Hearth and Home Technologies HUDBAY-FS owner manual RED 28 711 MM, Valve

Page 27

IGNITOR

RED 28 IN.

(711 MM)

ON/OFF

SWITCH

RED 28 IN.

(711 MM)

Figure 7.1

THERMOCOUPLE

GAS PILOT IGNITOR

THERMOPILE

PILOT ASSEMBLY

TPTHTPTH

 

ON

O

 

 

E A

 

I L

 

 

H

 

 

 

O

F

 

 

OL

 

 

P

 

 

I

 

 

 

T

 

 

P

 

 

 

O

 

 

 

I

 

 

 

L

 

 

 

T

 

 

VALVE

CAUTION

Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation. Verify proper operation after servicing.

CAUTION

Shock hazard.

Replace damaged wire with type 105O C rated wire.

Wire must have high temperature insulation.

10/08

Quadra-Fire • Hudson Bay • 7003-121 Rev. i

Page 27

Image 27 Contents
What to do if you smell gas Do not Discard this ManualDo Discardnot Welcome to the Quadra-Fire Family Table of Contents 1Listing and Code Approvals Requirements for the Commonwealth of Massachusetts BELOW. Keep Clear of ALL ObstructionsManufacturer Requirements Inspect Appliance & Components Design & Installation ConsiderationsTools will apply to every installation Getting StartedAppliance Location and Clearances Selecting Appliance LocationClearances Vent Termination Minimum Clearances 4Termination LocationsAlcove Applications Measuring Standards Vent InformationVenting Components Use of ElbowsVertical Distance from Appliance to to the 90 Elbow How to Use the Vent GraphStep Horizontal TerminationCenter Hole Line Wallcenter Thimbleline Fold Strap Here Sheet Metal Screw Vertical Termination Direct Vent PipeStep Wood Screws Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Existing Masonry Chimney Retro Connector Gas Information Fuel ConversionsConverting to LP Gas Remove pilot hood and set aside Valve Regulator ReplacementPressure Gas PressuresCheck for GAS Leaks Gas ConnectionWire Size Max. Length Recommendation for WireConnecting to the Appliance Standing Pilot Ignition System WiringValve RED 28 711 MMRemove Shipping Materials Appliance SetupAccessories Door Crown InstallationBrick Set Installation Grille Installation13 Log Set Positioning the LogsMineral Wool 23 Blower Wiring Diagram Blower InstallationDoor Frame with Glass Assembly Replacement Damper AdjustmentShutter Adjustment Glass ReplacementOperating Instructions Before Lighting ApplianceControls Lighting Appliance For Your Safety Read Before LightingFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Symptom Possible Cause Corrective Action TroubleshootingBe Placed in this Opening After servicing Maintaining and Servicing Your ApplianceNecessary. USE Caution When CLEANING/HANDLING Ceramic Burner Maintenance Tasks InspectReference Materials Appliance Dimension DiagramSLP Series Vent Components Vent Components DiagramMiscellaneous Vent Components ListRD. Service Parts List At Depot StockedDepot Valve Components Pedestal ComponentsDescription Serial # Part Number CONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Hudson Bay Direct Vent Gas Appliance Serial Number Date Purchased Date Installed Dealer Telephone