe Sections DVP Only Installing Vent PipeAttach Pipe to the Firebox Assembly Assemble Pipe Sections DVP OnlyAdding Venting Components Assemble Vent Sections SLP OnlySecure the Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling Components SLP onlyCaulk Install Metal Roof Flashing17 Assembling the Storm Collar Assemble and Install Storm CollarSLP-FS Install RF4-8Installing Decorative Wall Components SLP only Installing Vertical Termination CapHeat Shield Requirements for Horizontal Termination Interior Install Horizontal Termination CapGas Connection Gas InformationFuel Conversion Gas PressureElectrical Information Wiring RequirementsIntellifire Ignition System Wiring Electrical Service and Repair Junction Box InstallationPrecautions WSK-MLT Multifunction Wall SwitchDetermine Location Intellifire IPI Wiring Diagram Wiring the Wall SwitchHook up the Temperature Sensor Switch for Fan Install the Flame SolenoidInstall the Cover Plate Install the Remote Cover PlateWall Switch Button Operation Setting Flame Height/Manifold PressureWSK-MLT Operating Instructions Service Parts List Facing Material FinishingAppliance Setup Place the Rockwool Log AssemblyRemoving Fixed Glass Assembly Install Trim and/or SurroundsInstall Hood Air Shutter SettingSymptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Will not ignite. If the pilot Reference Materials Appliance Dimension DiagramDVP Vent Components Vent Components DiagramsBEK DVP-BEK2 DVP-TVHW Horizontal Termination Cap DVP-TRAPDVP-HRC-SS Effective Adapter SL-2DVPParts ServiceStocked Service PartsIPI Valve Assembly CNXT4842 Series Log/Grate Assembly Valve Assembly Model Description Optional ComponentsContact Information