D. Grille Installation

Figure 8.5 Following instructions stated above, remove the door of appliance.

Remove the four screws (two at each end) holding the grille in place. Lift up to remove.

Install the new grille by reversing the removal instructions.

NOTE: Clean glass and gold or nickel plating with glass cleaner and a soft cloth, wiping off all fingerprints prior to first fire to prevent permanent staining.

Figure 8.7 To install the baffle, slide it in at an angle and rotate upward parallel with the firebox. Place baffle up against the heat exchangers in top of firebox. Holding against heat exchangers, slide baffle towards front of appliance.

E. Brick Set Installation

Pilot

Shield

Pilot Bracket

Figure 8.6 The pilot shield has to be removed to install or remove the brick refractory. Removal of the bracket requires removing two screws.

Figure 8.8 Keeping the baffle elevated with your free hand, put the right side brick into position. Rest the baffle on the right side brick.

Figure 8.9 Still holding the baffle in place, install the left brick into position.

10/08

Quadra-Fire • Hudson Bay • 7003-121 Rev. i

Page 29

Image 29
Contents Do Discardnot What to do if you smell gasDo not Discard this Manual Welcome to the Quadra-Fire Family Table of Contents 1Listing and Code Approvals Manufacturer Requirements Requirements for the Commonwealth of MassachusettsBELOW. Keep Clear of ALL Obstructions Tools will apply to every installation Design & Installation ConsiderationsGetting Started Inspect Appliance & ComponentsClearances Appliance Location and ClearancesSelecting Appliance Location Vent Termination Minimum Clearances 4Termination LocationsAlcove Applications Venting Components Vent InformationUse of Elbows Measuring StandardsVertical Distance from Appliance to to the 90 Elbow How to Use the Vent GraphStep Horizontal TerminationCenter Hole Line Wallcenter Thimbleline Fold Strap Here Sheet Metal Screw Step Vertical TerminationDirect Vent Pipe Wood Screws Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Existing Masonry Chimney Retro Connector Converting to LP Gas Gas InformationFuel Conversions Remove pilot hood and set aside Valve Regulator ReplacementPressure Gas PressuresCheck for GAS Leaks Gas ConnectionConnecting to the Appliance Recommendation for WireStanding Pilot Ignition System Wiring Wire Size Max. LengthValve RED 28 711 MMAccessories Appliance SetupDoor Crown Installation Remove Shipping MaterialsBrick Set Installation Grille Installation13 Log Set Positioning the LogsMineral Wool 23 Blower Wiring Diagram Blower InstallationShutter Adjustment Damper AdjustmentGlass Replacement Door Frame with Glass Assembly ReplacementControls Operating InstructionsBefore Lighting Appliance Lighting Appliance For Your Safety Read Before LightingAfter Appliance is Lit Frequently Asked QuestionsInitial Break-in Procedure Symptom Possible Cause Corrective Action TroubleshootingBe Placed in this Opening After servicing Maintaining and Servicing Your ApplianceNecessary. USE Caution When CLEANING/HANDLING Ceramic Burner Maintenance Tasks InspectReference Materials Appliance Dimension DiagramSLP Series Vent Components Vent Components DiagramMiscellaneous Vent Components ListRD. Service Parts List At Depot StockedDescription Serial # Part Number DepotValve Components Pedestal Components CONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Hudson Bay Direct Vent Gas Appliance Serial Number Date Purchased Date Installed Dealer Telephone